Positive About Inspection最新文献

筛选
英文 中文
Using the outcomes of inspection 使用检查的结果
Positive About Inspection Pub Date : 2019-01-15 DOI: 10.4324/9781315191973-5
Mike Tilling, P. Nash
{"title":"Using the outcomes of inspection","authors":"Mike Tilling, P. Nash","doi":"10.4324/9781315191973-5","DOIUrl":"https://doi.org/10.4324/9781315191973-5","url":null,"abstract":"","PeriodicalId":274778,"journal":{"name":"Positive About Inspection","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"126241815","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The role of the nominee 被提名人的角色
Positive About Inspection Pub Date : 2019-01-15 DOI: 10.4324/9781315191973-3
Mike Tilling, P. Nash
{"title":"The role of the nominee","authors":"Mike Tilling, P. Nash","doi":"10.4324/9781315191973-3","DOIUrl":"https://doi.org/10.4324/9781315191973-3","url":null,"abstract":"","PeriodicalId":274778,"journal":{"name":"Positive About Inspection","volume":"54 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123803255","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
The inspection experience 检验经验
Positive About Inspection Pub Date : 2019-01-15 DOI: 10.4324/9781315191973-4
Mike Tilling, P. Nash
{"title":"The inspection experience","authors":"Mike Tilling, P. Nash","doi":"10.4324/9781315191973-4","DOIUrl":"https://doi.org/10.4324/9781315191973-4","url":null,"abstract":"","PeriodicalId":274778,"journal":{"name":"Positive About Inspection","volume":"103 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114243773","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Preparing for inspection 准备检查
Positive About Inspection Pub Date : 2019-01-15 DOI: 10.4324/9781315191973-2
Mike Tilling, P. Nash
{"title":"Preparing for inspection","authors":"Mike Tilling, P. Nash","doi":"10.4324/9781315191973-2","DOIUrl":"https://doi.org/10.4324/9781315191973-2","url":null,"abstract":"","PeriodicalId":274778,"journal":{"name":"Positive About Inspection","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2019-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"125973853","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信