{"title":"Evaluation Of Drill Bit Selection On Basement Layer Exploration Drilling In AFM Block","authors":"Afidzatul Maulana, A. Buntoro, D. Kristanto","doi":"10.31315/jpgt.v4i1.7176","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.7176","url":null,"abstract":"In one of the exploration drilling of the AF-01 well, there was a drilling problem on the 8 in hole when it penetrated the basement layer. ROP at the time of drilling the basement layer is far below the estimated ROP.By setting MSE as, ROP is increased so that cost savings are obtained from reducing rig time. A qualitative analysis of drillbit selection was carried out based on the type and design of the drillbit as well as the characteristics of the basement rock to be penetrated.In addition to the qualitative and quantitative assessment was carried out through the calculation of the PDC Design Index, MSE, DSE and CPF on each drill bit.ROP of Hybrid PDC-1 increased 500% when compared to PDC-1. The MSE and DSE produced by the Hybrid PDC-1 are 750% smaller than the PDC-1. Using the Hybrid PDC-1, drilling costs can be reduced up to USD 2,105,481.The low ROP at the time of drilling the basement layer in well AF-01 was due to the incompatibility of the PDC-1 bit used for the type of rock being penetrated. Hybrid PDC-1 is the most optimum bit to penetrate the basement layer in the AFM Block.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128694444","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"ACIDIZING EVALUATION OF CARBONATE ROCK IN BDA-F WELL, JATIBARANG FIELD","authors":"Andri Widyanata","doi":"10.31315/jpgt.v4i1.7335","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.7335","url":null,"abstract":"Acidizing is a dissolving activity, whether it is dissolving rock formations or other materials (natural or foreign) in reservoir of the rock. To maintain production in the Jatibarang field, especially in Bangodua (BDA) structure, there are 1 well that have experienced a short decline in production since drilling. The reservoir properties of that well is not good and there is impurity material (damage). Thus, requiring stimulation in the form of matrix acidizing. Evaluation of the matrix acid work in this well, is required for the same activities in other wells.To restore productivity this well, data were collected starting from production data, reservoir data, and well composition data. Then, candidate analysis and matrix acidizing job design are carried out. The design stage will be brought to the execution of matrix acidizing in the field. Then an evaluation was carried out after the presence of matrix acidizing in this wellThis well carried out matrix acidizing activities, produced oil production gains. BDA-F well produced with artificial lift of Electrical submersible pump – ESP in C1 layer (1128 – 1130.5 mMD), experienced an increase in test production from 749 BLPD to 1865 BLPD with a decrease in skin factor from +32 to -1.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130200323","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Technical and Economical Study on Increasing Oil Production in Old Wells (Traditional) by Performing Well Maintenance in the CP Field","authors":"Ardi Alfarizi, Nur Suhascaryo, B. Swadesi","doi":"10.31315/jpgt.v4i1.7422","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.7422","url":null,"abstract":"The CP field is an brown field with a production potential of 2,185 BOPD. However, the realization of CP Field production in the first semester was 1,931 BOPD (88.4% of the production target). From Low & Off data for the period from January to September 2020, it was found that the biggest problem contributing to LPO (Lost Production Opportunity) was caused by artificial lift wells and reduced production from old (traditional) wells.Several solutions can be done in order to solve the problem. Among them is by carrying out well maintenance, both those experiencing a decline in production or wells that have the potential to be activated. By implementing this, it is hoped that it will be able to maintain stability and even increase oil production and distribution through the old (traditional) well. The screening of reactivation well candidates is carried out with the technical evaluation stage and the economic evaluation stage. The engineering evaluation was carried out by analyzing the history of well production and analyzing the distribution map of the wells in the CP Field. Based on this data, 2 (two) candidate wells were obtained, namely LDK-38 and LDK-108. Then proceed with carrying out technical calculations of Rig capacity, namely by calculating Lifting Loads, Rotating Loads and Circulating Loads and continuing with the preparation of reactivation programs and economic calculations.Based on these calculations, it was found that the need for the Rig Capacity to carry out the reactivation work of the 2 (two) wells was 21 (twenty one) HP, so the Spindle Rig was chosen to do the work because the cost was more economical, which was Rp. 45,000,000, - for the work. per-well reactivation. Therefore, the total cost required for the reactivation of 2 (two) wells is Rp. 90,000,000,-. The reactivation program for the LDK-38 and LDK-108 wells resulted in additional production in the CP Field of + 21.73 BOPD or 5,932 bbl (January - September 2021). In addition, gross revenue of USD 572,000 was obtained (crude oil price of 49 USD/bbl).","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"200 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128412707","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Mineralogy and Rock Response Analysis Approach to Mitigate Wellbore Stability issue in “B” Cluster of East Java Field","authors":"Andi Andi Andi","doi":"10.31315/jpgt.v4i1.7336","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.7336","url":null,"abstract":"The instability of shales in drilled formations leads to serious operational problems with major economic consequences for petroleum exploration and production. It is generally has agreed that the nature of the clay minerals in shale formations is a primary causative factor leading to their instability, although the exact mechanism involved is more debatable. Currently, the principal cause of shale instability is considered to be volume expansion following the osmotic swelling of sodium smectite. However, illitic and Kaolinite shales may also be unstable, so that interlayer expansion cannot therefore be consider as a universal causative mechanism of shale instability. This review considers alternative scenarios of shale instability where the major clay minerals Kaolinite suspected to be a key success to mitigate the wellbore stability. It is found from the literature that the inhibited by the use of more concentrated Potassium-based fluids which is effectively shrink the thickness of the clay mineral surfaces in the pore walls but may differently responded by Kaolinite dominant clay. The use of soluble polymers would also encapsulate these clay mineral surfaces and so inhibit their hydration. In this scenario, the locus of action with respect to shale instability and its inhibition is moved from the interlamellar space of the smectitic clays to the charged external surfaces of the various clay minerals bounding the walls of the shale pores. Keywords: shale instability, smectitic shale, illitic shale, Kaolinitic shale.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"64 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131831002","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Evaluation of Propellant/Stimgun Stimulation Works Using Geomechanical Analysis Based on Well Logging Data in an Effort to Increase Production at the EYP-211 YNK Structure Well in the Jambi Field","authors":"Eko Yugi Priyatno","doi":"10.31315/jpgt.v4i1.7771","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.7771","url":null,"abstract":"The oil production flow rate of the EYP-211 well is relatively small, only 12.75 BOPD. The small fluid flow rate is caused by the small formation permeability which is only 2.1 mD. Currently the EYP-211 well has been stimulated with Propellant/Stimgun, but not all of the formation layers can be carried out by Stimgun work so that it is necessary to evaluate it with Geomechanical analysis to determine the success of the stimulation work by calculating the Poisson's ratio and Young's modulus which will be analyzed based on well-logging data.Based on the results of the brittleness index and fracability index analysis, the EYP-211 well is recommended to be stimulated at a depth of 632.92 m to 635.46 m. Stimgun work on the EYP-211 well resulted in a fracture with an average fracture width of 0.02035 in, a fracture height of 9.81 ft and a fracture length of 481.09 ft. The formation permeability increased from 2.1 mD to 14.07 mD due to fractures produced by the stimulus. The flow rate of oil production in the EYP-211 well increased from 12.75 bopd to 140 bopd due to the increased permeability generated by the fracture.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"60 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131717216","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Sebastianus Riskadarto, Harry Budiharjo Sulistyarso, Nur Suhascaryo
{"title":"Flow Assurance Improvement by Injecting Pour Point Depressant Chemical through Permanent Coiled Tubing Gas Lift to Heavy Oil at MM-1 Well at MPA Field","authors":"Sebastianus Riskadarto, Harry Budiharjo Sulistyarso, Nur Suhascaryo","doi":"10.31315/jpgt.v4i1.8717","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.8717","url":null,"abstract":"The majority artificial lift used in MPA Field use PCTGL (Permanent coil tubing gas lift). PCTGL is installed on several monobore well or dual monobore well. Some wells in the MPA Field have waxy HPPO oil character with pour point between 85-100oF with API between 30-35. The well \"MM-1\" has a HPPO character with pour point 95oF. The character high Pour point oil of the well will be problem to be solved. The MM-1 well is produced with PCTGL. From the simulation, a PCTGL design was obtained at a depth of 2250 ft. With the character of HPPO oil, pour point depressant injection optimization is also carried out along with the injection of gas lift so that the chemical can work from the downhole. The results of the bottle test of pour point depressant use concentration of 1000 ppm to reach the target. The results of the field test showed that the concentration of Pour Point Depressant of 1026 ppm was able to change the pour point up to 65oF. The results of optimization production showed that the production of MM-1 wells was able to increase with production of 290 bopd.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124990794","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Heat Loss and Cost Reduction of Insulation Materials on Geothermal Pipes","authors":"Ristiyan Ragil Putradianto, A. H. Lukmana","doi":"10.31315/jpgt.v4i1.9706","DOIUrl":"https://doi.org/10.31315/jpgt.v4i1.9706","url":null,"abstract":"Power plant in X field has 6 production wells with steam dominated reservoir type. Fluid flowing in pipe from the well to the plant experienced heat loss that occured due to difference in the temperature of the flowing steam and the outside that caused heat transfer from inside the pipe to the outside. Minimizing heat transfer can be done by using an insulator is installed on the outside of the pipe, in this case, Foamglas W+F Insulation The method to assess the heat loss is by calculating material properties as well as fluid properties to deterimine heat transfer rate for one well as representation of all wells. From the calculation, it can be concurred that the use of Foamglas W+F Insulation material provides reduction in heat loss of 113,61 kWh for one well with significant reduction in costs of 1.035 billion IDR per well per year. By comparing the heat loss reduction value which is almost the same, the option to replace the materials to Foamglas W+F insulation material is cheaper than adding the existing insulation thickness.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"9 4","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"120817470","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Evaluation of Water Channeling Problems and Planning for Its Improvement Using the Remedial Cementing Method and Its Economics in Well AB-30 Field AB PT. Pertamina EP","authors":"D. Kurniawan, Krt Nur Suhascaryo, B. Swadesi","doi":"10.31315/jpgt.v3i1.6881","DOIUrl":"https://doi.org/10.31315/jpgt.v3i1.6881","url":null,"abstract":"The AB-30 well is an oil producing well located in the AB Field. Production performance data shows that AB-30 shows excessive water production behavior or is a high water cut production well. In addition, the interpretation of CBL data shows an amplitude value of <10 mV in the productive interval. This condition is an indicator that the primary cementing activity in this well is not good. Therefore, a comprehensive and integrated analytical method is needed to identify the problem of excess water production and to design and plan water shut-off activities through squeeze cementing as an effort to mitigate the problem of high water cut to economic analysis.The research begins by identifying the problem of excess water production, whether caused by water channeling, water coning, changes in water oil contact, or by the physical properties of the reservoir rock. Identification is done through production analysis and water diagnostic plots. The next stage is to evaluate the interpretation of CBL Logging results to strengthen the results of production data analysis. After confirming that the problem of excess water production is caused by poor cement bonding cement, the next step is to calculate the cement work program in order to repair the bad cement bonding. Subsequently, the productive zone interval re-perforation was carried out according to the results of the OH Loh Co Log evaluation. No less important is to conduct an economic analysis as a basis for whether or not this work is feasible.The result of this research is that the water shut-off activity went well and was able to reduce the level of excess water production in the AB-30 well and optimize oil production so as to provide a good economic indicator of oil recovery. Remedial cementing work for bonding repair was carried out at well AB-30. The first work is to close the existing layer, followed by Logging evaluation (CBL-USIT). The evaluation results showed that the cement bonding was good with the CBL amplitude parameter < 10 mV. After that, the productive zone reperforation was carried out. The economy by considering the values of economic indicators such as Pay Out Time and Rate Of Investment showed positive results so that the priority and strategy of well intervention could be continued. The results obtained before the well intervention were 148 BOPD oil production, 97% water cut after well intervention was 880 BOPD average oil production, 0% water cut for 1.5 months ","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132790234","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Hafis Syafrudin Anshari, D. Kristanto, D. Ratnaningsih, Dimas Suryo Wicaksono
{"title":"Selection & Optimization of Artificial Lift Using Delphi, TOPSIS, and SAW Methods for Natural Flow Oil Wells at HAS Field","authors":"Hafis Syafrudin Anshari, D. Kristanto, D. Ratnaningsih, Dimas Suryo Wicaksono","doi":"10.31315/jpgt.v3i1.6852","DOIUrl":"https://doi.org/10.31315/jpgt.v3i1.6852","url":null,"abstract":"ABSTRACTThe HAS field started producing oil and gas in 2004 until 2018, production wells in HAS experienced a decrease in oil production from 45,000 bopd to 6,190 bopd and an increase in water production from 0 bwpd to 20,463 bwpd. The decline in production occurs due to increased water production. The decrease in production was caused by a decrease in reservoir pressure, causing a larger water cut. Therefore, it is necessary to optimize production wells by considering the things mentioned above.The artificial lift selection method used is the Delphi method which has 21 screening parameters combined with the Topsis method; helps facilitate Decision-Making from various complex alternatives, by conducting comprehensive comparisons between each alternative and using the Simple Additive Weighting (SAW) method; known as the weighted addition method. The selection of the Artificial Lift in the HAS Field was carried out based on the reservoir parameters, production, well construction, and the economic factors of the artificial lift used. The artificial lift method that will be used in the HAS Field is the Electrical Submersible Pump (ESP). Based on the results of the selection of an artificial lift with a combined method of Delphi, Topsis, and SAW,Efforts to increase production with an electric submersible pump (ESP) are carried out by optimizing the number of stages and setting the frequency to a value of 45 Hz. Further optimization is carried out by gradually changing the pump frequency up to a maximum of 60 Hz, without changing the pump type. From the results of the economic analysis in the HAS Field, it was found that the most economical scenario was to use an ESP pump with the highest NPV@10 % value than the other scenarios, namely 434.85 MUS$.Keywords :Artificial Lift Conversion; Delphi; Topsis; SAW; Optimization","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"68 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116752304","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Uncertainty Assessment for Field Development Study Using Monte Carlo Simulation on Salap Field Multilayer Gas Reservoir","authors":"Fahrezi Oktaviandi, Bony Swadesi, D. Ratnaningsih","doi":"10.31315/jpgt.v3i1.6996","DOIUrl":"https://doi.org/10.31315/jpgt.v3i1.6996","url":null,"abstract":"Uncertainty assessment for Field Development Study is often only carried out in a Deterministic Method by only creating scenario sensitivity based on theoretical assumptions without add subsurface risk factors. In the uncertainty assessment model, when a model is made with a variable that only has one value for each sensitivity is called the Deterministic Method. Meanwhile, when a model is made with a variable that has value in the form of a probability distribution, the method is called the Probabilistic Method. In the Probabilistic Method, the probability distribution is influenced by the risk factors, while in the Deterministic Method, these factors have no effect because the input value is only based on theoretical assumption. Uncertainty assessment for the Salap Field Development Study was carried out using the Probabilistic Method Monte Carlo Simulation. The results of the study provide the number of proven reservoirs, volume in place, volume of resources, number of development wells, plateau production period and field life that already accommodates subsurface risk factors and uncertainty in geological-reservoir data. The paper also compares the assessment result between the Probabilistic Method with the Deterministic Method to see how risk factors influenece the study results.","PeriodicalId":186783,"journal":{"name":"Journal of Petroleum and Geothermal Technology","volume":"133 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132612726","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}