High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)最新文献

筛选
英文 中文
HS2 interchange station – innovative roof design: an exemplary project on integrated design team collaboration and the use of advanced digital workflows HS2换乘站-创新屋顶设计:集成设计团队协作和使用先进数字工作流程的示范项目
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.023
Kim Quazi, L. Davis, James Talbot, José Carlos González, F. Ruiz
{"title":"HS2 interchange station – innovative roof design: an exemplary project on integrated design team collaboration and the use of advanced digital workflows","authors":"Kim Quazi, L. Davis, James Talbot, José Carlos González, F. Ruiz","doi":"10.1680/hs2.65765.023","DOIUrl":"https://doi.org/10.1680/hs2.65765.023","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121038443","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Shallow TBM launch of the Northolt Tunnel West TBMs at West Ruislip norolt隧道西部隧道掘进机在西Ruislip的浅层掘进机启动
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.337
Xavier Torelló, H. Castellvi, George Doulkas, T. Rogala
{"title":"Shallow TBM launch of the Northolt Tunnel West TBMs at West Ruislip","authors":"Xavier Torelló, H. Castellvi, George Doulkas, T. Rogala","doi":"10.1680/hs2.65765.337","DOIUrl":"https://doi.org/10.1680/hs2.65765.337","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"38 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126308913","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Overcoming the challenges associated with the design of noise barriers for high-speed railways 克服高速铁路隔音屏障设计的挑战
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.487
A. Cunningham, Rory Bradshaw, Geronimo Düsterloh, G. Berhane, Vinicius Gaio de Siqueira, Laura Newton, Faraz Ul-Haq
{"title":"Overcoming the challenges associated with the design of noise barriers for high-speed railways","authors":"A. Cunningham, Rory Bradshaw, Geronimo Düsterloh, G. Berhane, Vinicius Gaio de Siqueira, Laura Newton, Faraz Ul-Haq","doi":"10.1680/hs2.65765.487","DOIUrl":"https://doi.org/10.1680/hs2.65765.487","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"347 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126677372","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Design optimisation and challenges with the deepest shaft on HS2 HS2最深轴的设计优化与挑战
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.159
R. Sivakumar, S. Sivakanthan, A. Maheetharan, I. Thomas, P. Gilbert
{"title":"Design optimisation and challenges with the deepest shaft on HS2","authors":"R. Sivakumar, S. Sivakanthan, A. Maheetharan, I. Thomas, P. Gilbert","doi":"10.1680/hs2.65765.159","DOIUrl":"https://doi.org/10.1680/hs2.65765.159","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134443291","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Temporary access road optioneering and cost analysis 临时出入口道路选择及成本分析
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.421
Sacha El-Labany, G. Massey
{"title":"Temporary access road optioneering and cost analysis","authors":"Sacha El-Labany, G. Massey","doi":"10.1680/hs2.65765.421","DOIUrl":"https://doi.org/10.1680/hs2.65765.421","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122408675","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Birmingham Curzon Street Station: a 21st century station roof 伯明翰Curzon街车站:21世纪的车站屋顶
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.041
Malcolm Davidson, Elaine Roberts, Andrew Woodhams
{"title":"Birmingham Curzon Street Station: a 21st century station roof","authors":"Malcolm Davidson, Elaine Roberts, Andrew Woodhams","doi":"10.1680/hs2.65765.041","DOIUrl":"https://doi.org/10.1680/hs2.65765.041","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130328751","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
HS2 track alignment change process through collaboration HS2通过协作跟踪路线变更过程
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.449
J. Olazabal, Carmen Redondo, Michael Boyd
{"title":"HS2 track alignment change process through collaboration","authors":"J. Olazabal, Carmen Redondo, Michael Boyd","doi":"10.1680/hs2.65765.449","DOIUrl":"https://doi.org/10.1680/hs2.65765.449","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123832914","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Mathematical modelling of cross passage spacing in tunnels 隧道横贯通道间距的数学建模
High Speed Two (HS2): Infrastructure Design and Construction (Volume 1) Pub Date : 2021-01-01 DOI: 10.1680/hs2.65765.145
R. McDonald, A. Johnstone
{"title":"Mathematical modelling of cross passage spacing in tunnels","authors":"R. McDonald, A. Johnstone","doi":"10.1680/hs2.65765.145","DOIUrl":"https://doi.org/10.1680/hs2.65765.145","url":null,"abstract":"","PeriodicalId":266260,"journal":{"name":"High Speed Two (HS2): Infrastructure Design and Construction (Volume 1)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115246309","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信