International Conference on Smart Infrastructure and Construction 2019 (ICSIC)最新文献

筛选
英文 中文
Automated Drilling for Installations Inside the Crossrail Tunnels 横贯铁路隧道内装置的自动钻孔
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.241
J. Douglas, T. Kelly, S. Jain
{"title":"Automated Drilling for Installations Inside the Crossrail Tunnels","authors":"J. Douglas, T. Kelly, S. Jain","doi":"10.1680/ICSIC.64669.241","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.241","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"88 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123107392","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Exploring the Impact of Sap Version 10 on the UK Construction Industry 探讨Sap Version 10对英国建筑业的影响
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.315
E. Skoufoglou, F. Hagan
{"title":"Exploring the Impact of Sap Version 10 on the UK Construction Industry","authors":"E. Skoufoglou, F. Hagan","doi":"10.1680/ICSIC.64669.315","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.315","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"129610279","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 0
Effective use of Offsite Manufacturing for Public Infrastructure Projects in Australia 在澳大利亚公共基础设施项目中有效利用非现场制造
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.267
D. Gunawardena, P. Mendis, D. Ngo, B. Rismanchi, L. Aye
{"title":"Effective use of Offsite Manufacturing for Public Infrastructure Projects in Australia","authors":"D. Gunawardena, P. Mendis, D. Ngo, B. Rismanchi, L. Aye","doi":"10.1680/ICSIC.64669.267","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.267","url":null,"abstract":"Prefabrication and offsite manufacturing have featured in various forms in an in-situ based construction industry for many decades. Scarcity of both human and material resources is challenging the future of traditional construction practices. Due to its many benefits such as speed of project delivery, minimum work on site, minimised construction waste and higher quality assurance, offsite manufacturing is gradually evolving into an essential technology in the construction industry. As a result of re-cent government initiatives, Australia is seeing a considerable increase in the use of offsite manufacturing and prefabricated modular technologies in delivering public infrastructure projects such as schools, healthcare facilities, and public transport facilities. Such projects are ably supported by academic research collaborating with the industry to ensure that the outcomes keep improving to achieve the highest quality and functionality. This paper discusses how multidisciplinary research addresses issues such as structural performance, construction technology, design for manufacturing and assembly and indoor environ-mental quality for the delivery of such public infrastructure projects. These projects have set an example in how offsite manufacturing supported by academic research can be beneficial for effectively delivering the greater good to the society.","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"205 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116706139","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
A Proposed Approach Integrating DLT, BIM, IoT and Smart Contracts: Demonstration Using a Simulated Installation Task 集成DLT, BIM, IoT和智能合约的建议方法:使用模拟安装任务进行演示
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.275
J. Li, M. Kassem, A. Ciribini, M. Bolpagni
{"title":"A Proposed Approach Integrating DLT, BIM, IoT and Smart Contracts: Demonstration Using a Simulated Installation Task","authors":"J. Li, M. Kassem, A. Ciribini, M. Bolpagni","doi":"10.1680/ICSIC.64669.275","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.275","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115995067","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 39
Process Centric Building Energy Management-As-A-Service 以流程为中心的建筑能源管理即服务
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.011
A. Chassiakos, S. Karatzas
{"title":"Process Centric Building Energy Management-As-A-Service","authors":"A. Chassiakos, S. Karatzas","doi":"10.1680/ICSIC.64669.011","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.011","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"123487458","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 1
Pavement Instrumentation for Condition Assessment Using Efficient Sensing Solutions 路面仪表状况评估使用高效传感解决方案
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.471
N. Bahrani, J. Blanc, P. Hornych, F. Menant
{"title":"Pavement Instrumentation for Condition Assessment Using Efficient Sensing Solutions","authors":"N. Bahrani, J. Blanc, P. Hornych, F. Menant","doi":"10.1680/ICSIC.64669.471","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.471","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"122625658","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 6
Agent-Based Model (ABM) for City-Scale Traffic Simulation: A Case Study on San Francisco 基于agent的城市尺度交通模拟模型——以旧金山为例
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/icsic.64669.203
Bingyu Zhao, K. Kumar, Gerard Casey, K. Soga
{"title":"Agent-Based Model (ABM) for City-Scale Traffic Simulation: A Case Study on San Francisco","authors":"Bingyu Zhao, K. Kumar, Gerard Casey, K. Soga","doi":"10.1680/icsic.64669.203","DOIUrl":"https://doi.org/10.1680/icsic.64669.203","url":null,"abstract":"Agent-Based Model (ABM) is a promising tool for city-scale traffic simulation to understand the complex behaviour of the entire urban transportation system under different scenarios. In the ABM, traffic is intuitively simulated as movements and interactions between large numbers of agents, each capable of finding the route for an individual traveller or vehicle. This paper presents such an ABM development to reproduce the traffic patterns of the city of San Francisco. The model features a detailed road network and hour-long simulation time step to capture realistic variations in traffic conditions. Agent speed is determined according to a simplified volume-delay macroscopic relationship, which is more efficient than applying microscopic rules (e.g., car following) for evaluating city-scale traffic conditions. Two particular challenges of building such an ABM are addressed in this paper: data availability and computational cost. The key inputs to the ABM are sourced from standard and publicly available datasets, including the travel demand surveys published by local transport authorities and the road network data from the OpenStreetMap. In addition, an efficient priority-queue based Dijkstra algorithm is implemented to overcome the computational bottleneck of agent routing. The ABM is designed to run on High Performance Computing (HPC) clusters, thereby improving the computational speed significantly. Preliminary validation of the ABM is conducted by comparing its results with a published model. Overall, the ABM has been demonstrated to run efficiently and produce reliable results.","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"115306971","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 12
Monitoring the Axial Shortening of Principal Tower Using Embedded Distributed Fibre Optic Sensors 利用嵌入式分布式光纤传感器监测主塔轴向缩短
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.233
N. Battista, Cedric Kechavarzi, N. Cheal, R. Harvey, S. Wong
{"title":"Monitoring the Axial Shortening of Principal Tower Using Embedded Distributed Fibre Optic Sensors","authors":"N. Battista, Cedric Kechavarzi, N. Cheal, R. Harvey, S. Wong","doi":"10.1680/ICSIC.64669.233","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.233","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"88 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"116441113","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 5
Cognitive Facilities Management: Definition And Architecture 认知设施管理:定义和架构
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.115
Jinying Xu, Weisheng Lu, L. H. Li
{"title":"Cognitive Facilities Management: Definition And Architecture","authors":"Jinying Xu, Weisheng Lu, L. H. Li","doi":"10.1680/ICSIC.64669.115","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.115","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"128571884","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
Assessment of Reinforced Concrete Structures with Distributed Fibre Optic Sensors 基于分布式光纤传感器的钢筋混凝土结构评估
International Conference on Smart Infrastructure and Construction 2019 (ICSIC) Pub Date : 1900-01-01 DOI: 10.1680/ICSIC.64669.541
Andre Brault, N. Hoult
{"title":"Assessment of Reinforced Concrete Structures with Distributed Fibre Optic Sensors","authors":"Andre Brault, N. Hoult","doi":"10.1680/ICSIC.64669.541","DOIUrl":"https://doi.org/10.1680/ICSIC.64669.541","url":null,"abstract":"","PeriodicalId":205150,"journal":{"name":"International Conference on Smart Infrastructure and Construction 2019 (ICSIC)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":null,"resultStr":null,"platform":"Semanticscholar","paperid":"124215170","PeriodicalName":null,"FirstCategoryId":null,"ListUrlMain":null,"RegionNum":0,"RegionCategory":"","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":"","EPubDate":null,"PubModel":null,"JCR":null,"JCRName":null,"Score":null,"Total":0}
引用次数: 2
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
相关产品
×
本文献相关产品
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信