International Journal of Industrialized Construction最新文献

筛选
英文 中文
Using 3D Scanning for Accurate Estimation of Termination Points for Dimensional Quality Assurance in Pipe Spool Fabrication 利用三维扫描技术精确估计管道线轴加工的终止点,以保证尺寸质量
International Journal of Industrialized Construction Pub Date : 2021-10-04 DOI: 10.29173/ijic253
Mahdi Sharif, C. Rausch, Sidy Ndiongue, Carl Haas, S. Walbridge
{"title":"Using 3D Scanning for Accurate Estimation of Termination Points for Dimensional Quality Assurance in Pipe Spool Fabrication","authors":"Mahdi Sharif, C. Rausch, Sidy Ndiongue, Carl Haas, S. Walbridge","doi":"10.29173/ijic253","DOIUrl":"https://doi.org/10.29173/ijic253","url":null,"abstract":"Increased prefabrication and modularization have resulted in fabrication shops producing more complex assemblies with tighter tolerances. Most measurements in fabrication shops are still done using manual tools that are not accurate enough for engineering tolerance specifications, which can lead to rework. Three dimensional (3D) scanning and measurement systems can provide increased accuracy and digital integration capabilities, however they do not sufficiently support fast and accurate dimensional quality assurance (DQA) of pipe spool fabrication. This is because no dimensional quality assurance methods to date have focused solely on termination points for pipe spool assemblies. In the present article, a new scan-vs-BIM method is developed to accurately estimate termination points for 3D scanned cylindrical assemblies. This method relies on statistically fitting circular features at termination points and thus eliminating conventional issues with target placement for laser trackers and measurement readings for tape measures. The method is tested in an industrial-scale experiment, where 30 pipe spool assemblies were fabricated, and more than 400 quality control steps completed. The accuracy of termination point detection was benchmarked against results from a laser tracker and compared against commercial scan-to-BIM software. Results show that the developed method has an average accuracy of 1.01 mm and is significantly better than the scan-to-BIM software with an average accuracy of 4.75 mm.","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"11 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124183411","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Overview of the Characteristics of the Modular Industry and Barriers to its Increased Market Share 概述模块化产业的特点及其增加市场份额的障碍
International Journal of Industrialized Construction Pub Date : 2021-07-30 DOI: 10.29173/ijic249
Tarek Salama, O. Moselhi, M. Al-Hussein
{"title":"Overview of the Characteristics of the Modular Industry and Barriers to its Increased Market Share","authors":"Tarek Salama, O. Moselhi, M. Al-Hussein","doi":"10.29173/ijic249","DOIUrl":"https://doi.org/10.29173/ijic249","url":null,"abstract":"Modular and offsite construction approaches reduce project duration and cost by synchronizing offsite and onsite work. Project activities are undertaken in a controlled offsite facility to minimize the effects of inclement weather and site disruptions, while meeting safety and quality requirements. To study the characteristics of modular and offsite construction, questionnaires have been conducted during the last decade by many organizations, including the Modular Building Institute (MBI), the Buildoffsite campaigning organization in the United Kingdom, the Canadian Manufactured Housing Institute, the National Institute of Building Sciences, McGraw-Hill Construction, and the Fails Management Institute. This paper introduces comprehensive analysis of the results of a questionnaire survey carried out in collaboration between members of the Department of Building, Civil & Environmental Engineering at Concordia University, the Modular Building Institute, NRB Inc., and the Department of Civil & Environmental Engineering at the University of Alberta. The questionnaire focuses on two issues: (1) the characteristics of the modular and offsite construction industry, and (2) the barriers against increased market share in this industry. For the latter, an effort was made to address a set of five factors identified in a workshop on the topic of challenges and opportunities for modular construction in Canada held in Montréal in 2015 to analyze barriers to growth of modular construction in the Canadian context. Key findings of this survey include requests for use of a separate building code for modular construction design, innovative financing and insurance solutions, standards that consider procurement regulations, and for financial institutions to create lending programs suited for modular construction.","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"134 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125475867","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 3
Construction stakeholders’ perceived benefits and barriers for environment-friendly modular construction in a hospitality centric environment 在以酒店为中心的环境中,建筑利益相关者对环境友好型模块化建筑的感知利益和障碍
International Journal of Industrialized Construction Pub Date : 2021-07-30 DOI: 10.29173/ijic252
S. Paliwal, Jin Ouk Choi, James Bristow, Hyun Kyung Chatfield, Seungtaek Lee
{"title":"Construction stakeholders’ perceived benefits and barriers for environment-friendly modular construction in a hospitality centric environment","authors":"S. Paliwal, Jin Ouk Choi, James Bristow, Hyun Kyung Chatfield, Seungtaek Lee","doi":"10.29173/ijic252","DOIUrl":"https://doi.org/10.29173/ijic252","url":null,"abstract":"Modular construction techniques can not only significantly contribute to improved project cost, schedule, and quality performance, but also sustainability by reducing site disruption and waste generated, creating better relocatability and reusability. However, there are still difficulties in developing and implementing modularization in a hospitality centric environment. Thus, the primary goal of this research is to identify the opportunities and challenges of implementing sustainable modular construction techniques in a hospitality-centric environment. In this study, the approach includes the formulation of a survey, which was distributed to 600 industry professionals in Las Vegas and completed by 63 industry professionals, followed by three personal interviews. The results showed that: 1) 85% percent of survey participants expected an improvement in schedule, and 65% of that elected to use a form of modularization actually experienced an improved schedule; 2) 62% of the participants claimed that they would keep using modular methods in the next 12 months, whereas 44% of the participants claimed they would increase their use of modularization in the next five years; 3) two of the top five expected benefits achieved included less site disruption (noise/traffic and dust) and reduced waste, which contribute towards sustainable construction; 4) transportation/logistics was selected by industry professionals as a key barrier in the implementation of modular construction; 5) to implement more sustainable construction, practitioners require additional research to improve and overcome the key barrier of transportation/logistics; 6) if construction professionals gain more modular project experience, their perceived benefits and barriers could increase and decrease, respectively. The results from this research provide valuable insights for implementing sustainable modular methods in hospitality-centric environments.","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128474807","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case 4D BIM进度与沉浸式虚拟现实在模块化项目中的结合应用:UNLV太阳能十项全能案例
International Journal of Industrialized Construction Pub Date : 2021-01-22 DOI: 10.29173/IJIC236
Rajarshi Ghimire, Seungtaek Lee, Jin Ouk Choi, Jin-Yeol Lee, Yong-Cheol Lee
{"title":"Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case","authors":"Rajarshi Ghimire, Seungtaek Lee, Jin Ouk Choi, Jin-Yeol Lee, Yong-Cheol Lee","doi":"10.29173/IJIC236","DOIUrl":"https://doi.org/10.29173/IJIC236","url":null,"abstract":"The use of a 4D schedule as technological advancement has brought significant improvement to the planning and execution of construction projects, through visualizing step-wise construction progress, following a sequence of pre-planned activities, and finalizing a baseline schedule with necessary changes. Moreover, the application of immersive virtual reality (IVR) to create an interactive 4D BIM schedule of a planned structure has made it possible to create a detailed plan of any construction project. Because of these benefits, the use of 4D schedules and immersive virtual reality in the construction industry has increased, leading to improved planning and execution. However, past studies have given little attention to the applications of such technologies on modular projects. Thus, this research applied a 4D schedule, along with immersive virtual reality, on a modular project, and verified their benefits and effectiveness. The results showed that most of the participants who experienced a 4D BIM schedule, along with immersive virtual reality (4D/IVR), strongly agreed that it is an easy and straightforward way to visualize the project, understand the schedule, and find any errors. Moreover, while fewer than half of the participants scheduled the assembly sequence correctly with conventional schedule and 2D drawings, almost all of them sequenced the assembly successfully with 4D/IVR. Based on the findings, this research concludes that the implementation of a 4D BIM schedule, along with virtual reality technology, can enhance the fabrication and assembly performance of modules.","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2021-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"130883711","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 4
Integrating machine learning with QFD for selecting functional requirements in construction automation 将机器学习与QFD相结合,选择建筑自动化中的功能需求
International Journal of Industrialized Construction Pub Date : 2020-12-10 DOI: 10.29173/IJIC235
E. Tamayo, Yasir Imtiaz Khan, M. Al-Hussein, A. Qureshi
{"title":"Integrating machine learning with QFD for selecting functional requirements in construction automation","authors":"E. Tamayo, Yasir Imtiaz Khan, M. Al-Hussein, A. Qureshi","doi":"10.29173/IJIC235","DOIUrl":"https://doi.org/10.29173/IJIC235","url":null,"abstract":"An important aspect of the conceptual design is at the customer requirement definition stage, where an optimal number of functional requirements are specified with the application of quality function deployment. To facilitate a systematic specification of functional requirements, state-of-the-art unsupervised machine learning techniques will be introduced in the feature selection of functional requirements. However, the scarcity of references on unsupervised feature selection in the literature reflects the difficulty associated with this topic. At the customer requirement definition phase, three techniques will be proposed for selecting functional requirements, namely: (a) principal component analysis, (b) forward orthogonal search, and (c) Kohonen self-organizing map neural network. These machine learning feature selection techniques address the limitations of current approaches in systematically determining the minimum functional requirements from the mapping of customer requirements in quality function deployment. When applied to the conceptual design of the transportable automated wood wall framing machine that is under development at the University of Alberta, the proposed feature selection techniques have been observed to be: (i) fast, (ii) amenable to small quality function deployment dataset, and (iii) adequate in realizing design objectives. The results presented in this paper can be easily extended to online determination of customer requirements and functional requirements, project management, contract management, and marketing.","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"373 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133509886","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Feasibility and Implications of the Modular Construction Approach for Rapid Post-Disaster Recovery 模块化建设方法在灾后快速恢复中的可行性和意义
International Journal of Industrialized Construction Pub Date : 2020-08-20 DOI: 10.29173/ijic220
Pedram Ghannad, Yong-Cheol Lee, Jin Ouk Choi
{"title":"Feasibility and Implications of the Modular Construction Approach for Rapid Post-Disaster Recovery","authors":"Pedram Ghannad, Yong-Cheol Lee, Jin Ouk Choi","doi":"10.29173/ijic220","DOIUrl":"https://doi.org/10.29173/ijic220","url":null,"abstract":"The adverse social and financial impacts of catastrophic disasters are increasing as population centers grow. In recent years, destroying homes and infrastructures has resulted in a major loss of life and created countless refugees. For example, Hurricane Katrina in August 2005 damaged over 214,700 homes in New Orleans and forced over 800,000 citizens to live outside of their homes due to flooding. After disastrous events, the government agencies have to respond to post-disaster housing issues quickly and efficiently and provide sufficient resources for temporary housing for short-term disaster relief and reconstruction of destroyed and damaged housing for full rehabilitation. Modular construction is a promising solution for improving the process of post-disaster housing reconstruction because of its inherent characteristic of time-efficiency. This study aimed to evaluate the potentials and feasibility of the prefabricated/modular construction approach that can be adapted to facilitate the post-disaster recovery process. An extensive literature review has been carried out to identify the features of modular construction, which can add value to the post-disaster recovery process. To investigate the suitability and practicability of implementing modular construction for post-disaster reconstruction and to identify major barriers of its implementation, a survey has been conducted among Architecture, Engineering, and Construction (AEC) experts who have experience in prefabrication/modularization, and/or involved in post-disaster reconstruction projects. The results of the study indicate that prefabricated/modular construction is a promising approach to improve time-efficiency of post-disaster reconstruction and tackle challenges of current practices by its unique benefits such as reduced demand for on-site labor (overcome local labor pool constraints impacted by the disaster) and resources (overcome the shortage of equipment and materials), shorter schedule (due to concurrent & non-seasonal), reduced site congestion, and improved labor productivity (due to assembly line-like and controlled environment).","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"23 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126598653","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Development of Automated Top-Down Construction System for Low-rise Building Structures 低层建筑结构自上而下自动化施工系统的开发
International Journal of Industrialized Construction Pub Date : 2020-07-14 DOI: 10.29173/ijic217
Aparna Harichandran, B. Raphael, Abhijit Mukherjee
{"title":"Development of Automated Top-Down Construction System for Low-rise Building Structures","authors":"Aparna Harichandran, B. Raphael, Abhijit Mukherjee","doi":"10.29173/ijic217","DOIUrl":"https://doi.org/10.29173/ijic217","url":null,"abstract":"Automation is the best solution for achieving high productivity and quality in the construction industry at reduced cost and time. The main objective of this study is to develop an economical automated construction system (ACS) for low-rise buildings. The incremental development of the construction system and the structural system through different versions of laboratory prototypes are described in this paper. These ACS prototypes adopt a top-down construction method. This method involves the building of the structural system step by step from the top floor to the bottom floor by connecting and lifting structural modules. ACS prototype 1 consist of wooden structural modules and electric motor system. ACS prototype 2 has a highly automated custom designed hydraulic motor system to construct steel structural frame. ACS prototype 3 is a partially automated system where the steel structural modules are connected manually. These prototypes were evaluated on the basis of function, cost and efficiency of operations. Based on overall performance, ACS prototype 3 is identified as the best economical option for the construction of low-rise buildings. When the speed of construction is more important than cost, the ACS prototype 2 is the apt solution. This paper describes the challenges in developing an ACS and the criteria to evaluate its performance. It also includes a preliminary framework for the development of an automated construction monitoring system and its experimental evaluation. This machine learning-based framework is to identify the operations of ACS from sensor measurements using Support Vector Machines. Most of the operations are identified reasonably well and the best identification accuracy is 96%. The future studies are focusing on to improve the accuracy of operation identification, further development of the monitoring system and the ACS for actual implementation in construction sites.","PeriodicalId":277686,"journal":{"name":"International Journal of Industrialized Construction","volume":"32 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122613705","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书