{"title":"Contract management","authors":"E. Eggink","doi":"10.4324/9781003026372-12","DOIUrl":"https://doi.org/10.4324/9781003026372-12","url":null,"abstract":"","PeriodicalId":167441,"journal":{"name":"A Practical Guide to Engineering, Procurement and Construction Contracts","volume":"91 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114223017","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Delays","authors":"E. Eggink","doi":"10.1002/9781118838167.ch13","DOIUrl":"https://doi.org/10.1002/9781118838167.ch13","url":null,"abstract":"","PeriodicalId":167441,"journal":{"name":"A Practical Guide to Engineering, Procurement and Construction Contracts","volume":"1 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129692592","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Construction","authors":"E. Eggink","doi":"10.4324/9781003026372-7","DOIUrl":"https://doi.org/10.4324/9781003026372-7","url":null,"abstract":"I write on behalf of the San Francisco Electrical Contractors Association (SFECA), a chapter of the National Electrical Contractors Association (NECA). The SFECA represents over 100 electrical contracting firms employing over 3,000 electrical workers in San Francisco. We believe it is important to encourage the California Electrical Commission to adopt an \"all-electric\" construction requirement for 2022 Energy Code, Title 24, Part 6 for residential and commercial buildings.","PeriodicalId":167441,"journal":{"name":"A Practical Guide to Engineering, Procurement and Construction Contracts","volume":"121 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-02-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122012398","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}