{"title":"Performance Assessment of Wheat Flour Suppliers Based on Balanced Scorecard (BSC)","authors":"Jakfat Haekal","doi":"10.54756/ijsar.2023.v3.2.3","DOIUrl":"https://doi.org/10.54756/ijsar.2023.v3.2.3","url":null,"abstract":"Company Xis one of the companies in Indonesia that produces seasoned flour. This seasoned flour product uses the main raw material in the form of wheat flour. Company Xhas 3 suppliers of wheat flour raw materials used. In the process, there are problems with these suppliers in supplying wheat flour, including delays in the fulfillment of raw materials, the amount of raw materials sent does not match the demand, causing disruption to the production process, so Company Xneeds to evaluate suppliers of wheat flour to choose suppliers who the best that can be used so as not to interfere with the production process. In evaluating the performance of this supplier, the method used is the Balanced Scorecard in determining the criteria for supplier measurement indicators based on a financial perspective, a customer perspective, an internal business process perspective and a learning and growth perspective. This study aims to obtain the best supplier of wheat flour raw materials. Based on the results of the study, it shows that the best wheat flour supplier performance is the UPS supplier with a value of 148.09 meaning the company is satisfied with the UPS supplier performance because it is in the 80-160 value range so that it can be used as the main supplier in supplying wheatflour, then the ACL supplier. which gets a value of 151.37 which means that the company is also satisfied with the performance of the ACL supplier so that it can be used as a backup supplier","PeriodicalId":143211,"journal":{"name":"The International Journal of Scientific and Academic Research","volume":"119 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123383161","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Implementation of Lean Manufacturing to Reduce Hold Types of Mission Case Products using DMAIC and KAIZEN Approach","authors":"M. Kholil","doi":"10.54756/ijsar.2023.v3.2.4","DOIUrl":"https://doi.org/10.54756/ijsar.2023.v3.2.4","url":null,"abstract":"Company in this research is a manufacturing company engaged in the automotive industry that produces transmissions for four-wheeled vehicles. This research was conducted at the ALMC department which specializes in producing Mission Cases. In carrying out this Mission Case production activity, it is still found that there are Hold defects or pending parts because the quality does not meet the requirements to be flowed in the assembly process. The types of defects are kizu (berets), dakon (dented due to impact) and atsukon (dented due to scrap.) As a result, the company has to incur additional costs to repair the part (overprocess)so that it can be transferred to the assembly process. The purpose of this research is to minimize the Hold defects by implementing lean manufacturing through DMAIC and KAIZEN approaches. The identification of waste in the production line is carried out using value stream mapping tools and the Hold defect problem analysis stage is solved using DMAIC tools. The results of this study are expected to minimize smallpox hold with the implementation of lean manufacturing","PeriodicalId":143211,"journal":{"name":"The International Journal of Scientific and Academic Research","volume":"28 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"127225340","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Lean Manufacturing Analysis to Reduce Delaysin the Inflight Entertainment Service before Departure Check-in Process","authors":"M. Kholil","doi":"10.54756/ijsar.2023.v3.2.3.2","DOIUrl":"https://doi.org/10.54756/ijsar.2023.v3.2.3.2","url":null,"abstract":"","PeriodicalId":143211,"journal":{"name":"The International Journal of Scientific and Academic Research","volume":"58 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"121611381","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}