An Architect’s Guide to Public Procurement最新文献

筛选
英文 中文
Qualification barriers 资格门槛
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-5
F. Garvey
{"title":"Qualification barriers","authors":"F. Garvey","doi":"10.4324/9780429346910-5","DOIUrl":"https://doi.org/10.4324/9780429346910-5","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"152 7","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"120997382","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Influencing the buyer 影响买家
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-9
F. Garvey
{"title":"Influencing the buyer","authors":"F. Garvey","doi":"10.4324/9780429346910-9","DOIUrl":"https://doi.org/10.4324/9780429346910-9","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122789897","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Portfolio planning 投资组合计划
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-11
F. Garvey
{"title":"Portfolio planning","authors":"F. Garvey","doi":"10.4324/9780429346910-11","DOIUrl":"https://doi.org/10.4324/9780429346910-11","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"25 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126788723","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Learning through participation 参与学习
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-13
F. Garvey
{"title":"Learning through participation","authors":"F. Garvey","doi":"10.4324/9780429346910-13","DOIUrl":"https://doi.org/10.4324/9780429346910-13","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121671608","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Analysing notices 分析的通知
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-12
F. Garvey
{"title":"Analysing notices","authors":"F. Garvey","doi":"10.4324/9780429346910-12","DOIUrl":"https://doi.org/10.4324/9780429346910-12","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114231160","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Direct and indirect means of participation 直接和间接的参与方式
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-4
F. Garvey
{"title":"Direct and indirect means of participation","authors":"F. Garvey","doi":"10.4324/9780429346910-4","DOIUrl":"https://doi.org/10.4324/9780429346910-4","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"54 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127087287","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Procurement procedures 采购程序
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-2
F. Garvey
{"title":"Procurement procedures","authors":"F. Garvey","doi":"10.4324/9780429346910-2","DOIUrl":"https://doi.org/10.4324/9780429346910-2","url":null,"abstract":"The UNU procures goods and services through competitive solicitations. Three standard types of Solicitation Documents, namely Request for Quotation (RFQ), Invitation to Bid (ITB) and Request for Proposal (RFP) is used. The selection of the type of procurement takes into account prudent commercial practices and considers the use of a competitive selection process appropriate within the particular industry for the goods, services or works being sought.","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"161 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122623538","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
The architect’s rights 建筑师的权利
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-7
F. Garvey
{"title":"The architect’s rights","authors":"F. Garvey","doi":"10.4324/9780429346910-7","DOIUrl":"https://doi.org/10.4324/9780429346910-7","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130142327","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Planning for the future 规划未来
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-14
F. Garvey
{"title":"Planning for the future","authors":"F. Garvey","doi":"10.4324/9780429346910-14","DOIUrl":"https://doi.org/10.4324/9780429346910-14","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"18 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127975051","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Challenging the outcomes 挑战结果
An Architect’s Guide to Public Procurement Pub Date : 2019-07-25 DOI: 10.4324/9780429346910-8
F. Garvey
{"title":"Challenging the outcomes","authors":"F. Garvey","doi":"10.4324/9780429346910-8","DOIUrl":"https://doi.org/10.4324/9780429346910-8","url":null,"abstract":"","PeriodicalId":294078,"journal":{"name":"An Architect’s Guide to Public Procurement","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121802696","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信