2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System最新文献

筛选
英文 中文
Integration of DG in MV-grids: Challenges encountered by the grid operator 光伏电网中DG的整合:电网运营商面临的挑战
E. Coster, D. van Houwelingen
{"title":"Integration of DG in MV-grids: Challenges encountered by the grid operator","authors":"E. Coster, D. van Houwelingen","doi":"10.1049/CP.2009.0510","DOIUrl":"https://doi.org/10.1049/CP.2009.0510","url":null,"abstract":"Due to economical and political trends, in the Netherlands the electricity produced by distributed generation units has increased significantly. From 2004 on in the Stedin area, three large greenhouse areas have been developed. In each greenhouse a CHP-plant is installed and as a DSO Stedin saw the number of new CHP-plant connections in its MV grid increasing. Legal rules oblige Stedin to connect CHP-plants in a much shorter time frame than normal project times for necessary grid extensions. This leads to a major grid planning problem, especially when a grid extension of the transmission grid is involved.","PeriodicalId":338532,"journal":{"name":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","volume":"37 31","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132835684","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 9
Dynamic line rating protection for wind farm connections 风电场连接的动态线路额定保护
T. Yip, C. An, G. Lloyd, M. Aten, B. Ferri
{"title":"Dynamic line rating protection for wind farm connections","authors":"T. Yip, C. An, G. Lloyd, M. Aten, B. Ferri","doi":"10.1049/CP.2009.0949","DOIUrl":"https://doi.org/10.1049/CP.2009.0949","url":null,"abstract":"This paper describes how dynamic line rating(DLR) is applied for load management and protection of a 132kV doublecircuit line between Skegness and Boston (North East of England) thereby enabling a larger penetration of wind generation. The rating of the line is calculated dynamically from local weather measurements to co-ordinate allowed generation automatically. As a back-up system, in case for some reason the wind farm power output is not reduced on command by the control system, a relay is available to initiate tripping of the wind generators. The paper also includes an analysis of the field data gathered from site which is used to verify the accuracy of the relay algorithm.","PeriodicalId":338532,"journal":{"name":"2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System","volume":"67 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2009-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115950670","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 78
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信