{"title":"Definition","authors":"D. Lock","doi":"10.1201/9781003073314-2","DOIUrl":"https://doi.org/10.1201/9781003073314-2","url":null,"abstract":"7Q10 Definition: Seven-day, consecutive low flow with a ten year return frequency; the lowest stream flow for seven consecutive days that would be expected to occur once in ten years. A-Scale Sound Level Definition: A measurement of sound approximating the sensitivity of the human ear, used to note the intensity or annoyance level of sounds. Abandoned Well Definition: A well whose use has been permanently discontinued or which is in a state of such disrepair that it cannot be used for its intended purpose. Abatement Definition: Reducing the degree or intensity of, or eliminating, pollution. Abatement Debris Definition: Waste from remediation activities. Absorbed Dose Definition: In exposure assessment, the amount of a substance that penetrates an exposed organism's absorption barriers (e.g. skin, lung tissue, gastrointestinal tract) through physical or biological processes. The term is synonymous with internal dose. Absorption Definition: The uptake of water , other fluids, or dissolved chemicals by a cell or an organism (as tree roots absorb dissolved nutrients in soil). Absorption Barrier","PeriodicalId":205388,"journal":{"name":"The Essentials of Project Management","volume":"83 1-2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133845823","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Cost estimating","authors":"D. Lock","doi":"10.4324/9781315204017-5","DOIUrl":"https://doi.org/10.4324/9781315204017-5","url":null,"abstract":"Project underestimation of resources and costs is one of the most common contributors to project failure. As such, project managers should be knowledgeable of and consider the various industry techniques and tools in the definition and execution of project cost estimation. As defined by the Project Management Body of Knowledge (PMBOK), cost estimation is the iterative process of developing an approximation of the monetary resources needed to complete project activities. Project teams should estimate costs for all resources that will be charged to the project. This includes but is not limited to: • Labor • Materials • Equipment • Services • Software • Hardware • Facilities • Contingency Costs The following list includes common tools and techniques used in project cost estimation: • Expert Judgment – use of knowledge gained from past project management experience. Expert judgment, in conjunction with objective estimation techniques, provides valuable information about the organizational environment and information from prior comparable projects. • Analogous Estimating – use of the metrics from a previous, similar project as the basis of estimation for the current project. Analogous estimating takes the actual cost of previous, similar projects as a baseline and then adjusts for known differences (such as size, complexity, scope, duration, etc.). • Parametric Estimating – use of a statistical relationship between historical data and other variables (for example, lines of code in software development) to calculate an estimate for activity parameters, such as scope, cost, budget, and duration. Used correctly, this technique can produce high levels of accuracy. • Bottom-Up Estimating – estimating all individual work packages/activities with the greatest level of detail, summarizing higher-level estimates with the combination of the individual estimates. The accuracy of bottom-up estimating is optimized when individual work packages/activities are defined in detail. • Three-Point Estimates – use of three estimates to determine a range for an activity's cost: the best-case estimate, the most likely estimate, and the worst-case estimate. • Reserve Analysis – determination of contingency reserves to account for cost uncertainty. • Project Management Estimating Software – use of project management cost estimating software applications, computerized spreadsheets, simulation, and statistical tools. Such tools can allow for rapid consideration of multiple cost estimate alternatives. • Vendor Bid Analysis – determination of what the project should cost based on a review of vendor bids/proposals. This technique may be used in conjunction with other cost estimation techniques to ensure that cost estimates are …","PeriodicalId":205388,"journal":{"name":"The Essentials of Project Management","volume":"424 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127461984","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}