ANALISIS KETERLAMBATAN PROYEK PERUMAHAN GRIYA EMAS KARANGPLOSO MENGGUNAKAN METODE CPM (CRITICHAL PATH METHOD)

Dito Anarpito, Budi Witjaksana, Priyoto Priyoto
{"title":"ANALISIS KETERLAMBATAN PROYEK PERUMAHAN GRIYA EMAS KARANGPLOSO MENGGUNAKAN METODE CPM (CRITICHAL PATH METHOD)","authors":"Dito Anarpito, Budi Witjaksana, Priyoto Priyoto","doi":"10.30996/jspts.v3i2.8561","DOIUrl":null,"url":null,"abstract":"The Crashing method that will be used in this research is expected to provide answers to the demands of the optimal duration of the Karangploso Griya Emas Housing development project. The objectives of this study are: 1) Determine the working network or network of Karangploso Griya Emas Housing development projects; 2) Analyzing the optimal time to complete the Karangploso Griya Emas Housing construction project; 3) Analyzing the estimated cost for the Karangploso Griya Emas Housing development project, which will accelerate its completion time. This research uses quantitative research methods, namely research methods with survey methods in the form of data collection through tests or interviews and literature studies by collecting literature in accordance with existing case studies. The information collected is in the form of: housing project specifications, schedule, RAB (Budget Plan), working drawings, number of workers, existing field conditions, number of units built and the progress of activities. The results of this study indicate that: 1) From the results of CPM analysis with the help of Microsoft Project, the work included in critical activities is Soil Galian, 1: 1: 3 River Stone Installation, Sand Foundation Urugan, Inner Soil Urugan, Bata Merah Pair 1 : 3, Plastering Aci and Wall Paint; 2) With CPM Analysis and Crashing method, 40% of workers are added which results in an optimal project duration of 37 days; 3) From the initial cost of the construction project of 1 housing unit, Rp. 37,500,000.00, the total cost obtained after the crash was Rp. 52,650,810.00 with additional costs due to crashing of Rp. 15,150,810.00.","PeriodicalId":309753,"journal":{"name":"Jurnal Spesialis Teknik Sipil (JSpTS)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Spesialis Teknik Sipil (JSpTS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30996/jspts.v3i2.8561","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Crashing method that will be used in this research is expected to provide answers to the demands of the optimal duration of the Karangploso Griya Emas Housing development project. The objectives of this study are: 1) Determine the working network or network of Karangploso Griya Emas Housing development projects; 2) Analyzing the optimal time to complete the Karangploso Griya Emas Housing construction project; 3) Analyzing the estimated cost for the Karangploso Griya Emas Housing development project, which will accelerate its completion time. This research uses quantitative research methods, namely research methods with survey methods in the form of data collection through tests or interviews and literature studies by collecting literature in accordance with existing case studies. The information collected is in the form of: housing project specifications, schedule, RAB (Budget Plan), working drawings, number of workers, existing field conditions, number of units built and the progress of activities. The results of this study indicate that: 1) From the results of CPM analysis with the help of Microsoft Project, the work included in critical activities is Soil Galian, 1: 1: 3 River Stone Installation, Sand Foundation Urugan, Inner Soil Urugan, Bata Merah Pair 1 : 3, Plastering Aci and Wall Paint; 2) With CPM Analysis and Crashing method, 40% of workers are added which results in an optimal project duration of 37 days; 3) From the initial cost of the construction project of 1 housing unit, Rp. 37,500,000.00, the total cost obtained after the crash was Rp. 52,650,810.00 with additional costs due to crashing of Rp. 15,150,810.00.
利用CPM方法分析KARANGPLOSO住房项目延迟(CRITICHAL PATH METHOD)
本研究将使用的crash方法有望为Karangploso Griya Emas住房开发项目的最佳持续时间需求提供答案。本研究的目的是:1)确定Karangploso Griya Emas住房开发项目的工作网络或网络;2) Karangploso Griya Emas住宅建设项目最优完工时间分析;3)分析Karangploso Griya Emas住宅开发项目的预计成本,这将加快其完工时间。本研究采用定量研究方法,即调查法的研究方法,通过测试或访谈的形式收集数据,并根据已有的案例研究收集文献进行文献研究。收集到的信息包括:住房项目规格、时间表、预算计划(RAB)、施工图、工人人数、现有现场条件、建造单位数量和活动进度。研究结果表明:1)在Microsoft Project的帮助下,CPM分析结果表明,关键活动中包含的工作是土壤加力,1:1:3河石安装,砂基础Urugan,内土Urugan, Bata Merah Pair 1:3,抹灰酸和墙漆;2)采用CPM分析法和crash法,增加40%的工人,得到最优工期为37天;3)从1个住房单元建设项目的初始成本Rp. 37,500,000.00计算,坠机后获得的总成本为Rp. 52,650,810.00,坠机造成的额外成本为Rp. 15,150,810.00。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书