{"title":"MCI through Aligning the Factory Lead Time and Cycle Time to Takt Time","authors":"Alin Posteucă","doi":"10.4324/9781351015752-11","DOIUrl":"https://doi.org/10.4324/9781351015752-11","url":null,"abstract":"","PeriodicalId":352510,"journal":{"name":"Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios","volume":"55 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129963302","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Let’s Start by Really Tackling Improvement of the Current Level of Manufacturing Profit through Productivity Improvement","authors":"Alin Posteucă","doi":"10.4324/9781351015752-2","DOIUrl":"https://doi.org/10.4324/9781351015752-2","url":null,"abstract":"","PeriodicalId":352510,"journal":{"name":"Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios","volume":"106 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115770484","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Annual Transformation Example through MCPD System: MCI with at Least 6% per Year for a PFC","authors":"Alin Posteucă","doi":"10.4324/9781351015752-5","DOIUrl":"https://doi.org/10.4324/9781351015752-5","url":null,"abstract":"","PeriodicalId":352510,"journal":{"name":"Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios","volume":"55 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126229444","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"MCI and Increasing Manufacturing Capacity through New Products and a New Equipment","authors":"Alin Posteucă","doi":"10.4324/9781351015752-8","DOIUrl":"https://doi.org/10.4324/9781351015752-8","url":null,"abstract":"","PeriodicalId":352510,"journal":{"name":"Manufacturing Cost Policy Deployment (MCPD) Profitability Scenarios","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2018-10-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124112290","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}