Trans-European Railway High-Speed Master Plan Study: Phase 2最新文献

筛选
英文 中文
Questionnaire for Collection of Information and Data on TER States and their Railway Network 收集TER各州及其铁路网信息和数据的调查表
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c010
{"title":"Questionnaire for Collection of Information and Data on TER States and their Railway Network","authors":"","doi":"10.18356/9789210054959c010","DOIUrl":"https://doi.org/10.18356/9789210054959c010","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"68 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115186468","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Methodology, definitions and rules for the identification of high-speed railway projects 高速铁路项目认定的方法、定义和规则
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c005
{"title":"Methodology, definitions and rules for the identification of high-speed railway projects","authors":"","doi":"10.18356/9789210054959c005","DOIUrl":"https://doi.org/10.18356/9789210054959c005","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115460714","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Identification of TER HSR Network TER高铁网络的识别
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c007
{"title":"Identification of TER HSR Network","authors":"","doi":"10.18356/9789210054959c007","DOIUrl":"https://doi.org/10.18356/9789210054959c007","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"64 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127090205","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Methodology for determining the minimum number of passengers to obtain economic efficiency 确定最低乘客人数以获得经济效益的方法
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c012
{"title":"Methodology for determining the minimum number of passengers to obtain economic efficiency","authors":"","doi":"10.18356/9789210054959c012","DOIUrl":"https://doi.org/10.18356/9789210054959c012","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"36 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122188642","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Conditions for the implementation of Master Plan 实施总体规划的条件
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c008
{"title":"Conditions for the implementation of Master Plan","authors":"","doi":"10.18356/9789210054959c008","DOIUrl":"https://doi.org/10.18356/9789210054959c008","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128043133","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
HSR implementation costs and expected results 高铁实施成本和预期结果
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c011
{"title":"HSR implementation costs and expected results","authors":"","doi":"10.18356/9789210054959c011","DOIUrl":"https://doi.org/10.18356/9789210054959c011","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"6 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121172435","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
China experience in HSR funding and financing 中国在高铁融资方面的经验
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c014
{"title":"China experience in HSR funding and financing","authors":"","doi":"10.18356/9789210054959c014","DOIUrl":"https://doi.org/10.18356/9789210054959c014","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"44 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125931262","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Examples HSR lines financed using PPP schemes 使用PPP方案融资的高铁线路
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c013
{"title":"Examples HSR lines financed using PPP schemes","authors":"","doi":"10.18356/9789210054959c013","DOIUrl":"https://doi.org/10.18356/9789210054959c013","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"134451199","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Socioeconomic, technical and operational aspects of HSR system design 高铁系统设计的社会经济、技术和运营方面
Trans-European Railway High-Speed Master Plan Study: Phase 2 Pub Date : 2021-10-21 DOI: 10.18356/9789210054959c006
{"title":"Socioeconomic, technical and operational aspects of HSR system design","authors":"","doi":"10.18356/9789210054959c006","DOIUrl":"https://doi.org/10.18356/9789210054959c006","url":null,"abstract":"","PeriodicalId":429708,"journal":{"name":"Trans-European Railway High-Speed Master Plan Study: Phase 2","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126524847","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书