Jurnal Spesialis Teknik Sipil (JSpTS)最新文献

筛选
英文 中文
ANALISIS PEMBANGUNAN SALURAN IRIGASI MENGGUNAKAN BETON PRACETAK 灌溉渠建设分析使用预制混凝土
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2023-05-12 DOI: 10.30996/jspts.v2i02.8545
Dutha Hepy Zulkarnaen, Wateno Oetomo, Herry Widhiarto
{"title":"ANALISIS PEMBANGUNAN SALURAN IRIGASI MENGGUNAKAN BETON PRACETAK","authors":"Dutha Hepy Zulkarnaen, Wateno Oetomo, Herry Widhiarto","doi":"10.30996/jspts.v2i02.8545","DOIUrl":"https://doi.org/10.30996/jspts.v2i02.8545","url":null,"abstract":"Irrigation area of the Banjaranyar reservoir, the current condition of the irrigation network requires proper maintenance of the irrigation network. Based on these problems, it is necessary to study the maintenance of the irrigation canal of the Banjaranyar reservoir. Therefore, a lot of research is needed on how to realize the building with an effective cost and implementation time. In the sense that with minimal funds, it can produce maximum maintenance work with the right allocation.The analysis is carried out using the critical path method, so it is expected that the time and cost allocations can be calculated with certainty in accordance with the availability of work package time allocations in one budget year with smaller costs during the construction service life.The purpose of this thesis is to analyze the cost of irrigation construction using precast concrete using the critical path method and to analyze the timing of irrigation development using precast concrete using the critical path method.The result of this research is the acceleration from 90 calendar days to 60 calendar days can be done by rescheduling by eliminating the lag time between work activities.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134417304","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS BIAYA DAN MUTU PENGGUNAAN STEEL FIBER PADA RIGID PAVEMENT DENGAN METODE EKSPERIMENTAL LABORATORIUM 用实验方法分析钢制纤维的成本和使用质量
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2023-05-11 DOI: 10.30996/jspts.v2i02.7090
Fajar Romadhon, Risma Marleno
{"title":"ANALISIS BIAYA DAN MUTU PENGGUNAAN STEEL FIBER PADA RIGID PAVEMENT DENGAN METODE EKSPERIMENTAL LABORATORIUM","authors":"Fajar Romadhon, Risma Marleno","doi":"10.30996/jspts.v2i02.7090","DOIUrl":"https://doi.org/10.30996/jspts.v2i02.7090","url":null,"abstract":"Indonesia adalah negara berkembang, konstruksi beton masih menjadi pilihan utama untuk pembangunan di bidang konstruksi di Indonesia.  Dengan melakukan berbagai inovasi pada satu atau lebih komponen pada struktural beton tersebut akan sangat berpengaruh pada penghematan dan penambahan kualitas pada konstruksi beton. Inovasi teknologi beton yang sedang  berkembang di mancanegara saat ini di antaranya adalah teknologi beton dengan campuran serat baja. Penelitian ini bertujuan untuk mengetahui dan membandingkan biaya dan mutu penggunaan serat baja steel fiber (dramix) dan besi tulangan wiremesh pada perkerasan kaku rigid pavement. Metode yang digunakan dalam penelitian ini adalah eksperimental laboratorium. Pada penelitian ini menunjukan  biaya serat baja lebih murah dan ekonomis daripada baja tulangan pada pekerjaan perkerasan kaku. Dalam satuan 1m3 beton dengan besi tulangan wiremesh m8 menghasilkan biaya Rp. 2.138.343,26 dan beton dengan penambahan serat baja steel fiber (dramix) dengan kadar 10% menghasilkan biaya Rp. 1.798.089,00. Terdapat penghematan biaya Rp. 340.254,26 dalam 1m3. Penambahan serat baja pada campuran beton mengalami penambahan kuat tekan pada saat umur 28 hari lebih besar daripada campuran beton normal dengan nilai kuat tekan fc’ 29,07MPa, sedangkan untuk beton dengan penambahan serat baja steel fiber (dramix) dengan kadar 10%: fc’ 29,34MPa, 15%: fc’ 29,38Mpa, 20%: fc’ 29,41MPa, dan 30%: fc’ 29,58Mpa. Pada pengujian kuat lentur beton dengan besi tulangan wiremesh m8, menghasilkan kuat lentur fc’ 4,978MPa. Sedangkan untuk beton dengan penambahan serat baja steel fiber (dramix) kadar 10%: fc’ 5,173Mpa, 15%: fc’ 5,316Mpa, 20%: fc’ 5,458Mpa, dan 30%: fc’ 5,707Mpa.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"105 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124727927","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS KELAYAKAN INVESTASI PENGEMBANGAN JARINGAN AIR BERSIH DI PERUMAHAN GRAHA INDAH TAMBAKRIGADUNG KECAMATAN TIKUNG KABUPATEN LAMONGAN
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2023-05-11 DOI: 10.30996/jspts.v2i02.7097
Budi Witjaksana
{"title":"ANALISIS KELAYAKAN INVESTASI PENGEMBANGAN JARINGAN AIR BERSIH DI PERUMAHAN GRAHA INDAH TAMBAKRIGADUNG KECAMATAN TIKUNG KABUPATEN LAMONGAN","authors":"Budi Witjaksana","doi":"10.30996/jspts.v2i02.7097","DOIUrl":"https://doi.org/10.30996/jspts.v2i02.7097","url":null,"abstract":"Perumahan Graha Indah adalah salah satu wilayah yang berada di Kecamatan Tikung Kabupaten Lamongan yang mempunyai ketersediaan air yang kurang. Keinginan warga perumahan Graha Indah untuk mendapatkan pasokan air bersih dari PDAM yang cukup tinggi. Dalam pelaksanaan system penyediaan air bersih di Perumahan Graha Indah belum dapan berjalan dengan optimal. Dari hasil perhitungan perencanaan dapat diketahui pelayanan kebutuhan air bersih di Perumahan Graha Indah pada tahun proyeksi 2034 debit minimal yang dibutuhkan adalah 0,02707 m3 /dt. Dari Hasil perhitungan biaya pengembangan jaringan pipa adalah Rp. 3,295,526,607. Dari Hasil dilakukannya perhitungan nilai Net Cash Flow NPV adalah Rp. 2,291,168,801. BEP tampak bahwa keutungan atau laba pada tahun ke 9 adalah Rp. 123,545,805, dan pada tahun ke 15, yaitu tahun 2034 Rp. 4.193,389,172. Nilai IRR adalah 14,3% tingkat bunga minimal yang di harapkan adalah 13% maka investasi pengembangan jaringan air bersih layak dijalankan.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115499674","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN KONTRUKSI DECK ON PILE DAN CAKAR AYAM MODIFIKASI (Study Kasus Pekerjaan Pondasi Rubber Tyred Gantry Crane Pads Pelabuhan Trisakti Banjarmasin) 分析工序板和鸡爪构造的时间与成本的比较(二)
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2022-10-12 DOI: 10.30996/jspts.v3i2.8559
D. Hartanto, Laksono Djoko Nugroho, Gede Sarya
{"title":"ANALISIS PERBANDINGAN WAKTU DAN BIAYA PELAKSANAAN KONTRUKSI DECK ON PILE DAN CAKAR AYAM MODIFIKASI (Study Kasus Pekerjaan Pondasi Rubber Tyred Gantry Crane Pads Pelabuhan Trisakti Banjarmasin)","authors":"D. Hartanto, Laksono Djoko Nugroho, Gede Sarya","doi":"10.30996/jspts.v3i2.8559","DOIUrl":"https://doi.org/10.30996/jspts.v3i2.8559","url":null,"abstract":"Trisakti II Port, located in the city of Banjarmasin, South Kalimantan, is one of the ports that uses RTG cranes. Constraints often arise due to the lack of support for the container/CY stockpiling field due to the elevation of the field under the highway. So that when it rains, the container yard is often flooded, causing physical damage to the container and its cargo. And the type of soil in the study area is soft soil, so planning for a good and efficient foundation structure is needed. \u0000The purpose of writing this thesis is to determine the comparison of the costs and construction time used in the modified deck on pile and chicken claw structures. Determine which is more efficient between the deck on pile foundation structure and modified chicken claw. With the method of comparing the total cost of the budget and the time required for the implementation of construction. The results of this study are the results of the comparison of time and cost of deck on pile and modified chicken claw on the RTG Pad foundation work is the modified chicken claw foundation structure is 15% more efficient and 26% faster in execution time with a labor ratio that only differs 1 people per day. In terms of time and cost between deck on pile and modified chicken claw, it is found that the use of modified chicken claw structure is more efficient than deck on pile structure in this RTG Pad foundation work.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"48 4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130851464","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS KETERLAMBATAN PROYEK PERUMAHAN GRIYA EMAS KARANGPLOSO MENGGUNAKAN METODE CPM (CRITICHAL PATH METHOD) 利用CPM方法分析KARANGPLOSO住房项目延迟(CRITICHAL PATH METHOD)
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2022-10-12 DOI: 10.30996/jspts.v3i2.8561
Dito Anarpito, Budi Witjaksana, Priyoto Priyoto
{"title":"ANALISIS KETERLAMBATAN PROYEK PERUMAHAN GRIYA EMAS KARANGPLOSO MENGGUNAKAN METODE CPM (CRITICHAL PATH METHOD)","authors":"Dito Anarpito, Budi Witjaksana, Priyoto Priyoto","doi":"10.30996/jspts.v3i2.8561","DOIUrl":"https://doi.org/10.30996/jspts.v3i2.8561","url":null,"abstract":"The Crashing method that will be used in this research is expected to provide answers to the demands of the optimal duration of the Karangploso Griya Emas Housing development project. The objectives of this study are: 1) Determine the working network or network of Karangploso Griya Emas Housing development projects; 2) Analyzing the optimal time to complete the Karangploso Griya Emas Housing construction project; 3) Analyzing the estimated cost for the Karangploso Griya Emas Housing development project, which will accelerate its completion time. This research uses quantitative research methods, namely research methods with survey methods in the form of data collection through tests or interviews and literature studies by collecting literature in accordance with existing case studies. The information collected is in the form of: housing project specifications, schedule, RAB (Budget Plan), working drawings, number of workers, existing field conditions, number of units built and the progress of activities. The results of this study indicate that: 1) From the results of CPM analysis with the help of Microsoft Project, the work included in critical activities is Soil Galian, 1: 1: 3 River Stone Installation, Sand Foundation Urugan, Inner Soil Urugan, Bata Merah Pair 1 : 3, Plastering Aci and Wall Paint; 2) With CPM Analysis and Crashing method, 40% of workers are added which results in an optimal project duration of 37 days; 3) From the initial cost of the construction project of 1 housing unit, Rp. 37,500,000.00, the total cost obtained after the crash was Rp. 52,650,810.00 with additional costs due to crashing of Rp. 15,150,810.00.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126448673","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALISIS INVESTASI PADA PROYEK PEMBANGUNAN JALAN TOL PASURUAN - PROBOLINGGO 对巴吞鲁越戈高速公路建设项目的投资分析
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2022-10-12 DOI: 10.30996/jspts.v3i2.8563
Angga Abimanyu, Sri Wiwoho Mudjanarko, Hary Moetriono
{"title":"ANALISIS INVESTASI PADA PROYEK PEMBANGUNAN JALAN TOL PASURUAN - PROBOLINGGO","authors":"Angga Abimanyu, Sri Wiwoho Mudjanarko, Hary Moetriono","doi":"10.30996/jspts.v3i2.8563","DOIUrl":"https://doi.org/10.30996/jspts.v3i2.8563","url":null,"abstract":"Toll roads are public roads that are part of the road network system and as national roads, for which users are required to pay tolls. The existence of toll roads is very important in the smooth flow of traffic along with the increasing amount of traffic caused by the increase in the number of vehicles and the condition of arterial road pavements that have been damaged (wavy and cracked) at several locations on the road and congestion that occurs due to damaged roads. damaged. The benefits of toll road operations are to influence regional development and economic improvement, as well as increase mobility and accessibility of people and goods, also provide benefits to users in the form of saving vehicle operating costs (BOK) and time compared to passing through non-toll roads, as well as providing returns on investment, maintenance, and toll road development for the Business Entities involved. One form of cooperation between the government and the private sector is the construction of the Pasuruan-Probolinggo (Paspro) Toll Road. Through the Toll Road Business Entity (BUJT) PT. Trans-Java Paspro Toll Road, the government cooperates in the construction of a 31 km toll road. PT. Trans-Java Paspro Toll Road received a 45-year concession to operate the toll road. The purpose of this study was to determine the investment feasibility of the Pasuruan-Probolinggo Toll Road based on the investment feasibility parameters of Net Present Value (NPV), Benefit Cost Ratio (B/C Ratio), Internal Rate Return (IRR), Payback Period (PBP), and determine the length of time. payback period (Payback Period) Pasuruan-Probolinggo Toll Road, and get a comparison of Vehicle Operating Costs (BOK) between Toll Roads and Arterial Roads. The final result of the analysis obtained that the NPV value was negative Rp. -1,773,803,000,000, and the IRR value is 9.56%, which is smaller than WACC = 13.07%, and the BCR value is less than 1.00, which is 0.763 so that it can be seen that the investment is not financially feasible for investors. However, BEP < 45 years concession period is April 2043, so it can be seen that it is still in the feasible category. The Vehicle Operational Cost (BOK) for arterial roads is Rp. 3,647/km for Goal I, Rp. 6,413/km for Gol II, Rp. 9,498/km for Gol III, Gol IV, and Gol V. Meanwhile, BOK for toll roads and added toll tariffs of Rp. 3.226/km for Goal I, Rp. 6,767/km for Gol II, Rp. 7,763/km for Gol III, Rp. 8.113/km for Gol IV and Rp. 8,463 for Gol V. From the analysis it is known that the cost of passing through the toll road is cheaper than going through the arterial road for all vehicle classes and is certainly very beneficial for toll road users.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124907793","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP KETERLAMBATAN PELAKSANAAN PEKERJAAN PENINGKATAN/PELEBARANJALAN GONDORUSO-JUGOSARI KECAMATAN PASIRIAN KABUPATEN LUMAJANG
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2022-10-12 DOI: 10.30996/jspts.v3i2.8560
Hendrik Prayitno, Budi Witjaksana, M. Huda
{"title":"FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP KETERLAMBATAN PELAKSANAAN PEKERJAAN PENINGKATAN/PELEBARANJALAN GONDORUSO-JUGOSARI KECAMATAN PASIRIAN KABUPATEN LUMAJANG","authors":"Hendrik Prayitno, Budi Witjaksana, M. Huda","doi":"10.30996/jspts.v3i2.8560","DOIUrl":"https://doi.org/10.30996/jspts.v3i2.8560","url":null,"abstract":"Implementation of a project is very rarely encountered a project that runs exactly as planned. Project delays are often a source of disputes and claims between the owner and the contractor, so the value will be very expensive in terms of both the contractor and the owner. In general, project delays often occur due to changes in planning during the implementation process, poor managerial and contracting organizations, work plans that are not well managed and integrated, drawings and specifications are incomplete, or the contractor's failure to carry out the work. \u0000             This study aims to determine the factors that influence the delay in the implementation of the work on the improvement / widening of the gondoruso-jugosari road in the district of Pasirian Lumajang district and the efficiency of time and cost of the project after the addition of the optimum workers in the improvement / widening project of Jalan Gondoruso - Jugosari, Pasirian District, Lumajang Regency. Analysis using regression analysis and crash program methods. \u0000             Based on the results of the analysis concluded that the factors that influencefor delays in carrying out the work improvement / widening of Gondoruso - Jugosari Road, Pasirian District Lumajang Regency is a factor of the Work Environment and Materials / Materials and the result of acceleration using the crashing method with the addition of 14% of the workforce obtained an acceleration of 6 days from a total duration of 54 days for the work of Concrete Pavement Pavement with Single Reinforced Matting (Fs 45 cm thick 25 cm) to 48 days with a cost slope of Rp. 99,281,345,15.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116469684","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ANALYSIS OF THE VALUE OF ENGINEERING COST AND TIME OF REPLACEMENT OF RED BRICK WITH LIGHT BRICK ON PROJECT BUILDING CONSTRUCTION OF BLOOD TRANSFUSION UNIT IN PASURUAN 巴苏鲁输血站工程建筑以轻砖替代红砖的工程造价及工期分析
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2022-10-12 DOI: 10.30996/jspts.v3i2.8558
Didik Krismariyanto, Budi Witjaksana, H. T. Tjendani
{"title":"ANALYSIS OF THE VALUE OF ENGINEERING COST AND TIME OF REPLACEMENT OF RED BRICK WITH LIGHT BRICK ON PROJECT BUILDING CONSTRUCTION OF BLOOD TRANSFUSION UNIT IN PASURUAN","authors":"Didik Krismariyanto, Budi Witjaksana, H. T. Tjendani","doi":"10.30996/jspts.v3i2.8558","DOIUrl":"https://doi.org/10.30996/jspts.v3i2.8558","url":null,"abstract":"The problem in the development of the blood transfusion Unit of Pasuruan building is the cost and time available are limited so the need to do value engineering. Value engineering is used to seek out alternatives or ideas aimed at generating a better or lower cost than the previously planned price with functional restrictions and job quality. So that the results of this value engineering research are expected, that if the work item is following the initial design after the change with an alternative design will be obtained more efficiently in terms of cost plan and time allocation required. The results of the analysis of engineering values for wall items by proposing alternative material instead of initial material, resulting in cost savings of Rp. 7.343.228,77,-from the initial cost. Value engineering can be applied at any time of the project, from the beginning to completion of the project development.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127858289","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
PENENTUAN PRIORITAS PEMELIHARAAN JALAN KABUPATEN BERDASARKAN KETERSEDIAAN DANA DAN WAKTU 根据资金和时间的可用性,确定地区道路维护的优先事项
Jurnal Spesialis Teknik Sipil (JSpTS) Pub Date : 2021-10-15 DOI: 10.30996/jspts.v2i02.7075
Adhitya Putra Purwanto Utomo, Wateno Oetomo
{"title":"PENENTUAN PRIORITAS PEMELIHARAAN JALAN KABUPATEN BERDASARKAN KETERSEDIAAN DANA DAN WAKTU","authors":"Adhitya Putra Purwanto Utomo, Wateno Oetomo","doi":"10.30996/jspts.v2i02.7075","DOIUrl":"https://doi.org/10.30996/jspts.v2i02.7075","url":null,"abstract":"Prasarana jalan merupakan sarana dan prasarana publik yang harus dapat dirasakan keberadaannya oleh seluruh lapisan masyarakat maka sebagai konsekuensinya hak penguasaan dan wewenangnya dilakukan oleh pemerintah dan diharapkan setiap daerah mampu mengembangkan sistem penyelenggaraan pelayanan kepada masyarakat yang lebih akomodatif terhadap kebutuhan masyarakat setempat agar prasarana tersebut dapat dirasakan sebaik mungkin maka perlu dibutuhkan pemeliharaan akan prasarana tersebut.Tujuan dari penulisan tesis ini adalah untuk mengidentifikasi tingkat kerusakan jalan untuk menuntukan skala prioritas penanganan dan mengevaluasi, mengestimasi dan merencanakan pekerjaan berdasarkan biaya yang dianggarkan dan waktu dengan metode Methode Analytcal Hierarchy Process.  Hasil dari penelitian ini adalah Identifikasi data jaringan dan kerusakan jalan pada ruas-ruas jalan kabupaten di Wilayah Selatan Kabupaten Lamongan untuk mendapatkan penanganan sesuai kebutuhan. Adapun kriteria yang memperoleh prioritas paling tinggi adalah kondisi struktur jalan dengan bobot 61 %, prioritas kedua kriteria kondisi lalu lintas dengan bobot 30 %, dan prioritas ketiga kriteria kondisi jenis perkerasan dengan bobot 0,09 %","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130236024","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书