Essays in Production, Project Planning and Scheduling最新文献

筛选
英文 中文
Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness Costs 具有加权早/迟成本的动态资源约束多项目调度问题
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_10
G. Ulusoy, B. Pamay, Kerem Bulbul
{"title":"Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness Costs","authors":"G. Ulusoy, B. Pamay, Kerem Bulbul","doi":"10.1007/978-1-4614-9056-2_10","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_10","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123985018","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 7
A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job Shop 工人约束下作业车间分配绩效的概率表征
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_13
Benjamin J. Lobo, T. J. Thoney, R. King, James R. Wilson
{"title":"A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job Shop","authors":"Benjamin J. Lobo, T. J. Thoney, R. King, James R. Wilson","doi":"10.1007/978-1-4614-9056-2_13","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_13","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125415725","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Ubiquitous Operations Research in Production Systems 生产系统中的泛在运筹学
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_2
L. McGinnis
{"title":"Ubiquitous Operations Research in Production Systems","authors":"L. McGinnis","doi":"10.1007/978-1-4614-9056-2_2","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_2","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"82 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130322850","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Mine Planning Above and Below Ground: Generating a Set of Pareto-Optimal Schedules Considering Risk and Return 矿山规划:考虑风险和收益的帕累托最优方案
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_14
C. Yano, Carson McFadden
{"title":"Mine Planning Above and Below Ground: Generating a Set of Pareto-Optimal Schedules Considering Risk and Return","authors":"C. Yano, Carson McFadden","doi":"10.1007/978-1-4614-9056-2_14","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_14","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131216678","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Vulnerability Discussion in Multimodal Freight Systems 多式联运货运系统脆弱性探讨
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_7
S. G. Aydin, P. Pulat
{"title":"Vulnerability Discussion in Multimodal Freight Systems","authors":"S. G. Aydin, P. Pulat","doi":"10.1007/978-1-4614-9056-2_7","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_7","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"61 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131228778","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Integrated Production Planning and Pricing Decisions in Congestion-Prone Capacitated Production Systems 易拥堵产能生产系统中的综合生产计划与定价决策
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_3
A. Upasani, R. Uzsoy
{"title":"Integrated Production Planning and Pricing Decisions in Congestion-Prone Capacitated Production Systems","authors":"A. Upasani, R. Uzsoy","doi":"10.1007/978-1-4614-9056-2_3","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_3","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"247 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122839523","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Multiple-Lot Lot Streaming in a Two-stage Assembly System 两阶段装配系统中的多批次批量流
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_15
Liming Yao, S. Sarin
{"title":"Multiple-Lot Lot Streaming in a Two-stage Assembly System","authors":"Liming Yao, S. Sarin","doi":"10.1007/978-1-4614-9056-2_15","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_15","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129922711","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Multimode Resource-Constrained Project Scheduling Problem Including Multiskill Labor (MRCPSP-MS) Model and a Solution Method 包含多技能劳动力的多模式资源约束项目调度问题(MRCPSP-MS)模型及其求解方法
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_11
M. Santos, Anabela Tereso
{"title":"Multimode Resource-Constrained Project Scheduling Problem Including Multiskill Labor (MRCPSP-MS) Model and a Solution Method","authors":"M. Santos, Anabela Tereso","doi":"10.1007/978-1-4614-9056-2_11","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_11","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"84 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126275163","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Introduction: For Daddy 导言:给爸爸的
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_1
Wedad Elmaghraby, Karima N. Radwan
{"title":"Introduction: For Daddy","authors":"Wedad Elmaghraby, Karima N. Radwan","doi":"10.1007/978-1-4614-9056-2_1","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_1","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127485637","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Scheduling and Financial Planning in Stochastic Activity Networks 随机活动网络中的调度与财务计划
Essays in Production, Project Planning and Scheduling Pub Date : 1900-01-01 DOI: 10.1007/978-1-4614-9056-2_8
B. Dodin, A. A. Elimam
{"title":"Scheduling and Financial Planning in Stochastic Activity Networks","authors":"B. Dodin, A. A. Elimam","doi":"10.1007/978-1-4614-9056-2_8","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_8","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128274245","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信