{"title":"Project Closeout","authors":"C. Pritchard","doi":"10.1201/b12107-9","DOIUrl":"https://doi.org/10.1201/b12107-9","url":null,"abstract":"The team has come up with several technical recommendations which could help improve a related project in the future. These recommendations include inspection of timing conflicts, especially in relation to the OLED display, utilizing an I2C multiplexer for the joysticks, improving the 3D-printed enclosure, and developing a test for the latency of the system. These recommendations are discussed in detail in this section.","PeriodicalId":370141,"journal":{"name":"The Project Management Drill Book","volume":"47 24","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132949451","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}