{"title":"Project Management Concepts and Principles","authors":"","doi":"10.1002/9781118795125.ch2","DOIUrl":"https://doi.org/10.1002/9781118795125.ch2","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123996067","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Commissioning and Startup","authors":"","doi":"10.1002/9781118795125.ch9","DOIUrl":"https://doi.org/10.1002/9781118795125.ch9","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125231024","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Example of Site-Specific Decommissioning Checklist / Questionnaire","authors":"","doi":"10.1002/9781118795125.app5","DOIUrl":"https://doi.org/10.1002/9781118795125.app5","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124200249","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Project Process Safety Plan","authors":"","doi":"10.1002/9781118795125.app2","DOIUrl":"https://doi.org/10.1002/9781118795125.app2","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126906644","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Front End Loading 3","authors":"","doi":"10.1002/9781118795125.ch5","DOIUrl":"https://doi.org/10.1002/9781118795125.ch5","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122610426","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Detailed Design Stage","authors":"","doi":"10.1002/9781118795125.ch6","DOIUrl":"https://doi.org/10.1002/9781118795125.ch6","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"20 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125267165","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Typical Hazard & Risk Register","authors":"","doi":"10.1002/9781118795125.app3","DOIUrl":"https://doi.org/10.1002/9781118795125.app3","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"574 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132373441","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Typical Process Safety Studies Over Project Life Cycle","authors":"","doi":"10.1002/9781118795125.app1","DOIUrl":"https://doi.org/10.1002/9781118795125.app1","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"68 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116294750","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Stage Gate Review Protocol For Process Safety","authors":"","doi":"10.1002/9781118795125.app7","DOIUrl":"https://doi.org/10.1002/9781118795125.app7","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116647688","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Front End Loading 2","authors":"","doi":"10.1002/9781118795125.ch4","DOIUrl":"https://doi.org/10.1002/9781118795125.ch4","url":null,"abstract":"","PeriodicalId":193894,"journal":{"name":"Guidelines for Integrating Process Safety into Engineering Projects","volume":"113 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117289806","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}