{"title":"Data Driven Analysis for Modernization Program Management","authors":"Brittany Boser","doi":"10.2172/1825472","DOIUrl":"https://doi.org/10.2172/1825472","url":null,"abstract":"NNSA is responsible for managing national nuclear security missions: ensuring a safe, secure, and reliable nuclear deterrent; supplying nuclear fuel to the Navy; and supporting the nation’s nuclear nonproliferation efforts. However, over half of NNSA’s facilities are more than 40 years old, and roughly one-third date back to the Manhattan Project. To execute its critical nuclear security missions, NNSA is making large investments to modernize its nuclear production capabilities. This ramp up represents NNSA’s largest modernization effort since the Cold War. Given the scale of these efforts, NNSA’s Office of Secondary Stage Production Modernization has implemented data driven techniques to prioritize investments and inform strategic decision making. NNSA, with support from its site managing contractors, has developed and implemented an integrated schedule and risk management system to address the issues and limitations with the traditional approach. The multi-year integrated schedules are key to identifying program linkages and managing large portfolios comprised of many different projects and efforts. In conjunction with the integrated schedule, a new program risk management system has also been developed and implemented, which manages program risks and opportunities, along with specific mitigation strategies to reduce or eliminate the risks per timelines that are tracked in the integrated schedule. This paper is supplemented with a follow-on presentation on effective management of program material and throughput modeling. THE MODERNIZATION EFFORT The NNSA Office of Secondary Stage Production Modernization is responsible for developing, implementing, and overseeing efforts to modernize the production capabilities for enriched uranium (EU), depleted uranium (DU), lithium, and special materials (SM) to meet NNSA and United States (U.S.) Department of Energy (DOE) mission needs. The implementation of production modernization at the Y-12 National Security Complex (Y-12) requires the expanded use of integrated program scheduling, risk management, and material supply/demand modeling. These management tools promote a data-driven, risk-informed, performance-based approach to the life COPYRIGHT NOTICE This document has been authored by Consolidated Nuclear Security, LLC, under Contract DE NA 0001942 with the U.S. Department of Energy/National Nuclear Security Administration, or a subcontractor thereof. The United States Government retains and the publisher, by accepting the document for publication, acknowledges that the United States Government retains a nonexclusive, paid up, irrevocable, world-wide license to publish or reproduce the published form of this document, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, or allow others to do so, for United States Government purposes. Proceedings of the INMM & ESARDA Joint Virtual Annual Meeting August 23–26 & August 30–September 1, 2021 2 cycle management ","PeriodicalId":423282,"journal":{"name":"Institute of Nuclear Materials Management - August 21-26, 2021 - Virtual","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121853068","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}