{"title":"Recycling construction materials in a developing country: Four case studies","authors":"Issam M. Srour, G. Chehab, Nicolas Gharib","doi":"10.1504/IJEME.2012.048609","DOIUrl":"https://doi.org/10.1504/IJEME.2012.048609","url":null,"abstract":"This paper describes the state of practice of Construction Demolition Waste (CDW) management in a developing country, namely Lebanon, through four case studies. Three of the case studies relate to emergency CDW, mostly building construction materials. The fourth case study addresses non-emergency CDW, particularly Recycling Asphalt Pavement (RAP). Preliminary results indicate varying levels of recycling rates across the four case studies. The paper concludes with drivers for recycling as well as the obstacles preventing higher recycling rates.","PeriodicalId":437677,"journal":{"name":"2010 Second International Conference on Engineering System Management and Applications","volume":"52 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2010-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125232426","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"A contribution to the modelling and the resolution of a multi-objective Dial a Ride Problem","authors":"I. Zidi, K. Mesghouni, K. Zidi, K. Ghédira","doi":"10.1504/IJEME.2012.048607","DOIUrl":"https://doi.org/10.1504/IJEME.2012.048607","url":null,"abstract":"The paper describes a system for the solution of Dial a Ride Problem (DRP). Dial a Ride Problem (DRP) is to take over the passenger from a place of departure to a place of arrival. It is characterized by a set of transport demands and a number of vehicles available. The ultimate aim is to offer an alternative to displacement optimized individually and collectively. The DRP is classified as NP-hard problem that's why most research has been concentrated on the use of approximate methods to solve it. Indeed, it is a multi-criteria problem, the proposed solution of which aims to reduce both route duration, and cost in response to a certain quality of service provided. In this work, we offer our contribution to the study and solving the DRP in the application using the simulated annealing algorithm. Tests show competitive results on (Cordeau and Laporte, 2003) [4] benchmark datasets while improving processing times.","PeriodicalId":437677,"journal":{"name":"2010 Second International Conference on Engineering System Management and Applications","volume":"83 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2010-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134271254","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}