{"title":"Reducing Handoffs Between Sequential Trades: A Simulation","authors":"Meng Yaw, Zofia K. Rybkowski, H. D. Jeong","doi":"10.24928/2020/0028","DOIUrl":"https://doi.org/10.24928/2020/0028","url":null,"abstract":"Trade specialization has created a significant number of handoffs on construction sites. Without proactive management from the general contractor, handoffs can result in the generation of waste, such as idle time between production activities, transport waste originating from an excessive number of mobilizations and demobilizations, and errors and omissions from miscommunication between trades. These interruptions can severely disrupt the workflow of a project. While small batching of activities offers opportunities for scheduling to takt time, a tension potentially exists between the desire for small batches and the benefits of reduced handoffs that accompany grouping of activities. This paper discusses the development of a lean simulation that explores the advantages of reducing the number of handoffs on a construction project while still acknowledging the benefits of small batching. A first run study of the simulation game was conducted on a sample of 30 students. Metrics showed all teams experienced a significant reduction in the number of turns to complete a round when several sequential tasks were grouped together. On site, this result may be achieved by employing a multi-skilled crew, sharing information more fully through Integrated Project Delivery (IPD), or by selective prefabrication. While feedback was positive, further work is needed to strengthen the game’s learning outcomes.","PeriodicalId":105541,"journal":{"name":"Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"97 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"114591316","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Implementation of Last Planner® System in an Infrastructure Project","authors":"Omar Kassab, Brendan Young, O. Lædre","doi":"10.24928/2020/0089","DOIUrl":"https://doi.org/10.24928/2020/0089","url":null,"abstract":"Since the establishment of the Last Planner® system (LPS) by Ballard and Howell, multiple studies have been conducted to evaluate the implementation of LPS in many construction projects. However, few studies have recorded the implementation process in infrastructure projects. This study investigates the implementation of LPS in an infrastructure project (Minnevika Bridge project), detect the challenges that arise during the implementation, and suggest measures to overcome these challenges. Several data collection methods were used in an action research approach; namely, a single case study, a literature study, non-participant/participant observations, six semi-structured interviews and two surveys. The study revealed that the project followed the best practice process map for LPS implementation mentioned in the literature. Moreover, the project experienced challenges described in the literature that tend to arise when adopting LPS, similar to those reported from other construction projects (e.g. participants’ resistance to the system). The study concludes with suggested measures to overcome these challenges (e.g. sufficient training and openness towards the LPS). Finally, the researchers represent challenges that are not clearly described in the literature (e.g., fear of responsibility when making the commitments).","PeriodicalId":105541,"journal":{"name":"Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123876763","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
{"title":"Applying Heat Maps to Define Workspace in Construction Based on Real-Time Tracking System With Coordinate Positioning Information","authors":"Jianyu Zhao, O. Seppänen, A. Peltokorpi","doi":"10.24928/2020/0014","DOIUrl":"https://doi.org/10.24928/2020/0014","url":null,"abstract":"The construction jobsites are regarded as highly dynamic and chaotic environment for both workers and management. To ensure efficient task performances, workspace is a key resource in construction sites. Nowadays the technology has enabled better management of onsite resources through location-based methods within lean construction principles, such as Location-Based Management System (LBMS) and Takt planning. Those methods aim to optimize workspace in construction sites consisting of multiple tasks and to eliminate waste related to product and labour flows. To contribute to enhancing those lean construction approaches with attempts to obtain real and objective data, we have developed a real-time positioning system based on Bluetooth Low Energy (BLE) technology where coordinates of workers can be obtained, and heat maps of task-related workspace are generated in real time. This paper aims to develop automated process of generation of workspace based on coordinates of workers and to explore various uses of workspace heat maps to serve the purposes of lean construction principles. The successful implementation of the system in China is analysed and the results suggest that heat maps which use dimensional and temporal positioning data, could be an efficient and convenient method to define workspace of crews onsite.","PeriodicalId":105541,"journal":{"name":"Proc. 28th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"2020-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"133055088","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}