International Journal of Production Research最新文献

筛选
英文 中文
Deep learning and sequence mining for manufacturing process and sequence selection 深度学习和序列挖掘用于生产工艺和序列选择
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2024-01-01 DOI: 10.1080/00207543.2023.2290700
Changxuan Zhao, Mahmoud Dinar, S. Melkote
{"title":"Deep learning and sequence mining for manufacturing process and sequence selection","authors":"Changxuan Zhao, Mahmoud Dinar, S. Melkote","doi":"10.1080/00207543.2023.2290700","DOIUrl":"https://doi.org/10.1080/00207543.2023.2290700","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":" 873","pages":""},"PeriodicalIF":9.2,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139391776","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Low-carbon supply chain coordination through dual contracts considering pareto-efficiency 考虑帕累托效率,通过双重合同协调低碳供应链
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2024-01-01 DOI: 10.1080/00207543.2023.2296976
Shuyi Wang, S.H. Choi, Jianhua Xiao, George Q. Huang
{"title":"Low-carbon supply chain coordination through dual contracts considering pareto-efficiency","authors":"Shuyi Wang, S.H. Choi, Jianhua Xiao, George Q. Huang","doi":"10.1080/00207543.2023.2296976","DOIUrl":"https://doi.org/10.1080/00207543.2023.2296976","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"67 12","pages":""},"PeriodicalIF":9.2,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"139396033","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Managing inventory in customizable multi-echelon assembly systems 在可定制的多车间装配系统中管理库存
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-21 DOI: 10.1080/00207543.2023.2296027
Kartikeya S. Puranam, Kathleen M. Iacocca
{"title":"Managing inventory in customizable multi-echelon assembly systems","authors":"Kartikeya S. Puranam, Kathleen M. Iacocca","doi":"10.1080/00207543.2023.2296027","DOIUrl":"https://doi.org/10.1080/00207543.2023.2296027","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"46 26","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138949467","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Quantitative modelling approaches for lean manufacturing under uncertainty 不确定条件下精益生产的定量建模方法
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-21 DOI: 10.1080/00207543.2023.2293138
Tania Rojas, Josefa Mula, Raquel Sanchis
{"title":"Quantitative modelling approaches for lean manufacturing under uncertainty","authors":"Tania Rojas, Josefa Mula, Raquel Sanchis","doi":"10.1080/00207543.2023.2293138","DOIUrl":"https://doi.org/10.1080/00207543.2023.2293138","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"33 1","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138949025","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Exploring blockchain implementation challenges in the context of healthcare supply chain (HCSC) 探索医疗保健供应链(HCSC)背景下的区块链实施挑战
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-20 DOI: 10.1080/00207543.2023.2286491
Ozlem Bak, Ashley Braganza, Weifeng Chen
{"title":"Exploring blockchain implementation challenges in the context of healthcare supply chain (HCSC)","authors":"Ozlem Bak, Ashley Braganza, Weifeng Chen","doi":"10.1080/00207543.2023.2286491","DOIUrl":"https://doi.org/10.1080/00207543.2023.2286491","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"9 7","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138955477","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Robust job shop scheduling with machine unavailability due to random breakdowns and condition-based maintenance 在机器因随机故障和基于状态的维护而无法使用的情况下,进行稳健的作业车间调度
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-20 DOI: 10.1080/00207543.2023.2294114
Md. Hasan Ali, Ahmed Saif, Alireza Ghasemi
{"title":"Robust job shop scheduling with machine unavailability due to random breakdowns and condition-based maintenance","authors":"Md. Hasan Ali, Ahmed Saif, Alireza Ghasemi","doi":"10.1080/00207543.2023.2294114","DOIUrl":"https://doi.org/10.1080/00207543.2023.2294114","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"31 4","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138954985","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Quantifying organisational resilience: an integrated resource efficiency view 量化组织复原力:综合资源效率视角
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-20 DOI: 10.1080/00207543.2023.2296018
S.C. Lenny Koh, Karthik Suresh, Peter Ralph, Michelle Saccone
{"title":"Quantifying organisational resilience: an integrated resource efficiency view","authors":"S.C. Lenny Koh, Karthik Suresh, Peter Ralph, Michelle Saccone","doi":"10.1080/00207543.2023.2296018","DOIUrl":"https://doi.org/10.1080/00207543.2023.2296018","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"69 4","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138954735","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Two parallel-machine scheduling with maximum waiting time for an emergency job 紧急工作的最长等待时间两台并行机调度
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-20 DOI: 10.1080/00207543.2023.2296024
Yiwei Jiang, Haodong Yuan, Ping Zhou, T. C. E. Cheng, Min Ji
{"title":"Two parallel-machine scheduling with maximum waiting time for an emergency job","authors":"Yiwei Jiang, Haodong Yuan, Ping Zhou, T. C. E. Cheng, Min Ji","doi":"10.1080/00207543.2023.2296024","DOIUrl":"https://doi.org/10.1080/00207543.2023.2296024","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"70 6","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138956771","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Real-time vehicle relocation and staff rebalancing problem for electric and shared vehicle systems 电动汽车和共享汽车系统的实时车辆搬迁和人员再平衡问题
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-20 DOI: 10.1080/00207543.2023.2295484
Ting Wu, Min Xu, A. E. Eltoukhy
{"title":"Real-time vehicle relocation and staff rebalancing problem for electric and shared vehicle systems","authors":"Ting Wu, Min Xu, A. E. Eltoukhy","doi":"10.1080/00207543.2023.2295484","DOIUrl":"https://doi.org/10.1080/00207543.2023.2295484","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"112 24","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138953942","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
ChatGPT and generative artificial intelligence: an exploratory study of key benefits and challenges in operations and supply chain management ChatGPT 和生成式人工智能:对运营和供应链管理中的主要优势和挑战的探索性研究
IF 9.2 2区 工程技术
International Journal of Production Research Pub Date : 2023-12-20 DOI: 10.1080/00207543.2023.2294116
Samuel Fosso Wamba, Cameron Guthrie, M. Queiroz, Stefan Minner
{"title":"ChatGPT and generative artificial intelligence: an exploratory study of key benefits and challenges in operations and supply chain management","authors":"Samuel Fosso Wamba, Cameron Guthrie, M. Queiroz, Stefan Minner","doi":"10.1080/00207543.2023.2294116","DOIUrl":"https://doi.org/10.1080/00207543.2023.2294116","url":null,"abstract":"","PeriodicalId":14307,"journal":{"name":"International Journal of Production Research","volume":"26 4","pages":""},"PeriodicalIF":9.2,"publicationDate":"2023-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"138955096","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信