Jurnal Teknik Sipil LATERAL最新文献

筛选
英文 中文
ANALISIS SALURAN DRAINASE AKIBAT GENANGAN DI KECAMATAN ILIR TIMUR II KOTA PALEMBANG
Jurnal Teknik Sipil LATERAL Pub Date : 2023-06-03 DOI: 10.52333/lateral.v1i1.130
Ayu Marlina, Reni Andayani, Zuul Fitriana Umari, Musaddad
{"title":"ANALISIS SALURAN DRAINASE AKIBAT GENANGAN DI KECAMATAN ILIR TIMUR II KOTA PALEMBANG","authors":"Ayu Marlina, Reni Andayani, Zuul Fitriana Umari, Musaddad","doi":"10.52333/lateral.v1i1.130","DOIUrl":"https://doi.org/10.52333/lateral.v1i1.130","url":null,"abstract":"Changes in land use in an area greatly affect water absorption. Inundation occurred in Ilir Timur II Subdistrict, Palembang City due to lack of maintenance of drainage channels and changes in land conversion which was originally land into a water catchment area, now it is a concrete or residential area. During the rainy season, water will fill residents' spaces in the form of puddles and floods, which will continue to increase surface runoff in the area. The impact of the inundation is very disturbing and detrimental to various parties. The purpose of this study is to determine the peak discharge, analyze existing drainage, and plan a new secondary drainage design. The data used are primary data, namely channel length measurement data, channel slope, and existing channel dimension measurement data. While the secondary data used is in the form of 10-year rainfall data obtained from two rain posts, namely the rain post in Sako District and the rain post in Ilir Barat I District, as well as land use data in the Fruit Watershed of Palembang City covering an area of 1222.89 hectares. Then carry out an analysis of changes in land use currently and calculation of peak discharge to plan the dimensions of the new secondary drainage channel. The current peak discharge (Qp) calculation results in the studied area are 24.4 m3/s. For the calculation of channel dimensions, it is planned to have a rectangular cross-section with channel dimensions at sta 0.00 - 672.80 m, namely the channel dimension height is 4.5 m, the channel width is 4.5 m, and the guard height (f) is 0.30 m. From the results of analysis and calculations it is known that with the dimensions of the new drainage design there will be no runoff along the secondary canal. It is hoped that this can be a reference in planning the drainage rearrangement in Ilir Timur II District to reduce frequent inundation.","PeriodicalId":126911,"journal":{"name":"Jurnal Teknik Sipil LATERAL","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2023-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116967156","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信