Métier : responsable bureau d’étude/conception最新文献

筛选
英文 中文
Comment bien organiser sa mission à l'étranger ? 如何组织你的海外使命?
Métier : responsable bureau d’étude/conception Pub Date : 2021-10-01 DOI: 10.51257/f-1710
Jean-Pierre Payre
{"title":"Comment bien organiser sa mission à l'étranger ?","authors":"Jean-Pierre Payre","doi":"10.51257/f-1710","DOIUrl":"https://doi.org/10.51257/f-1710","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"13 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130071114","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Comment maîtriser les six bombes à retardement des projets ? 如何控制项目中的六颗定时炸弹?
Métier : responsable bureau d’étude/conception Pub Date : 2021-10-01 DOI: 10.51257/f-1712
Jean-Pierre Payre
{"title":"Comment maîtriser les six bombes à retardement des projets ?","authors":"Jean-Pierre Payre","doi":"10.51257/f-1712","DOIUrl":"https://doi.org/10.51257/f-1712","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125837830","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Préparer la planification d’un projet à l’aide d’un outil de planning 使用计划工具准备项目计划
Métier : responsable bureau d’étude/conception Pub Date : 2021-10-01 DOI: 10.51257/f-1752
Jean-Pierre Payre
{"title":"Préparer la planification d’un projet à l’aide d’un outil de planning","authors":"Jean-Pierre Payre","doi":"10.51257/f-1752","DOIUrl":"https://doi.org/10.51257/f-1752","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"49 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116100251","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Définir les besoins d’information, collecter cette information relative au projet et la partager suivant sa cible 定义信息需求,收集与项目相关的信息,并根据目标共享
Métier : responsable bureau d’étude/conception Pub Date : 2021-06-01 DOI: 10.51257/f-1722
Jean-Pierre Payre
{"title":"Définir les besoins d’information, collecter cette information relative au projet et la partager suivant sa cible","authors":"Jean-Pierre Payre","doi":"10.51257/f-1722","DOIUrl":"https://doi.org/10.51257/f-1722","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"12 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115432628","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Choisir la structure adaptée à l’entreprise et ses activités 选择适合公司及其活动的结构
Métier : responsable bureau d’étude/conception Pub Date : 2021-06-01 DOI: 10.51257/f-1709
Jean-Pierre Payre
{"title":"Choisir la structure adaptée à l’entreprise et ses activités","authors":"Jean-Pierre Payre","doi":"10.51257/f-1709","DOIUrl":"https://doi.org/10.51257/f-1709","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124961654","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le PMO (project management office) lepmo(项目管理办公室)
Métier : responsable bureau d’étude/conception Pub Date : 2021-06-01 DOI: 10.51257/f-1723
J. Payre
{"title":"Le PMO (project management office)","authors":"J. Payre","doi":"10.51257/f-1723","DOIUrl":"https://doi.org/10.51257/f-1723","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"89 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125267038","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le management de la qualité dans les projets 项目中的质量管理
Métier : responsable bureau d’étude/conception Pub Date : 2021-06-01 DOI: 10.51257/f-1707
Jean-Pierre Payre
{"title":"Le management de la qualité dans les projets","authors":"Jean-Pierre Payre","doi":"10.51257/f-1707","DOIUrl":"https://doi.org/10.51257/f-1707","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"35 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125137738","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
De l’appel d’offres au contrat 从招标到合同
Métier : responsable bureau d’étude/conception Pub Date : 2021-06-01 DOI: 10.51257/f-1708
Jean-Pierre Payre
{"title":"De l’appel d’offres au contrat","authors":"Jean-Pierre Payre","doi":"10.51257/f-1708","DOIUrl":"https://doi.org/10.51257/f-1708","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134269089","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Le management des délais dans les projets 项目的截止日期管理
Métier : responsable bureau d’étude/conception Pub Date : 2021-04-01 DOI: 10.51257/f-1705
Jean-Pierre Payre
{"title":"Le management des délais dans les projets","authors":"Jean-Pierre Payre","doi":"10.51257/f-1705","DOIUrl":"https://doi.org/10.51257/f-1705","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"4 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"117026747","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Les équipes virtuelles, performance et rôle du chef de projet 虚拟团队、项目经理的表现和角色
Métier : responsable bureau d’étude/conception Pub Date : 2021-04-01 DOI: 10.51257/f-1720
Jean-Pierre Payre
{"title":"Les équipes virtuelles, performance et rôle du chef de projet","authors":"Jean-Pierre Payre","doi":"10.51257/f-1720","DOIUrl":"https://doi.org/10.51257/f-1720","url":null,"abstract":"","PeriodicalId":153578,"journal":{"name":"Métier : responsable bureau d’étude/conception","volume":"77 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126222044","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信