Izzat Thiyahuddin, Z. Ahamid, M. H. M. Daud, Azam Abdul Rahman, M. Sulaiman, Ismail Abdul Hamid, Jing Xianghai, Xu Liangbiao, Wan M Razlan Wan Razali
{"title":"Material Selection Process for Non-Metallic Flexible Buoyancy Bags Assembly in Decommissioning and Marine Salvage","authors":"Izzat Thiyahuddin, Z. Ahamid, M. H. M. Daud, Azam Abdul Rahman, M. Sulaiman, Ismail Abdul Hamid, Jing Xianghai, Xu Liangbiao, Wan M Razlan Wan Razali","doi":"10.2118/210616-ms","DOIUrl":"https://doi.org/10.2118/210616-ms","url":null,"abstract":"\u0000 Offshore structure decommissioning and abandonment is a critical component in the life cycle of hydrocarbon production. In Malaysia, 11% of platforms and 8% of pipelines have been in service for more than 40 years, much exceeding their intended lifespan. Conventional methods of decommissioning offshore platform are inherently very costly with the mobilization and operation of HLV (Heavy Lift Vessel).\u0000 This study developed an Offshore Flexible Buoyancy Tank (OFBT) as the buoyancy assembly to execute future small structure removal operation. This study applies the structured material selection process to determine suitable material as buoyancy assembly enclosure. According to the concept, material selection seeks to determine the lightest, pressure-sustaining, fracture-resistant and cost-effective buoyancy bags suitable for the application. This is a problem with 3 objectives: minimize weight, minimize cost, and withstand the internal pressure in above or submerged conditions.\u0000 A range of material is tested based on the parameters, and it was determined that Two layers of PET membrane is proposed for OFBT with capacity not less than 380 kN/m. An additional layer is also required to protect the buoyancy bag from puncture or tear. Yard burst test testing is implemented to determine the accuracy of FEA model. A prototype OFBT is fabricated to consist of 3-layer flexible polymer sheet to create an air-containment enclosure.\u0000 Overall, the FEA correlates well with the result from the burst test. Both burst tests indicate the failure to occur the flange area. The circumferential stiffeners were observed to fail first followed by Longitudinal stiffeners. Results from this work is integrated in the research towards the development of novel flexible offshore buoyancy tank assembly for the removal of jacket structure in decommissioning and abandonment suited to the application in Malaysia.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"39 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125294518","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Reducing Laverda Canyon Field Production Uncertainty with Early Lifecycle Time-Lapse 4D Seismic Data","authors":"Maddison Fairburn, Hayley Sophia Pedler, J. Louis","doi":"10.2118/210673-ms","DOIUrl":"https://doi.org/10.2118/210673-ms","url":null,"abstract":"\u0000 A time-lapse seismic survey (4D) acquired over Laverda Canyon Field has provided significant value and reduced production uncertainty early in the field lifecycle. At time of monitor one (M1) acquisition completion in April 2020 approximately 9% of the expected ultimate recoverable volumes were produced over the initial nine months of production. Horizontal wells targeting the two high-quality, vertically adjacent, oil and gas bearing reservoirs produce via waterflood. Prior to start-up, compartmentalisation was identified as a key risk due to interpreted high stratigraphic and structural complexity however, initial production data indicated greater connectivity than predicted.\u0000 The 4D successfully shows changes resulting from production within the field. Inversion of the final data to compressibility using a wave-equation-based amplitude-versus-offset approach assisted with interpretation by reducing noise and providing a direct property to correlate the impact of changing saturation and pressure within the reservoir. Water sweep, gas evolution, gas movement and pressure increase responses were calibrated at the wells prior to extrapolating interpretation of fluid flow away from well control. These insights were used to guide updates to the reservoir model. An updated fault-framework provides additional structural connectivity via cross-juxtaposition of reservoirs. Polygons corresponding to vertical stratigraphic connectivity via erosive down-cutting channels provides additional stratigraphic connectivity. Dynamic reservoir modelling has utilised connectivity polygons as well as more traditional history-matching parameters to show an overall improvement in replicating field production. Additionally, the reservoir model has been used to simulate the observed 4D response.\u0000 Improved understanding of field behaviour unlocked with the 4D has resulted in a higher level of confidence in the model for reservoir management and forecasting. Optimisations to the field operating strategy include revisions to the waterflood strategy to improve sweep and reduce gas migration and improved flexibility in voidage management. Future strategic facility decisions regarding project end of field life, development and assessment of near field tie-in opportunities will benefit.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"67 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128803850","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Nurul Athirah Wahid Ali, K. Alang, Haifeng Wang, Arthur Goh Jin Wang, Stefanie Chuah Mei Mei, Nik Fazril Ain Sapian, Siti Nurfarhana Bt M Zaid, N. L. Rafiuddin, Nagarajan AL Naupa, Khairul Ikram A Aziz
{"title":"Application of High-Definition Reservoir Scale Mapping-While-Drilling with Comprehensive Formation Evaluation in the Challenging Low Resistivity Contrast Environment","authors":"Nurul Athirah Wahid Ali, K. Alang, Haifeng Wang, Arthur Goh Jin Wang, Stefanie Chuah Mei Mei, Nik Fazril Ain Sapian, Siti Nurfarhana Bt M Zaid, N. L. Rafiuddin, Nagarajan AL Naupa, Khairul Ikram A Aziz","doi":"10.2118/210771-ms","DOIUrl":"https://doi.org/10.2118/210771-ms","url":null,"abstract":"\u0000 The horizontal wells within the context of this case study are located offshore Malaysia, where the reservoirs vary in grain size and quality. The infill wells include 3 oil producer wells targeting S reservoir and 1 horizontal sidetrack well targeting R1-R3 subunit reservoirs. The horizontal wells’ objective is to optimize minimum lateral length of 1,000-2,000ft MD at 1/3 vertical standoff from GOC within the target oil column. Based on recent data from offset wells, the fluid contacts (GOC and OWC) remained uncertain, hence well placement within the target oil column becomes the main challenge. The wells are expected to have low resistivity contrast between oil and water composition. In this kind of reservoir environment, the standard reservoir mapping tool may not be sufficient for differentiating reservoir fluid properties of oil and water bearing formation.\u0000 For such challenging condition, an integrated real-time well placement technology, high tier triple-combo logs, Neutron Near- Far count and Formation Sigma measurements were deployed to fully achieve drilling objectives. 3 horizontal wells with 1 horizontal sidetrack well were successfully executed within the target zone, achieving objectives beyond expectation. A new generation of LWD tool including high-definition reservoir mapping-while-drilling technology with advanced inversion was deployed to fulfill geosteering requirements. The workflow presented in this project is a synergized scope of multi-domain, from both drilling and subsurface.\u0000 This case study demonstrated the value of high-definition reservoir scale mapping technology. It provides an innovative and deterministic method to identify low resistivity low contrast boundaries of oil from transitional water zone which was difficult to be achieved by conventional reservoir mapping tool. At the landing section, the high-definition tool helped to reveal clearly OWC below the tool with greater confidence compared to the standard tool. The information from the high-definition tool, paired with the fluid identification offered from Neutron-Density and Neutron Near- Far count together were essential for an accurate landing. The usage of reservoir scale mapping technology in the horizontal section revealed the tilted OWC and reservoir structure at the same time, which allowed the team to achieve the required minimum production length while maintaining required standoff from the OWC. All wells were geosteered successfully with the accomplishment of placing the trajectories in optimum positions despite having a tight TVD window.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"27 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131584794","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Rama Anggarawinata, C. Yeo, Hung Jie Thien, Choon Hoong Teo, Brian Bargewell
{"title":"Single Run Plug and Abandonment Cementing Operation Across Multiple Casings","authors":"Rama Anggarawinata, C. Yeo, Hung Jie Thien, Choon Hoong Teo, Brian Bargewell","doi":"10.2118/210658-ms","DOIUrl":"https://doi.org/10.2118/210658-ms","url":null,"abstract":"\u0000 One objective of well abandonment is to help prevent pollution to the environment from residual fluids left in the well post caprock restoration. These fluids may have been present in the annuli when well construction was commenced. They are normally removed when the casing(s) is retrieved from the well and capped with an environmental cement plug, or more recently, via perforating the casing(s) and circulating out the annuli contents prior to setting the environmental cement plug.\u0000 Gaining access to the annuli is achieved via tubing conveyed perforation (TCP) guns and the charges are designed to penetrate the targeted casing(s) with sufficient entry hole diameter (EHD) without causing damage to the casing beyond. Fluid is then circulated into the annuli via the perforations with returns taken through the wellhead side outlet valves (SOVs). Cement is subsequently circulated into the annuli and a wellbore cement plug is placed above the cement retainer thereafter to form an environmental plug.\u0000 This approach requires two trips, the first where the mechanical setting tool, cement retainer with TCP guns attached below is run into the well to perforate the casings and perform the cement circulation. The second trip is with a cement stinger to place a wellbore plug above the cement retainer after the Mechanical Setting Tool (MST) has been retrieved. The retrieval of the MST is required as the MST outside diameter (OD) is almost equal to the inside diameter (ID) of casing. This can cause cement swabbing and contamination if pulled through the cement plug after the placement.\u0000 In this case, an alternative Bottomhole Assembly (BHA) was explored where the entire operation can be performed in a single trip. This involved the use of a hydraulically set cement retainer that comes with a slick tubing for placing the cement plug once the running tool is removed from the cement retainer. The cement slurry design was tailored to allow for additional thickening time to compensate for the single trip run.\u0000 A successful trial was performed in Brunei's operations in the 3rd quarter of 2021, where the cement was placed immediately above the cement retainer after annuli fluids removal and cement circulation in the B and C annuli after perforations were completed.\u0000 A single trip system with revised cement slurry design has also been trialed successfully to enable removal of residual fluids and cementing of the annuli and a wellbore cement plug to be placed in a single trip. This reduces HSE exposure to the crew and achieved significant time and cost savings.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"305 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115768599","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Xiu-rong Wang, Zhe Sun, Jian Zhang, Bocheng Huang, Jie Cao
{"title":"Preparation and Microscopic Mechanism Analysis of a New Micro-Nano System for Enhanced Oil Recovery","authors":"Xiu-rong Wang, Zhe Sun, Jian Zhang, Bocheng Huang, Jie Cao","doi":"10.2118/210653-ms","DOIUrl":"https://doi.org/10.2118/210653-ms","url":null,"abstract":"\u0000 The micro-nano displacement system is a novel flooding system developed in recent years, and has garnered considerable attention of scientists. It can achieve deep fluid diversion and expand the swept volume. Owing to its low cost, we employed the flake nanomaterial laponite. In this study, we modified laponite twice to achieve amphiphilic properties. In addition, we conducted structural characterization and performance testing of the modified particles to study the effect of this amphiphilic property on enhanced oil recovery. Based on the results, we successfully synthesized amphiphilic modified LAS laponite particles using the interface method. Furthermore, LAS has good stability even under high temperature conditions, and it can reduce the interfacial tension from 14.9 mN/m to 9.6 mN/m under low dosage conditions at a concentration of 200 mg/L. Nanoparticles exhibit good performance and transport abilities in porous media. According to the reservoir adaptability evaluation, matching relationships between the particle sizes and core permeability were obtained. The oil displacement mechanism of the particles in the pore throat was explored through microfluidic experiments. In addition, the distribution law of the remaining oil during the displacement process was analyzed, which showed that nanoparticles can expand the swept volume. 3D macro physical simulation experiments showed that nanoparticles can enhance oil recovery. Through interdisciplinary innovative research methods, the preparation and microscopic mechanism of nanosystems have been researched, which proves their progressiveness and superiority. The research results provide a theoretical basis and technical support for significantly enhancing oil recovery.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124837320","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"A Simplified Approach to the Analysis of Commingled Wells Whose Layers Have Contrasting Skins","authors":"N. Last, K. Jongkittinarukorn","doi":"10.2118/210634-ms","DOIUrl":"https://doi.org/10.2118/210634-ms","url":null,"abstract":"\u0000 It has been well documented in the literature that commingled wells in which the different layers have different levels of formation damage – also known as skin – yield anomalous values of formation transmissibility (kh) when they are tested. Specifically, the apparent transmissibility resulting from pressure transient analysis of such wells is typically lower than the arithmetical sum of the transmissibilities of the individual layers. The objective of this study is to present a simple method to quantify this kh reduction effect that is applicable to cases with unlimited numbers of layers that may have different layer pressures as well as different skins.\u0000 The methodology starts with the quantification of each layer's productivity index (J), as a function of its kh and skin, during transient inflow conditions. During this transient period, J is not constant but decreases with time, and the apparent kh of the well is then calculated as a function of the evolution with time of the productivity indices of the individual layers. The method is applied to cases where layer skins are different but initial layer pressures are the same, as well as to cases where both skins and pressures differ between layers. The method is then extended again to the case of stabilized inflow conditions, at which time J is conventionally considered to be no longer changing.\u0000 The outcome of the study is a simple equation that allows the apparent transmissibility of the commingled well to be calculated, for any number of layers with differing pressures and skins, under transient or stabilized inflow conditions. The quantification of the apparent transmissibility then allows the apparent total-well skin to be easily calculated. It is shown that, for certain combinations of layer skins and layer pressures, the transmissibility reduction effect is significantly smaller than expected and, in some circumstances, might not be observed at all. This result is at odds with the current understanding as set out elsewhere in the literature.\u0000 The results of this study point towards alternatives to the conventional methods that are used for testing and analyzing commingled wells, and also have implications for the design of well stimulation programs.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"10 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127459209","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Fahad M. Alotaibi, Faisel M Al-Dossari, Fahad M Al-Majed, Ali M. Al-Hajri, Talal Al-Zahrani
{"title":"Berri Increment Novel Waste Heat Recovery System","authors":"Fahad M. Alotaibi, Faisel M Al-Dossari, Fahad M Al-Majed, Ali M. Al-Hajri, Talal Al-Zahrani","doi":"10.2118/210714-ms","DOIUrl":"https://doi.org/10.2118/210714-ms","url":null,"abstract":"\u0000 Berri Crude Increment Project (currently in the Execution phase) will install a new oil processing facility. As part of the project, a new thermal hot oil system will be provided to heat the crude oil for the desalting and stabilization process to meet the product specifications. This heating is primarily achieved through three hot oil heaters (furnaces) fueled by natural gas in a closed heating circulation system. The objective is to maximize the energy utilization and efficiency of the oil processing facility by integrating the waste heat of the plant turbines’ exhaust with the plant process heating network.\u0000 The project added in the scope a waste heat recovery system as part of the hot oil loop to recover the energy and maximize the plant’s efficiency. The waste heat recovery consists of heat exchangers mounted on the plant combustion gas turbines to recover the exhaust heat and supply it to the plant heat demand. These turbines are fueled by natural gas to drive the water injection pumps at the facility.\u0000 This design enhancement will minimize fuel gas burning in the hot oil heaters to supply the required process heating, and will reduce combustion product emissions from the hot oil heaters’ stacks to atmosphere. The anticipated benefits are as follows:Recover energy of up to 75 MW that represent 50% of the total heating duty.Optimize lifecycle cost through Savings by reducing fuel gas burning by 50%.Reduce greenhouse gases emissions by minimizing the hot oil heaters’ fuel gas consumption.Improve equipment and plant efficiency (10% turndown of process heating can be achieved).Minimize single point of failure through the increase of plant availability with flexible process heating design.\u0000 This energy integrated design is one of a kind among conventional oil and gas surface facilities with very high energy recovery capability. The facility is expected to recover 50% of its total thermal duty needed by processes through efficient energy utilization. In addition, substantial environmental advantages are foreseen by reducing the plant combustion effluents. This is important for a processing facility located in an area that is considered a hub of several marine and environmental initiatives of Saudi Aramco.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"5 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122599997","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Breakthrough Stimulation Method: Dilation Cyclic Extended Breakdown to Enhance Well Injection Performance and Stimulation Cost Efficiency in South Sumatra -Indonesia","authors":"Nayung Galih Proboseno, Ridwan Kiay Demak, Rina Riviana, Ayi Yanuardi, Sakti Parsaulian, Dayanara Surya, Rudhy Setiawan","doi":"10.2118/210779-ms","DOIUrl":"https://doi.org/10.2118/210779-ms","url":null,"abstract":"\u0000 Water injection is an essential part of brown oilfield development plan both of pressure maintenance or water production management. The high cost and often tight economic margins associated with injection wells capacity require that the chosen stimulation technique not only provides an effective result to maximize injection well capacity but also carries an acceptable risk in term of the project cost and safety. Many well known techniques, such as fracturing and matrix acidizing have been developed over the years to achieve this result and are common in most water injection well operations. The objective of this paper is to show a new approach of stimulation technique can be maximized both of injection capacity and cut operational cost Dilation Cyclic Breakdown is a breakthrough stimulation technique through hydraulic treatment by injected high volume of formation water into the reservoir below tensile stress and above shear stress. The primary design that have led to these technique include the following steps : Certain criteria were used for pilot well such as hall plot and single well of nodal analysis. Operation can be performed by rigless operation and no chemical additive needed, equipment selection is approached by 3D fracture simulator both surface pressure and injection rate correlated to mechanical earth model syntethic. Pumping schedule and the number of cycle is optimized by pressure calibration analysis during Breakdown test, Step Rate Test and decline pressure analysis. It was critical that Step Rate Test and decline pressure analysis procedure be performed to determine fracture gradient as upper bound pressure and shear gradient as lower bound pressure.\u0000 Various procedures were used in handling data recorded. Injection and pressure data from each well were plotted to observe the trend in the rate - pressure relationship. Nine injection wells were stimulated during 2020 - 2021. It has been an attractive result both of cut operational cost and increase injection capabilities. The operational cost per well can be reduced to $ 46,000 or 72% cheaper than matrix acidizing stimulation and the total incremental injection rate reach to 14,907 Bwipd or 1,656.3 Bwipd per well. A half of those injection wells were previously stimulated by matrix acidzing method but has not yet improved significantly. In addition, this method is also applied for two oil producer wells in sandstone reservoir as a pilot test. The increasing of Productivity Index greater 6.5 - 8x than initial as a result and has still been observed. Furthermore, this paper should be beneficial to all engineers currently working in brown and marginal Oil Field with tight economic margins to increase the production.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127928831","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Moving Rig Time Efficiency to Improve Operations, Reduce Non-Productive Time Rig and Emission Co2 Using on Trailer","authors":"T. Hidayat, Erwin Hariagung, Suharto Suharto, Fajar Kurniawan, Didi Rosandi, Reza Riswandana, Rahmat Taufik Hidayat, Gondo Irawan, Imam Setiadhi, N. Almadani","doi":"10.2118/210741-ms","DOIUrl":"https://doi.org/10.2118/210741-ms","url":null,"abstract":"\u0000 One of the efforts achieve Key Performance Indicator is to realize efficient organizational performance. Optimizing rig movement management is needed in PT. Pertamina Hulu Indonesia Sangasanga Field by reducing the duration of moving between wells and ensuring that the Rig cycle time kept to minimum. In real condition, all equipment in rig unit is still arranged on its own Skid with a large number of transport loads and in the activity of moving Rig/Hoist equipment between wells, all equipment transported is moved and rearranged at the next well location by using Winch Truck, Truck Crane, Flatbed truck and Crane. Moving activities with Winch Trucks and Truck Cranes accompanied by lifting activities have a high risk with 14 loading loads per moving rig. With far distance between sub working area and various obstacles such as river, bridge load limit, land and river transportation types resulting in long rig moving time. In 2019, to the second semester 2020 the loss when moving rigs reached USD 1,483 Million. The limited number of lifting and transporting equipment, the number of equipment and the loading-unloading process are the dominant cause for long moving rig time. To solve this problem, we modify the rig equipment into an On Trailer with the aim to arrange all Rig operational support equipment on the trailer both during operation and moving, and to reduce the number of loads, rig moving time and the risk of lifting. On Trailer is equipped with Handrail & walkway, sets of manual jacks, and trailer and prime mover connection including pneumatic line system. After the implementation of On Trailer, the frequency of loading, unloading and setting work drops to 9 times lower so the potential for tool damage decreases, moving rig time managed to decrease to 9.6 hours thus decrease rig personnel workload. By using On Trailer, it successfully reached cost efficiency of USD 1,354/well, the risk of work accidents due to lifting & rigging activities minimized to 9 times and reduce the CO2 emission is 2,487 Gj/year due to decrease of fossil fuel consumption.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"48 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132135985","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
Sunisa Watcharasing, Chularat Wattanakit, Anawat Thivasasith, P. Kiattikomol
{"title":"Circular Model for E&P: Production Sand Conversion to Nanosilica and Hierarchical Zeolites","authors":"Sunisa Watcharasing, Chularat Wattanakit, Anawat Thivasasith, P. Kiattikomol","doi":"10.2118/210667-ms","DOIUrl":"https://doi.org/10.2118/210667-ms","url":null,"abstract":"\u0000 As part of circular model for E&P, production sand waste from oil production process will be converted to new high value-added product, called \"Nanosilica\", and \"Hierarchical Zeolites\". This is beneficial in terms of lower amount of production sand waste disposal to landfill.\u0000 There are three main steps for sand conversion to nanosilica and hierarchical zeolites which compose of1) Sand Pre-treatment, 2) Nanosilica Extraction, and 3) Hierarchical Zeolite Synthesis. In the first step of Sand Pre-treatment process, production sand was pretreated by using water and acid washing 3M HCl, follow by calcination. Secondly, pretreated sand will be extracted to obtain nanosilica by boiling pretreated sand with 3M NaOH solution to get sodium silicate, and finally adding HCl to precipitate nanosilica. Finally, the extracted nanosilica will be further reacted with Structure Directing Agent (SDA); zeolite template, under hydrothermal treatment process for crystallization of Hierarchical Zeolites.\u0000 Nanosilica extracted from production sand contain high specific surface area around 200 – 600 m2/g, with small particle size less than 50 nm. Nanosilica can be applied in many applications such as Gas separation, Adsorption, Catalysis, Ion-exchange, and Detergent.\u0000 Hierarchical Zeolites with nanosheets morphology obtain many niche characteristics to overcome the limitation of conventional zeolites in terms of, 1) good mass transportation through active sites due to their microporous structure improvement, 2) high surface area, and 3) longer catalyst lifetime.\u0000 Hierarchical Zeolites is popularly used in wide range of applications such as separation, ion-exchange to catalysis. Two most popular Hierarchical Zeolites nanosheet ZSM-5, and Faujasite (FAU) topologies have been developed in this work. The physicochemical properties were compared with the one synthesized using the commercial chemical grade of silica sources. The results show that the nanosilica from production sand can be achievable for Hierarchical Zeolites synthesis, by comparing the physicochemical properties such as surface area, porosity, topology, and textural properties with the one obtained using the commercial silica sources.\u0000 Hierarchical zeolites from production sand waste are initiated in PTTEP as part of Circular Model for E&P. The synthesized hierarchical zeolites from this project will be further possibly applied in-house in PTTEP as the moisture adsorbent in instrument air, or moisture in condensate. This would help company for reduce OPEX cost. From these preliminary findings, all information will be further applied to the process design of in prototype, and scale-up phase.","PeriodicalId":116990,"journal":{"name":"Day 3 Wed, October 19, 2022","volume":"88 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2022-10-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132308689","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}