{"title":"Effectiveness of Solid Waste Management Programs in Kenya: A Case of Kilifi County","authors":"C. Kazungu, J. Kisimbii","doi":"10.47941/JEPM.475","DOIUrl":"https://doi.org/10.47941/JEPM.475","url":null,"abstract":"Purpose: The study was therefore done to evaluate the Efficiency of Solid Waste Management Programs in Kenya- specifically Kilifi County, being guided by four specific objectives; How Public-Private Partnership(X1), Community Participation (X2), Budget Allocation (X3) and Government Policy (X4) Influence Effective SWM Programs in Kilifi county.Methodology: Descriptive design with the target population of 1,453,787drawn from Kilifi County where multistage and random sampling techniques gave sample size of 72 subjects. Data was captured using questionnaires. Data analysis was through descriptive statistics and chi square to ascertain effect of the variables using SPSS.Findings: Findings were that all the four variables of the study indeed have effect to SWM programs in Kenya. X1 Hypothesis test results revealed that the calculated χ2(223.4 = P< .001). While X2 indicated that, the Cχ2 =268.5 = P-value in the asymptotic significance column was 0.00001. X3 revealed Cχ2 =216.9 where P-value was .00001. And X4 established χ2C=201.88 with P Value and P-value was 0.0001. The study rejected all the HO and accepted H1 which established there was relationship between all the study variables and waste management programs. Illustration of R=0.532 represents the simple correlation; therefore, a moderate positive linear relationship among independent variables and effective SWM programs in Kenya existed. R2=0.283 which indicated the total difference the dependent variable is clarified by the independent variables. In this case, the four independent variables explained 28.3% of the variability in effective SWM programs in Kenya and 72.7% variation in sustainable implementation being described by external issues not discussed in this research project. Regression analysis was done model equation; Effective SWM Programs (Y) =3.197+ 0.188 Public-Private Partnership (X1) + 0.213 (Community Participation (X2) + 0.177 (Budget Allocation (X3) + 0.080(Government Policies (X4). The model described that all the elements had a positive influence on the effective SWM programs. This regression equation proved that when all other elements are held constant (no determinants or elements) effective SWM programs would be 3.197. The study concluded, public-private partnership and availability and proper management of budget allocation as key determinants of effectiveness of the SWM programs.Unique contribution to theory, policy and practice: It also uncovered that community participation greatly weighs in on the performance of SWM programs thus improved greatly efficiency and effectiveness of the programs. Lastly, proper government policies must be imposed to ensure legal policy and regulatory frameworks to ensure proper governance of SWM programs and sustainability. Future research required in all Counties across the Country. This will bring relevant information that could be useful for policy framework that focuses on to promoting effectiveness of the SWM in Kenya.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"79 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128290488","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DETERMINANTS OF PERFORMANCE OF SANITATION PROJECTS IN INFORMAL SETTLEMENTS IN KENYA: A CASE OF KIAMBIU, KAMUKUNJI SUB COUNTY, NAIROBI, KENYA.","authors":"Douglas Mogire, P. Ngugi","doi":"10.47941/jepm.343","DOIUrl":"https://doi.org/10.47941/jepm.343","url":null,"abstract":"Purpose: The general objective of the study is to establish Determinants of performance of sanitation projects in informal settlements in Kenya. Specific objectives were to assess the effect of project quality, project stakeholder participation, project team development and project resources on performance of sanitation projects in informal settlements in Kenya.Methodology: The study adopted a descriptive research design. Stratified random sampling was used to divide the population into different strata i.e. Project Managers, Project Engineers and Project Architectures so as to draw randomly a predetermined number of units. The collected data was coded and analyzed using the Statistical Program for Social Sciences (SPSS) version 20 because of its ability to analyze data easily and accurately. ANOVA (analysis of variance), multi-regression data analysis methods was applied to analyze the data obtained from the study. The findings was presented by use of bar charts, graphs, tables and pie charts. A multivariate regression model was applied to determine the relative importance of each of the four variables with respect to factors influencing the success of sanitation projects in informal settlements a case of Kiambiu Slums, Kamukunji Sub County.Results: Correlations analysis was then conducted at 95% confidence interval and 5% confidence level 2-tailed., Results showed that there is a positive relationship between all the four factors and success of sanitation projects in informal settlements. The positive relationship indicates that there is a correlation between the factors and the success of sanitation projects in informal settlements. Based on the correlation coefficients, Project quality have the highest influence on success of sanitation projects in informal settlements at r = 0.763 and p = 0.040, followed by Stakeholder participation at r = 0.632 and p = 0.009, then Project team at r =0.614 and p = 0.022 while Project resources had the least influence on success of sanitation projects in informal settlements at r = 0.596 and p = 0.016.Conclusion: The study concludes that Project managers should focus on making sure that stakeholders are understood in terms of their quality needs. It also involves determining what quality outputs will be exchanged over the course of the project for example status updates, minutes of meetings, reports on deliverables. Project managers should make careful plans to outline who receives which quality, who is responsible to deliver and respond to quality content, and how and when quality will be deliveredPolicy Recommendation: The study recommended that Quality plans should be executed and monitored over the course of project implementation and throughout until project is completed","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"55 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128363387","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Ronald Kwena, E. Mukulu, Joyce Nzulwa, R. Odhiambo
{"title":"MODERATING EFFECT OF PROJECT ENVIRONMENT ON THE RELATIONSHIP BETWEEN CONSTRAINED PROGRAMMING AND PROJECT OUTCOMES IN UNITED NATIONS AGENCIES IN KENYA.","authors":"Ronald Kwena, E. Mukulu, Joyce Nzulwa, R. Odhiambo","doi":"10.47941/JEPM.321","DOIUrl":"https://doi.org/10.47941/JEPM.321","url":null,"abstract":"Purpose: The aim of the study was to establish the moderating effect of project environment on the relationship between constrained programming and project outcomes in United Nations Agencies in Kenya.Methodology: A cross sectional survey is a method that involves the analysis of data collected from a population, or a representative subset, at one specific point in time (Orodho, 2011). This design is used to gather data on more than one case at a single point in time in order to collect a body of quantitative data in connection to the variables. The study picked data for projects and sought to investigate the concept trends and status of project outcomes at a particular period (2014-2018).Results: The results indicated that the geographical environment affect project outcomes (4.565); Social Cultural environment inhibit project outcomes (3.875); Beliefs and traditions affect project outcomes (4.670); Political instability hinders success of project outcomes (3.734) and technological changes affect project outcomes (3.713). The findings revealed the moderating effect of project environment on the relationship between constrained programming and project outcomes in UN agencies in Kenya.Contribution to policy, practice and theory: Humanitarian projects should realize that in the present project environment, constrained programming forms an important element of intangible assets of the UN agencies. These should be reconfigured to ensure that the projects seize opportunities, are proactive in the market place, make new product and process innovations.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"77 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130036284","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"HOW PRODUCT STRATEGY IN THE MARKETING MIX IS AFFECTING THE GROWTH OF JUA KALI ENTERPRISES IN NORTH IMENTI SUB-COUNTY","authors":"Gatobu Kanana, P. Gichohi, A. Moguche","doi":"10.47941/jepm.322","DOIUrl":"https://doi.org/10.47941/jepm.322","url":null,"abstract":"Purpose: This study aim was to investigate the effect product strategy on the growth of jua kali Enterprise in North Imenti Sub County, Meru County. The study hypothesized that there is no significant relationship between product and growth of jua kali enterprises.Methodology: The study adopted a descriptive research design. The population comprised of one hundred and twenty eight (128) owner of jua kali enterprises operating within North Imenti Sub County, Meru County and registered by Micro and Small Enterprises Authority Kenya (MSEA-K). A stratified random sampling technique was used to select a sample of ninety seven (97) jua kali enterprises from the total population. Data was collected using a structured questionnaire after which mean and standard deviation were computed while Pearson Correlation, and linear regression done accordingly. Statistical Package for Social Sciences (SPSS) version 22 was used as a statistical tool.Results: The results indicated that there is growth in jua kali sector which is contributed by product strategy. The study established that product strategy affects growth of jua kali enterprises hence rejecting the hypothesis. It was therefore concluded that product strategy significantly affects SME’s growth.Contributions to policy, practice and theory: The study recommends that; SMEs should invest in their products to ensure they are of desirable quality in order to satisfy their customers and maintain a competitive edge. The study is valuable to entrepreneurs as they seek for better product strategies to grow their enterprises.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126624654","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"INFLUENCE OF LOW-COST BUILDING MATERIALS ON HOUSING PROJECT IN REDUCTION OF HOUSING DEFICIT IN NAIROBI CITY COUNTY, KENYA","authors":"Kamau Maina, S. Paul","doi":"10.47941/JEPM.304","DOIUrl":"https://doi.org/10.47941/JEPM.304","url":null,"abstract":"Purpose: The purpose of the study was to explore the influence of low cost building materials on reduction of housing deficit in Nairobi County, Kenya.Methodology: The study adopted four theories: open innovations theory, the value theory, transformational leadership theory, and institutional theory. Methodologically, the study adopted a descriptive research design, while the population of this study was all the real estate firms registered by Kenya Property Developers Association (KPDA). Census technique was employed to collect data from all 69 real estate firms using questionnaires. Questionnaires were applied to collect primary data, where the researcher trained research assistants to aid the data collection procedure. A pilot-test was conducted as an approach to establishing both the reliability and validity assessments of the questionnaire. Statistical packages for social sciences (SPSS) was used to undertake both descriptive and inferential statistical computations.Results: The findings of the study established that the use of technology enhances the capability and capacity of construction firms to use an array of building materials. The study found that use of modern technology defined skilled labour because most organizations are leveraging technology as a basis of realizing competitive advantage. It also established that real estate firms utilize competent based human resource management firms to hire qualified personnel. In addition, it was evident that personality traits influenced adoption of new technology in the construction of low cost housing, whereas knowledge and attitudes, and skills were significantly attributed to adoption of new technology.Unique contribution to theory, practice and policy: In light of the research findings, the study recommends that organizations should leverage modern technology as a basis of realizing efficiency, effectiveness, and sustainability of projects. The study likewise recommends that organizations should build capacities to enhance labour productivity. In addition, the study recommends that organizations should adopt transformational leadership approaches as a basis of enhancing performance. The study recommends the need to revise the legal framework with a view to ensure that it reflects the changing needs of the project requirements.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"60 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115640563","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"CRITICAL FACTORS INFLUENCING IMPLEMENTATION OF ROAD PROJECTS IN KENYA","authors":"Nelly Jebitok, Joyce Nzulwa","doi":"10.47941/JEPM.302","DOIUrl":"https://doi.org/10.47941/JEPM.302","url":null,"abstract":"Purpose: The Purpose of the study was to establish Critical factors influencing implementation of road projects.Methodology: The study adopted a descriptive survey design. The target population of the study was all the road engineers, middle managers in department of KRB. The sample size was 188 respondents. Data collected was cleaned, pretested, validated, and coded, summarized and analyzed using statistical package of SPSS V23. The study findings were presented using graphs, histograms, bar charts and pie charts. Conclusions were derived based on the P.value and the coefficient of determination. Results: The study found that the key significant determinants of sustainability of water projects in Machakos County were capacity of the project management, government policies, monitoring and resource support. The study concluded that project management capacity had the greatest determinant ofsustainabilityofwater projects in Machakos County, followed by resource support, then monitoring while government policy had the least determinant of sustainability of water projects in Machakos County.Contribution to policy and practice: The study recommends that the government should advocate for proper planning with involvement of the benefiting community and timely implementation with the required results. This can be done through making of a policy by the ministry demanding for the practice of the same by the involved organizations. The project committee should set up financial structures considering both rising of funds and dissemination of the same in relation to operating and maintaining of the project. This can be done through learning and training on the same. The study also recommended that water beneficiaries and management should be sensitized to improve their knowledge on conservation and protection of water facilities.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131190360","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DETERMINANTS OF SUCCESSFUL IMPLEMENTATION OF DIGITAL LITERACY PROJECT IN PUBLIC PRIMARY SCHOOLS IN BARINGO COUNTY, KENYA","authors":"Florence Sutter, Allan S. N. Kihara","doi":"10.47941/jepm.297","DOIUrl":"https://doi.org/10.47941/jepm.297","url":null,"abstract":"Purpose: The study aimed at finding out the determinants of successful implementation of digital literacy project in public primary schools in Baringo County in Kenya. The specific objectives of the study were to determine the effect of school leadership, information communication technology teacher competence, and teacher workload and information communication technology infrastructure. The study was founded on Technology Acceptance Theory, Resource Based Theory, Upper Echelons Theory and the Technology, Organization and Environment Model theories. This study adopted a descriptive survey research design. Methodology: The study targeted 612 stakeholders in the implementation of the Digital Literacy Project in public schools including the Ministry of education Science and Technology representative who is the Sub county Directors, the TSC Sub County Directors, curriculum support officers in the County, the Kenya Institute of Special Education Sub County coordinators, the Kenya Primary Schools Head Teachers Association Sub County coordinators, the Kenya National Union of Teachers Sub County coordinators and the head teachers of the public primary schools in Baringo county. Yamane formula was used to determine a sample size of 150 respondents. Structured questionnaire presented in likert scale were used in collecting primary data. Descriptive statistics such as percentages, mean and frequency was used to analyze the collected data. The study also used inferential statistics such as correlation and regression. Results: The study found that school leader of technology encourage use of technology in teaching and learning and help teachers establish goals to implementation of technology in achieving their instructional strategies and that school leader’s interest; their commitment and championing implementation of ICT programs in schools positively influenced the whole process. The study concluded that school leadership had the greatest influence on implementation of digital literacy project in public primary schools in Baringo County in Kenya in Kenya followed by ICT infrastructure, then teachers ICT competence while teachers’ workload had the least influence on the implementation of digital literacy project in public primary schools in Baringo County in Kenya.Contribution to policy and practice: The study recommends that the school leaders should increase their compliance with the various policies so as to ensure more effective integration of learning and teaching in primary schools and that school administration and stakeholders in education needs to be more supportive towards implementation of ICT programs.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131375367","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DETERMINANTS OF SUSTAINABILITY OF WATER PROJECTS AT MACHAKOS COUNTY IN KENYA","authors":"Nganga Lillian, J. Mutiso","doi":"10.47941/JEPM.300","DOIUrl":"https://doi.org/10.47941/JEPM.300","url":null,"abstract":"Purpose: The study sought to establish the determinants of sustainability of water projects in Machakos County, Kenya. Specifically, the study sought to establish the effect of project management capacity, government policies, resource support and monitoring on sustainability of water projects in Machakos County Kenya. The study was guided by Project Management Competency Model, Policy Theory, Resource Based View Theory and Program Theory.Methodology:The target population comprised of 244 water projects in the county implemented by the county government, national government community and non-governmental organizations. The unit of observation was water project managers. A descriptive research design was adopted in the study. The study applied Yamane sampling formula to derive a sample of 151 respondents to be involved in the study. The study used quantitative data that was collected from respondents using 5-point Likert scales questionnaire with closed ended questions. Data was analyzed using Statistical Package for Social Sciences (SPSS). Both descriptive and inferential statistics were used. The study findings were presented through tables and figures.Results: The study found that the key significant determinants of sustainability of water projects in Machakos County were capacity of the project management, government policies, monitoring and resource support. The study concluded that project management capacity had the greatest determinant of sustainability of water projects in Machakos County, followed by resource support, then monitoring while government policy had the least determinant of sustainability of water projects in Machakos County.Contribution to policy and practice: The study recommends that the government should advocate for proper planning with involvement of the benefiting community and timely implementation with the required results. This can be done through making of a policy by the ministry demanding for the practice of the same by the involved organizations. The project committee should set up financial structures considering both rising of funds and dissemination of the same in relation to operating and maintaining of the project. This can be done through learning and training on the same. The study also recommended that water beneficiaries and management should be sensitized to improve their knowledge on conservation and protection of water facilities from mismanagement and destructions. Community members should be involved in the determination of the water sale rates. County governments and the general management of the water projects in Kenya should ensure that the local community members are trained to do minor repairs.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"22 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123415044","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"DETERMINANTS OF PROJECT IMPLEMENTATION ON PERFORMANCE OF REAL ESTATE PROJECTS FINANCED BY REGISTERED SACCOS IN NAIROBI CITY COUNTY, KENYA.","authors":"Hamida Wambui Masasabi, Christine Ngari","doi":"10.47941/jepm.292","DOIUrl":"https://doi.org/10.47941/jepm.292","url":null,"abstract":"Purpose: The performance of projects in the Kenyan land development industry has of late been tempestuous. The study was particularly centered on the impact of task planning, venture correspondence, asset accessibility and partner's association on usage of land ventures actualized by SACCOS. The investigation was guided by the following specific objectives: to analyze the influence of project planning on performance of real estate projects financed by registered SACCOS in Nairobi City County; to establish the influence of project communication management on performance of real estate projects financed by registered SACCOS in Nairobi City County; to assess the influence of stakeholder involvement on performance of real estate projects financed by registered SACCOS in Nairobi City County; and to assess the influence of resource availability on performance of real estate projects financed by registered SACCOS in Nairobi City County.Methodology: The study utilized descriptive examination outline. The target population of this study comprised of all the 153 land development ventures being actualized by the 38 SACCOS enrolled by SASRA in Nairobi County. The examination used census on all the land ventures. Statistical Package for Social Sciences computer programming was utilized for examination. Both descriptive and inferential investigation was directed.Results: An excellent response rate of 94.7% was realized. It was established that most of the project implementation indicators have positive impact on performance of the real estate projects. The study further adopted a regression analysis to determine the relationship between the variables. The study findings showed that the four variables had a significant influence on performance of the real estate projects.Contribution to policy and practice: The study recommended that a similar research should be conducted with an aim at investigating the determinates of project implementation on the performance of real estate projects financed by registered SACCOS in Nairobi with other variables or of other firms in other sectors, including the other counties in the Kenya. The findings showed that 69.4 % of the performance is explained by the four variables while 30.6 can be accounted by other factors captured by the standard error. ","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"21 2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123271433","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"INFLUENCE OF STAKEHOLDER INVOLVEMENT ON THE SUCCESSFUL IMPLEMENTATION OF PROJECTS AT KENYA RAILWAYS CORPORATION IN KENYA","authors":"Vaati Anne, S. Paul","doi":"10.47941/jepm.286","DOIUrl":"https://doi.org/10.47941/jepm.286","url":null,"abstract":"Purpose: The purpose of this study was be to examine the influence of stakeholders’ involvement on successful implementation of projects in Kenya with reference to Kenya Railways Corporation.Methodology: This research used descriptive research design. The population of the study was the project officers, project managers/team, contractors, consultant’s engineers and architects, financial managers and auditors. This research adopted primary and secondary data.Primary data was gathered through use of questionnaire. Data was analyzed using Statistical Packages for Social Sciences (SPSS Version 21).Results: According to the findings, taking all factors (project team competency, stakeholders’ involvement, top management support and project monitoring and evaluation) constant at zero, the overall successful implementation of projects in Kenya was 5.774. The data findings also show that a unit increase in project monitoring and evaluation lead to a 0.362increase successful implementation of projects in Kenya; a unit increase project team competency lead to a 0.379; a unit increase in top management support, lead to a 0.355; a unit increase in stakeholders’ involvement lead to a 0.398 increase in successful implementation of projects in Kenya respectively. This means that the most significant variable was stakeholders’ involvement followed by project team competency; top management support and project monitoring and evaluation respectively.Recommendations: The study recommends that stakeholder’s involvement should be improved in project implementation. The study also recommends that a competent project leader be given the responsibility to oversee the implementation of projects in Kenya Railways Corporation to ensure projects are effectively implemented.","PeriodicalId":293107,"journal":{"name":"Journal of Entrepreneurship and Project Management","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124949424","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}