Estimer les coûts 估计成本
Métier : responsable bureau d’étude/conception Pub Date : 2020-10-01 DOI: 10.51257/f-1697
Jean-Pierre Payre
{"title":"Estimer les coûts","authors":"Jean-Pierre Payre","doi":"10.51257/f-1697","DOIUrl":"https://doi.org/10.51257/f-1697","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"4 6","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"120821233","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
L'organigramme des tâches OT ou WBS OT或WBS任务的流程图
Métier : responsable bureau d’étude/conception Pub Date : 2020-10-01 DOI: 10.51257/f-1698
Jean-Pierre Payre
{"title":"L'organigramme des tâches OT ou WBS","authors":"Jean-Pierre Payre","doi":"10.51257/f-1698","DOIUrl":"https://doi.org/10.51257/f-1698","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125575138","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
La courbe en S 当然是
Métier : responsable bureau d’étude/conception Pub Date : 2020-10-01 DOI: 10.51257/f-1688
Jean-Pierre Payre
{"title":"La courbe en S","authors":"Jean-Pierre Payre","doi":"10.51257/f-1688","DOIUrl":"https://doi.org/10.51257/f-1688","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"49 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116516081","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Les parties prenantes et le management du projet 涉众和项目管理
Métier : responsable bureau d’étude/conception Pub Date : 2020-08-01 DOI: 10.51257/f-1696
Jean-Pierre Payre
{"title":"Les parties prenantes et le management du projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1696","DOIUrl":"https://doi.org/10.51257/f-1696","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"65 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125130464","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le contrat et ses spécificités 合同及其细节
Métier : responsable bureau d’étude/conception Pub Date : 2020-08-01 DOI: 10.51257/f-1686
Jean-Pierre Payre
{"title":"Le contrat et ses spécificités","authors":"Jean-Pierre Payre","doi":"10.51257/f-1686","DOIUrl":"https://doi.org/10.51257/f-1686","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"138 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133764227","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
La fonction contract manager 职能合同经理
Métier : responsable bureau d’étude/conception Pub Date : 2020-08-01 DOI: 10.51257/f-1685
J. Payre
{"title":"La fonction contract manager","authors":"J. Payre","doi":"10.51257/f-1685","DOIUrl":"https://doi.org/10.51257/f-1685","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"89 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130849047","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
L’élaboration du planning projet 制定项目计划
Métier : responsable bureau d’étude/conception Pub Date : 2020-08-01 DOI: 10.51257/f-1687
Jean-Pierre Payre
{"title":"L’élaboration du planning projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1687","DOIUrl":"https://doi.org/10.51257/f-1687","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115583943","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le management visuel Le管理可视化
Métier : responsable bureau d’étude/conception Pub Date : 2020-08-01 DOI: 10.51257/f-1695
Jean-Pierre Payre
{"title":"Le management visuel","authors":"Jean-Pierre Payre","doi":"10.51257/f-1695","DOIUrl":"https://doi.org/10.51257/f-1695","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"40 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114230775","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le cycle complet du projet 整个项目周期
Métier : responsable bureau d’étude/conception Pub Date : 2020-05-26 DOI: 10.51257/f-1682
Jean-Pierre Payre
{"title":"Le cycle complet du projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1682","DOIUrl":"https://doi.org/10.51257/f-1682","url":null,"abstract":"Le cycle du projet debute par une phase d’offre et de negociation commerciale avec le client, bien souvent de clarifications pour aboutir a la selection d’un fournisseur et un contrat qui demarre la phase d’execution du projet. Cette fiche a pour objectif de decrire ce cycle et les differentes etapes associees. L’entreprise met en place des ressources ciblees pour manager ces phases successives.","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"100 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134278445","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
La fonction de site manager dans les projets 项目中的站点经理功能
Métier : responsable bureau d’étude/conception Pub Date : 2020-05-26 DOI: 10.51257/f-1684
Jean-Pierre Payre
{"title":"La fonction de site manager dans les projets","authors":"Jean-Pierre Payre","doi":"10.51257/f-1684","DOIUrl":"https://doi.org/10.51257/f-1684","url":null,"abstract":"Dans un grand projet, les activites qui se deroulent sur le site client, tant pour la construction que pour la mise en service, necessitent un management local fort, expose directement au client et ses representants locaux et pilotant la base avancee de l’entreprise. C’est le role du site manager, bras droit du directeur de projet qui intervient sur le site des les premieres activites, prenant le relais du preparateur site qui, en amont, a securise la preparation des activites site avant la nomination du site manager et l’ouverture du site. Le preparateur site assiste pendant les travaux le site manager. Le site manager represente l’entreprise sur le site client et devant les autorites locales.","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"65 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121919419","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信