Reliability Engineering最新文献

筛选
英文 中文
ACCELERATED LIFE TESTING 加速寿命试验
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.ch6
{"title":"ACCELERATED LIFE TESTING","authors":"","doi":"10.1002/9781119665946.ch6","DOIUrl":"https://doi.org/10.1002/9781119665946.ch6","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"43 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"84123748","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 56
APPENDIX C: OPTIMUM ARRANGEMENT OF COMPONENTS IN CONSECUTIVE‐2‐OUT‐OF‐ N : F SYSTEMS 附录c:连续- 2 - out - of - n: f系统中组件的最佳安排
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app3
{"title":"APPENDIX C: OPTIMUM ARRANGEMENT OF COMPONENTS IN CONSECUTIVE‐2‐OUT‐OF‐\u0000 N\u0000 :\u0000 F\u0000 SYSTEMS","authors":"","doi":"10.1002/9781119665946.app3","DOIUrl":"https://doi.org/10.1002/9781119665946.app3","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"111 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"72879140","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX J: BAKER'S ALGORITHM 附录j:贝克算法
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app10
{"title":"APPENDIX J: BAKER'S ALGORITHM","authors":"","doi":"10.1002/9781119665946.app10","DOIUrl":"https://doi.org/10.1002/9781119665946.app10","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"85 2 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"91064872","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX I: COEFFICIENTS ( a i AND b i ) OF THE BEST ESTIMATES OF THE MEAN ( μ ) AND STANDARD DEVIATION ( σ ) IN CENSORED SAMPLES UP TO n = 20 FROM A NORMAL POPULATION 附录一:在n = 20以内的正常总体截尾样本中,均值(μ)和标准差(σ)的最佳估计值的系数(a1和b2)
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app9
{"title":"APPENDIX I: COEFFICIENTS (\u0000 a\u0000 \u0000 i\u0000 \u0000 AND\u0000 b\u0000 \u0000 i\u0000 \u0000 ) OF THE BEST ESTIMATES OF THE MEAN (\u0000 μ\u0000 ) AND STANDARD DEVIATION (\u0000 σ\u0000 ) IN CENSORED SAMPLES UP TO\u0000 n\u0000 = 20 FROM A NORMAL POPULATION","authors":"","doi":"10.1002/9781119665946.app9","DOIUrl":"https://doi.org/10.1002/9781119665946.app9","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"2 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"89735065","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX E: THE NEWTON–RAPHSON METHOD 附录e: newton-raphson法
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app5
{"title":"APPENDIX E: THE NEWTON–RAPHSON METHOD","authors":"","doi":"10.1002/9781119665946.app5","DOIUrl":"https://doi.org/10.1002/9781119665946.app5","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"25 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"82788965","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
RENEWAL PROCESSES AND EXPECTED NUMBER OF FAILURES 更新过程和预期的故障数量
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.ch9
{"title":"RENEWAL PROCESSES AND EXPECTED NUMBER OF FAILURES","authors":"","doi":"10.1002/9781119665946.ch9","DOIUrl":"https://doi.org/10.1002/9781119665946.ch9","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"12 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"87761414","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX A: GAMMA TABLE 附录a:伽马表
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app1
{"title":"APPENDIX A: GAMMA TABLE","authors":"","doi":"10.1002/9781119665946.app1","DOIUrl":"https://doi.org/10.1002/9781119665946.app1","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"74 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73445543","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX L: CRITICAL VALUES OF χ 2 附录1:χ 2的临界值
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app12
{"title":"APPENDIX L: CRITICAL VALUES OF\u0000 χ\u0000 2","authors":"","doi":"10.1002/9781119665946.app12","DOIUrl":"https://doi.org/10.1002/9781119665946.app12","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"75 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"85898584","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX H: COMPUTER LISTING OF THE NEWTON–RAPHSON METHOD 附录h: newton-raphson法的计算机列表
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app8
{"title":"APPENDIX H: COMPUTER LISTING OF THE NEWTON–RAPHSON METHOD","authors":"","doi":"10.1002/9781119665946.app8","DOIUrl":"https://doi.org/10.1002/9781119665946.app8","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"12 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"73692840","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
APPENDIX D: COMPUTER PROGRAM FOR SOLVING THE TIME‐DEPENDENT EQUATIONS 附录d:求解时间相关方程的计算机程序
Reliability Engineering Pub Date : 2020-11-13 DOI: 10.1002/9781119665946.app4
{"title":"APPENDIX D: COMPUTER PROGRAM FOR SOLVING THE TIME‐DEPENDENT EQUATIONS","authors":"","doi":"10.1002/9781119665946.app4","DOIUrl":"https://doi.org/10.1002/9781119665946.app4","url":null,"abstract":"","PeriodicalId":101070,"journal":{"name":"Reliability Engineering","volume":"8 1","pages":""},"PeriodicalIF":0.0,"publicationDate":"2020-11-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"88908324","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信