{"title":"Scraper Face Conveyors Dynamic Load Control","authors":"Евгений Константинович Ещин","doi":"10.31897/pmi.2019.5.570","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.570","url":null,"abstract":"The task of controlling the dynamic loading of scraper face conveyors (SC) is considered and the unsatisfactory state of loading of mechanical and electrical components of the SC is recorded. The possibility of the appearance of a self-oscillatory nature of the entire system load due to the peculiarities of the movement of the traction chain along the lattice frame of the SC is indicated. The property of the system is noted – the cyclic nature of the loading of the circuit during movement, which causes energy exchange processes between the mechanical and electromotive components of the conveyor (when using the head and tail electric drives) through the common cable network of the power supply system of the SC. A high level of dynamic loading of the electromechanical system causes the problem of eliminating the self-oscillating operating mode of the SC that generates it which is proposed to be solved by changing the angular rotation speeds of the SC drive sprockets. Angular speeds can be changed by applying frequency control of asynchronous electric motors. The efficiency of setting the frequency of electric motor stator currents of the head and tail drives of the conveyor is established in proportion to the frequency of rotors rotation to eliminate self- oscillating modes of operation in the main operating mode. The possibility of reducing the starting shock values of the electromagnetic moments of electric motors is considered. The results of the calculation of the start-up and liquidation of the self-oscillating operating mode are presented on the example of the scraper face conveyor Anzhera-34. The results of calculations of the start-up modes and the main operational transportation of coal in an uncontrolled mode of operation and after the introduction of control are compared, based on which it is concluded that it is advisable to use active control of the dynamic loading of SC.","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"1 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86848753","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
A. Pavlovich, V. Korshunov, A. Bazhukov, N. Melnikov
{"title":"Estimation of Rock Mass Strength in Open-Pit Mining","authors":"A. Pavlovich, V. Korshunov, A. Bazhukov, N. Melnikov","doi":"10.31897/pmi.2019.5.502","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.502","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"61 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"86910648","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Salt Rock Deformation under Bulk Multiple-Stage Loading","authors":"I. Pankov, I. Morozov","doi":"10.31897/pmi.2019.5.510","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.510","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"40 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89861639","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
V. G. Milyuts, V. Tsukanov, E. Pryakhin, L. B. Nikitina
{"title":"Development of Manufacturing Technology for High-Strength Hull Steel Reducing Production Cycle and Providing High-Quality Sheets","authors":"V. G. Milyuts, V. Tsukanov, E. Pryakhin, L. B. Nikitina","doi":"10.31897/pmi.2019.5.536","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.536","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"33 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87925160","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Ensuring Stability of Undermining Inclined Drainage Holes During Intensive Development of Multiple Gas-Bearing Coal Layers","authors":"V. Brigida, V. Golik, Y. Dmitrak, O. Gabaraev","doi":"10.31897/pmi.2019.5.497","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.497","url":null,"abstract":"At high rates of production face advance, requirements towards reliable operation of undermining drainage holes get raised. The issue of maintaining high intensity of gaseous seams development under naturally increasing gas content, mining depth and capacity of production equipment poses a problem. The greatest threat comes from the loss of hole stability in the bearing pressure affected zone (in front of the face) and in the intensive shift area of overhanging rock corbels (behind the face). Intensification of air leaks due to deformation of borehole channel leads to impoverishment of removed methane-air mixture and an increasing risk to disturb safe aerogas regime in the mining area. The paper describes a mechanism of how coal-face operations affect the state of underground holes and formation of overhanging rock corbels. A typification of basic kinds of borehole deformations is presented. Authors point out critical disadvantages of the most widely-used technological schemes of gaseous seams development under high load on the production face, which hinder normal operation of a gas drainage system. As a result of research, a dependency of shot hole number, as well as the distance between shot hole axes and the borehole, on the stress state of the borehole outline has been defined more precisely. Basing on that, a formula to calculate drilling parameters of the discharge hole system has been suggested. Implementation of these measures will allow to increase the efficiency of underground gas drainage and to maintain growing intensity of gaseous coal seam development.","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"32 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80862667","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"http://pmi.spmi.ru/index.php/pmi/article/view/8354","authors":"A. Kozyaruk, A. M. Kamyshyan","doi":"10.31897/pmi.2019.5.576","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.576","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"26 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"80643589","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
V. Bazhin, T. A. Aleksandrova, E. Kotova, A. Suslov
{"title":"A Modern View of Anomalies in the Metal Groups of the Periodic System of D.I.Mendeleev","authors":"V. Bazhin, T. A. Aleksandrova, E. Kotova, A. Suslov","doi":"10.31897/pmi.2019.5.520","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.520","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"61 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79484405","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Determination of Optimal Fluorine Leaching Parameters from the Coal Part of the Waste Lining of Dismantled Electrolytic Cells for Aluminum Production","authors":"N. Nemchinova, A. Tyutrin, V. Somov","doi":"10.31897/pmi.2019.5.544","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.544","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"44 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"79989903","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Effective Power and Speed of Mining Dump Trucks in Fuel Economy Mode","authors":"V. Alexandrov, M. Vasileva, V. Koptev","doi":"10.31897/pmi.2019.5.556","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.556","url":null,"abstract":"","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"10 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82081249","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Operation of a Single-phase Autonomous Inverter as a Part of a Low-power Wind Complex","authors":"А. А. Бельский, В. С. Добуш, Ш. Ф. Хайкал","doi":"10.31897/pmi.2019.5.564","DOIUrl":"https://doi.org/10.31897/pmi.2019.5.564","url":null,"abstract":"The article discusses the experience of operating a wind power complex with a low-power wind power installa- tion (5 kW), the use of which is promising for powering remote oil production facilities, exploration and other types of mining operations. The structure of the studied complex and its characteristics, technical problems that have arisen during operation for 6 years are given. The elements of the wind energy complex – the battery charge regulator and the inverter-converter are considered. The consequences of the mechanical regulator failure of battery charge are con- sidered and recommendations for its replacement are presented. The issues of diagnostics and repair of one of the main elements of the complex – the inverter-converter, its component – DC link are highlighted in detail. Oscil- lograms of the output voltage of the inverter-converter are presented for different capacities of the DC link and the images of the repaired inverter-converter are given. Recommendations are given on choosing an inverter-converter and setting up the operating modes of the wind energycomplex .","PeriodicalId":16398,"journal":{"name":"Journal of Mining Institute","volume":"34 1","pages":""},"PeriodicalIF":2.0,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88366418","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}