{"title":"How to Plan a TPM Project","authors":"Marco Antonio Boschetti","doi":"10.1002/9781119562757.ch7","DOIUrl":"https://doi.org/10.1002/9781119562757.ch7","url":null,"abstract":"","PeriodicalId":257522,"journal":{"name":"Effective Project Management","volume":"173 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2012-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114847218","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"How to Scope a TPM Project","authors":"Marco Antonio Boschetti","doi":"10.1002/9781119562757.ch6","DOIUrl":"https://doi.org/10.1002/9781119562757.ch6","url":null,"abstract":"","PeriodicalId":257522,"journal":{"name":"Effective Project Management","volume":"41 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2012-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114671569","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}