{"title":"Insulation coordination","authors":"S. Lambert","doi":"10.1002/9780470033678.ch21","DOIUrl":"https://doi.org/10.1002/9780470033678.ch21","url":null,"abstract":"","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"16 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125193620","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Back Matter","authors":"","doi":"10.1049/pbpo193e_bm","DOIUrl":"https://doi.org/10.1049/pbpo193e_bm","url":null,"abstract":"","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"3 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129665442","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Overhead line insulator","authors":"S. Chattopadhyay, Arabinda Das","doi":"10.1049/pbpo193e_ch5","DOIUrl":"https://doi.org/10.1049/pbpo193e_ch5","url":null,"abstract":"This chapter describes different aspects of overhead insulators. Properties of line insulators have been described. Materials used for manufacturing overhead line (OHL) insulators have been presented. Different types of insulators used in OHL application have been discussed. Requirement of string has been mentioned. Voltage distribution across different discs of string has been shown, and string efficiency has been derived. Design features of insulators for overhead application have been presented. Selection factors for insulator have been mentioned for transmission and distribution line applications. Fittings of insulator in OHLs have been described. Failure and testing of OHL insulator have been discussed. Different useful standards for this aspect have been referred.","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"63 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121058239","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Line support, foundation and mechanical sag","authors":"S. Chattopadhyay, Arabinda Das","doi":"10.1049/pbpo193e_ch3","DOIUrl":"https://doi.org/10.1049/pbpo193e_ch3","url":null,"abstract":"This chapter presents different aspects of line support, foundation and mechanical sag of transmission line. It starts with introduction and then describes the design aspects with respect to distribution system and then with respect to transmission system. Components of overhead lines have been described. Different types of line supports have been presented. Different feature of wooden pole, steel pole, concrete pole and lattice tower have been presented. Foundation methods have been presented for different line support. Classification of foundation has been made. Different types of monoblock and compact foundations have been presented. Tests for supports have been highlighted. Mechanical sag with tension for overhead lines has been presented. Effects of ice and wind on sag have been described.","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":" 735","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"131978235","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Route selection, commissioning, operation and maintenance","authors":"S. Chattopadhyay, Arabinda Das","doi":"10.1049/pbpo193e_ch10","DOIUrl":"https://doi.org/10.1049/pbpo193e_ch10","url":null,"abstract":"This chapter deals with route selection, commissioning, operation and maintenance of overhead power transmission lines. It starts with route selection followed by general considerations of understanding of purpose, resource and objective, covered area, geographical and geological diversity, political map, climatic statistics, cost study, etc. Different aspects of establishing new lines, alternate lines, lines conversion have been discussed. Linking with underground lines has been discussed. Different aspects of planning and construction like survey, planning, design, foundation, installation, erection, commissioning, responsibility and issues, check-up, test, energization, etc. have been discussed. Supervision and quality assurance in commissioning and commencement of operation have been discussed thoroughly. Operation and maintenance, post-commissioning planning and management, operation management, maintenance management, asset management, risk management have been discussed followed by uprating, upgrading and extension of line.","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"21 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114908531","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Lightning and surge protection","authors":"S. Chattopadhyay, Arabinda Das","doi":"10.1049/pbpo193e_ch8","DOIUrl":"https://doi.org/10.1049/pbpo193e_ch8","url":null,"abstract":"Lightning protection practices followed in overhead lines. Overhead lines are exposed to open air and therefore, they are subject to over-voltages due to both external and internal causes. Lightning is the main cause of the occurrence of overvoltage in overhead lines. Different types of transients are experienced by overhead lines. Transients faced by lines may be divided into two following broad categories: 1. DC transients 2. AC transients. Lightning is unidirectional voltage waveform of very high peak. Both direct and indirect lightning strokes have severe adverse effect on transmission lines. It can cause breaking of insulators, lines and other members hampering the service of the electric power system. Thyrite-type lightning arrester is used for diverting very high voltages. Multiple numbers of disc separated by gap are placed in stack and enclosed in porcelain container. Gap reduces flow of current at normal condition. Surge absorber absorbs energy from travelling waves and reduces their high ampli-tude. The capacitor-based voltage transformer is used for measurement of high voltage. Dissipation factor is the measure of dielectric strength of insulating medium. Dissipation factor is measured using bridge circuit. Schering bridge is commonly used for measurement of dissipation factor. Lightning has been protected by earth wires while other overvoltages are protected by surge arresters, surge absorber and other protective devices.","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"111 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124882728","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Transmission line fundamentals","authors":"S. Chattopadhyay, Arabinda Das","doi":"10.1049/pbpo193e_ch2","DOIUrl":"https://doi.org/10.1049/pbpo193e_ch2","url":null,"abstract":"This chapter describes fundamentals of electric power lines. Different line parameters are presented. Resistance, inductance and capacitance have been derived. Skin effect and proximity effect have been described. Based on line parameters, classification of power line has been done followed by modelling of different parts of power system. A two-port network model of transmission lines has been presented. Transmission parameters, characteristics impedance, image impedance, surge impedance loading, etc. have been presented. Useful parameters of wave propagation have been shown. Comparison of AC overhead lines with DC lines and underground lines has been made. Modelling of synchronous generator and transformer has also been presented. Voltage regulation has been discussed with respect to transmission system. Different useful voltage compensation methods have been described.","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133392706","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Earthing and earth wire","authors":"S. Chattopadhyay, Arabinda Das","doi":"10.1049/pbpo193e_ch7","DOIUrl":"https://doi.org/10.1049/pbpo193e_ch7","url":null,"abstract":"This chapter deals with earthing and earth wire used in overhead electric lines. Effect of electric current on human body has been mentioned. Resistance properties of soil have been described. Measurement techniques for earth resistance have been presented. Different earthing procedures and materials suitable for earthing have been presented. Limitation of ungrounded system and advantages of earthed system have been presented. Different types of system grounding have been presented. Fault current for different earthing systems have been described. Harmonic suppression system (HSS) and earthing transformer have been described. Common grounding practices have been mentioned. Different properties of earth wire and its selection guidelines have been presented. Design features of earth wires have been included. Practices for tower earthing have been described. Earthing for personal safety has also been described. Pipe earthing, counterpoise earthing, grounding in pole support, earthing of guard wire, etc. have been described.","PeriodicalId":278644,"journal":{"name":"Overhead Electric Power Lines: Theory and practice","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"132634698","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}