{"title":"Dynamic Resource Constrained Multi-Project Scheduling Problem with Weighted Earliness/Tardiness Costs","authors":"G. Ulusoy, B. Pamay, Kerem Bulbul","doi":"10.1007/978-1-4614-9056-2_10","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_10","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123985018","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Benjamin J. Lobo, T. J. Thoney, R. King, James R. Wilson
{"title":"A Probabilistic Characterization of Allocation Performance in a Worker-Constrained Job Shop","authors":"Benjamin J. Lobo, T. J. Thoney, R. King, James R. Wilson","doi":"10.1007/978-1-4614-9056-2_13","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_13","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125415725","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Ubiquitous Operations Research in Production Systems","authors":"L. McGinnis","doi":"10.1007/978-1-4614-9056-2_2","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_2","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"82 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130322850","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Mine Planning Above and Below Ground: Generating a Set of Pareto-Optimal Schedules Considering Risk and Return","authors":"C. Yano, Carson McFadden","doi":"10.1007/978-1-4614-9056-2_14","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_14","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131216678","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Vulnerability Discussion in Multimodal Freight Systems","authors":"S. G. Aydin, P. Pulat","doi":"10.1007/978-1-4614-9056-2_7","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_7","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"61 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131228778","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Integrated Production Planning and Pricing Decisions in Congestion-Prone Capacitated Production Systems","authors":"A. Upasani, R. Uzsoy","doi":"10.1007/978-1-4614-9056-2_3","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_3","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"247 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122839523","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Multiple-Lot Lot Streaming in a Two-stage Assembly System","authors":"Liming Yao, S. Sarin","doi":"10.1007/978-1-4614-9056-2_15","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_15","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129922711","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Multimode Resource-Constrained Project Scheduling Problem Including Multiskill Labor (MRCPSP-MS) Model and a Solution Method","authors":"M. Santos, Anabela Tereso","doi":"10.1007/978-1-4614-9056-2_11","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_11","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"84 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126275163","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Introduction: For Daddy","authors":"Wedad Elmaghraby, Karima N. Radwan","doi":"10.1007/978-1-4614-9056-2_1","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_1","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127485637","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Scheduling and Financial Planning in Stochastic Activity Networks","authors":"B. Dodin, A. A. Elimam","doi":"10.1007/978-1-4614-9056-2_8","DOIUrl":"https://doi.org/10.1007/978-1-4614-9056-2_8","url":null,"abstract":"","PeriodicalId":252229,"journal":{"name":"Essays in Production, Project Planning and Scheduling","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128274245","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}