Preparing Construction Claims最新文献

筛选
英文 中文
Records and Notices 记录及通告
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch5
{"title":"Records and Notices","authors":"","doi":"10.1002/9781119166528.ch5","DOIUrl":"https://doi.org/10.1002/9781119166528.ch5","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"46 38 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124673447","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Direct Costs of Changes/Variations 变更/变更的直接成本
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch8
{"title":"Direct Costs of Changes/Variations","authors":"","doi":"10.1002/9781119166528.ch8","DOIUrl":"https://doi.org/10.1002/9781119166528.ch8","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121686379","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Delay Analysis 延误分析
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch7
D. Rohini, R. Chimmalgi
{"title":"Delay Analysis","authors":"D. Rohini, R. Chimmalgi","doi":"10.1002/9781119166528.ch7","DOIUrl":"https://doi.org/10.1002/9781119166528.ch7","url":null,"abstract":": TSSA and CTSI shows delay or lag wrt each other 1,3,5 . Solar cycle data (21,22,23) is used in the analysis and possible correlation between H alpha flare index and delay is worked out .It is found that these two parameters are anti correlated with a correlation factor of 0.8 9427 . The 27day solar activity shows heighest correlation factor. A new parameter called delay index number ( D I ) is defined.This paramter shows two sharp peaks wrt delay event number ,during the span of solar cycle 21,22,23. The peaks fall in soalr quite period 1986 and 1996. Thus D I acts as an indicator of quite phase (ie solar minima )of sun.The possible cause for sharp shoot up is under investigation.","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"145 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121509652","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Basis of Claims 索赔依据
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch2
{"title":"Basis of Claims","authors":"","doi":"10.1002/9781119166528.ch2","DOIUrl":"https://doi.org/10.1002/9781119166528.ch2","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129260959","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Prolongation Costs 工程延误引致的额外费用
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch12
{"title":"Prolongation Costs","authors":"","doi":"10.1002/9781119166528.ch12","DOIUrl":"https://doi.org/10.1002/9781119166528.ch12","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124103293","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Disruption 中断
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch9
{"title":"Disruption","authors":"","doi":"10.1002/9781119166528.ch9","DOIUrl":"https://doi.org/10.1002/9781119166528.ch9","url":null,"abstract":"A distinction should be made between prolongation claims (involving costs and losses incurred as a result of delays to the activity in question or the works as a whole which have led to critical delay to the contract completion date) and disruption claims (which involve those additional costs and losses incurred during extended or disrupted periods of activities usually without any effect on the completion date for the works. Features of disruption","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116182478","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Index 指数
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.index
{"title":"Index","authors":"","doi":"10.1002/9781119166528.index","DOIUrl":"https://doi.org/10.1002/9781119166528.index","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126814647","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Available Documents 可用的文件
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch4
{"title":"Available Documents","authors":"","doi":"10.1002/9781119166528.ch4","DOIUrl":"https://doi.org/10.1002/9781119166528.ch4","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"592 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123180243","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Disruption Claim Examples 干扰索赔例子
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch11
{"title":"Disruption Claim Examples","authors":"","doi":"10.1002/9781119166528.ch11","DOIUrl":"https://doi.org/10.1002/9781119166528.ch11","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"8 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128374923","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Thickening Claims 增厚要求
Preparing Construction Claims Pub Date : 2020-01-17 DOI: 10.1002/9781119166528.ch13
{"title":"Thickening Claims","authors":"","doi":"10.1002/9781119166528.ch13","DOIUrl":"https://doi.org/10.1002/9781119166528.ch13","url":null,"abstract":"","PeriodicalId":285625,"journal":{"name":"Preparing Construction Claims","volume":"26 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115809590","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信