Journal of Entrepreneurship & Project Management最新文献

筛选
英文 中文
Effect of Project Planning on the Success of Construction Projects in Nyarugenge District: A Case of Fair Construction Ltd 项目规划对 Nyarugenge 地区建筑项目成功的影响:公平建筑有限公司案例
Journal of Entrepreneurship & Project Management Pub Date : 2024-01-31 DOI: 10.53819/81018102t2323
{"title":"Effect of Project Planning on the Success of Construction Projects in Nyarugenge District: A Case of Fair Construction Ltd","authors":"","doi":"10.53819/81018102t2323","DOIUrl":"https://doi.org/10.53819/81018102t2323","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"141 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140479139","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Project Risk Management on Successful Delivery of Vision City Project, Phase One 项目风险管理对成功实施愿景城市项目第一阶段的影响
Journal of Entrepreneurship & Project Management Pub Date : 2024-01-29 DOI: 10.53819/81018102t2319
{"title":"Effect of Project Risk Management on Successful Delivery of Vision City Project, Phase One","authors":"","doi":"10.53819/81018102t2319","DOIUrl":"https://doi.org/10.53819/81018102t2319","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"37 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140488609","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The Role of Effective Planning on Performance of Kigali Bulk Water Supply Project in Kanzenze Cell in Bugesera District, Rwanda 有效规划对卢旺达 Bugesera 区 Kanzenze 小区基加利大容量供水项目绩效的作用
Journal of Entrepreneurship & Project Management Pub Date : 2024-01-26 DOI: 10.53819/81018102t2317
{"title":"The Role of Effective Planning on Performance of Kigali Bulk Water Supply Project in Kanzenze Cell in Bugesera District, Rwanda","authors":"","doi":"10.53819/81018102t2317","DOIUrl":"https://doi.org/10.53819/81018102t2317","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"81 12","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139593604","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Influence of Planning Tools on the Performance of a Disaster Management Project in Rwanda. A Case of Strengthening National and Local Disaster Risk Management Capacity, Resilience and Enhancing Preparedness and Early Warning System Project in Musanze District 规划工具对卢旺达灾害管理项目绩效的影响。穆桑泽区加强国家和地方灾害风险管理能力、抗灾能力、提高备灾和预警系统项目案例
Journal of Entrepreneurship & Project Management Pub Date : 2024-01-18 DOI: 10.53819/81018102t2309
{"title":"Influence of Planning Tools on the Performance of a Disaster Management Project in Rwanda. A Case of Strengthening National and Local Disaster Risk Management Capacity, Resilience and Enhancing Preparedness and Early Warning System Project in Musanze District","authors":"","doi":"10.53819/81018102t2309","DOIUrl":"https://doi.org/10.53819/81018102t2309","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"79 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139526502","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Role of Project Communication Management on the Performance of Airline Company in Rwanda. A Case of Rwandair Ltd. 项目沟通管理对卢旺达航空公司绩效的作用。卢旺达航空有限公司案例
Journal of Entrepreneurship & Project Management Pub Date : 2024-01-17 DOI: 10.53819/81018102t2307
{"title":"Role of Project Communication Management on the Performance of Airline Company in Rwanda. A Case of Rwandair Ltd.","authors":"","doi":"10.53819/81018102t2307","DOIUrl":"https://doi.org/10.53819/81018102t2307","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"60 4","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"140505398","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Influence of Project Planning Practices on Project Performance. A Case of Rwanda Dairy Development Project in Burera District, Rwanda 项目规划实践对项目绩效的影响。卢旺达 Burera 地区的卢旺达奶业发展项目案例
Journal of Entrepreneurship & Project Management Pub Date : 2024-01-16 DOI: 10.53819/81018102t2305
{"title":"Influence of Project Planning Practices on Project Performance. A Case of Rwanda Dairy Development Project in Burera District, Rwanda","authors":"","doi":"10.53819/81018102t2305","DOIUrl":"https://doi.org/10.53819/81018102t2305","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"37 15","pages":""},"PeriodicalIF":0.0,"publicationDate":"2024-01-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139528331","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Project Planning Practices on Performance of Improve Capacity for Supply of Quality in Reproductive Health Services Project in Nyamasheke District, Rwanda 项目规划做法对卢旺达尼亚马舍克县提高生殖健康服务质量供应能力项目绩效的影响
Journal of Entrepreneurship & Project Management Pub Date : 2023-12-23 DOI: 10.53819/81018102t2294
{"title":"Effect of Project Planning Practices on Performance of Improve Capacity for Supply of Quality in Reproductive Health Services Project in Nyamasheke District, Rwanda","authors":"","doi":"10.53819/81018102t2294","DOIUrl":"https://doi.org/10.53819/81018102t2294","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"11 8","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139161614","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Project Planning Practices on the Performance of Tourism Projects: A Case of Sabyinyo Community Livelihood Association, Kinigi Sector, Musanze District 项目规划实践对旅游项目绩效的影响:穆桑泽县 Kinigi 区 Sabyinyo 社区生计协会的案例
Journal of Entrepreneurship & Project Management Pub Date : 2023-12-22 DOI: 10.53819/81018102t2293
{"title":"Effect of Project Planning Practices on the Performance of Tourism Projects: A Case of Sabyinyo Community Livelihood Association, Kinigi Sector, Musanze District","authors":"","doi":"10.53819/81018102t2293","DOIUrl":"https://doi.org/10.53819/81018102t2293","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"9 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138947783","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Stakeholders’ Management Practices on the Performance of Social Protection Projects: A Case of Girinka Program in Musanze District, Rwanda 利益相关者的管理实践对社会保护项目绩效的影响:卢旺达穆桑泽区 Girinka 计划案例
Journal of Entrepreneurship & Project Management Pub Date : 2023-12-08 DOI: 10.53819/81018102t2289
{"title":"Effect of Stakeholders’ Management Practices on the Performance of Social Protection Projects: A Case of Girinka Program in Musanze District, Rwanda","authors":"","doi":"10.53819/81018102t2289","DOIUrl":"https://doi.org/10.53819/81018102t2289","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":"7 6","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138586036","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effect of Project Management Process on Performance of Energy Infrastructure Projects in Rwanda 项目管理流程对卢旺达能源基础设施项目绩效的影响
Journal of Entrepreneurship & Project Management Pub Date : 2023-12-01 DOI: 10.53819/81018102t2283
{"title":"Effect of Project Management Process on Performance of Energy Infrastructure Projects in Rwanda","authors":"","doi":"10.53819/81018102t2283","DOIUrl":"https://doi.org/10.53819/81018102t2283","url":null,"abstract":"","PeriodicalId":176307,"journal":{"name":"Journal of Entrepreneurship & Project Management","volume":" 3","pages":""},"PeriodicalIF":0.0,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138612729","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信