{"title":"Wood v. Steel: Dawn of Justice","authors":"O. Lynch","doi":"10.1061/9780784481837.033","DOIUrl":"https://doi.org/10.1061/9780784481837.033","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124414451","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Effective Length Factor of Leg Member in Latticed Steel Tower","authors":"M. Lu, M. Hao, D. Chakrabarti","doi":"10.1061/9780784481837.011","DOIUrl":"https://doi.org/10.1061/9780784481837.011","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"93 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114414684","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Aesthetics and Infrastructure: Accomplishing Both with Better Overall Results for Power Delivery Projects","authors":"K. Sharpless, Lynda Kiejko","doi":"10.1061/9780784481837.023","DOIUrl":"https://doi.org/10.1061/9780784481837.023","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"47 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128996997","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Crossing the Delaware with PECO and a 300 ft Tall H-Frame Structure","authors":"G. Faries, Kalpesh Patel","doi":"10.1061/9780784481837.035","DOIUrl":"https://doi.org/10.1061/9780784481837.035","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129436501","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Evaluation of Typical Arm-to-Pole Connections in Slender Steel Pole Transmission Structures for Wind Induced Vibration and Fatigue","authors":"L. Griffis, K. Frank","doi":"10.1061/9780784481837.037","DOIUrl":"https://doi.org/10.1061/9780784481837.037","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"58 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131182946","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Securing Steel Davit Arms: When and How?","authors":"Meihuan Fulk, Blake Tucker, D. Parrish","doi":"10.1061/9780784481837.027","DOIUrl":"https://doi.org/10.1061/9780784481837.027","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"76 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129424268","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Guide for Transmission Line Foundations with Least Impact to Environment","authors":"P. Kandaris, Ashley E. Evans, A. Haldar","doi":"10.1061/9780784481837.005","DOIUrl":"https://doi.org/10.1061/9780784481837.005","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"2015 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128596407","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
R. Chantome, J. Knutelski, D. Ratliff, Kevin Schilling, D. Whalen
{"title":"The Value of Structure-Specific Borings: Statistical Analysis of Electrical Transmission Line Structure Foundation Costs Based on Structure-Specific Borings versus No Borings or Variable Boring Spacing","authors":"R. Chantome, J. Knutelski, D. Ratliff, Kevin Schilling, D. Whalen","doi":"10.1061/9780784481837.007","DOIUrl":"https://doi.org/10.1061/9780784481837.007","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121823987","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Program Considerations for Analysis of Drilled Shaft Foundations","authors":"S. Chitre, J. Coker, Brian Sedgwick","doi":"10.1061/9780784481837.013","DOIUrl":"https://doi.org/10.1061/9780784481837.013","url":null,"abstract":"","PeriodicalId":313370,"journal":{"name":"Electrical Transmission and Substation Structures 2018","volume":"24 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131170087","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}