考虑稳健经济再调度的稳健输电约束机组承诺:一个三阶段五层结构

IF 4.8 2区 工程技术 Q2 ENERGY & FUELS
Fawzy A. Bukhari, Khalid A. Alnowibet
{"title":"考虑稳健经济再调度的稳健输电约束机组承诺:一个三阶段五层结构","authors":"Fawzy A. Bukhari,&nbsp;Khalid A. Alnowibet","doi":"10.1016/j.segan.2025.101642","DOIUrl":null,"url":null,"abstract":"<div><div>Integrating renewable energy sources (RESs) into power systems increases operational uncertainty and threatens their efficiency. Hence, it is imperative to devise effective techniques to handle the uncertainty and mitigate the variability impacts of RESs in a transmission-constrained unit commitment (TCUC) problem. We propose a novel robust TCUC (RTCUC) model considering the robust economic redispatch (RERD) problem (balancing problem). To this end, a tri-stage, five-level hierarchical framework is constructed with two successive <em>min-max-min</em> structures. A conventional RTCUC problem is formulated as a <em>min-max-min</em> problem where the first stage decides on commitment statuses, and the second stage determines the generation scheduling using an economic dispatch model. In this paper, we change this conventional model by revisiting the second stage and formulating it as another <em>min-max-min</em> problem whose first stage determines the optimal base generation. Its second stage identifies the optimal generation re-scheduling (GRS) solution using an economic redispatch model. Thus, the whole problem is established based on a tri-stage <em>min-max-min-max-min</em> structure. The proposed problem is solved using the nested primal Benders decomposition (PBD) algorithm. The numerical studies reveal the outperformance of the proposed RTCUC model over the conventional models.</div></div>","PeriodicalId":56142,"journal":{"name":"Sustainable Energy Grids & Networks","volume":"42 ","pages":"Article 101642"},"PeriodicalIF":4.8000,"publicationDate":"2025-02-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Robust transmission-constrained unit commitment considering robust economic redispatch: A tri-stage five-level structure\",\"authors\":\"Fawzy A. Bukhari,&nbsp;Khalid A. Alnowibet\",\"doi\":\"10.1016/j.segan.2025.101642\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><div>Integrating renewable energy sources (RESs) into power systems increases operational uncertainty and threatens their efficiency. Hence, it is imperative to devise effective techniques to handle the uncertainty and mitigate the variability impacts of RESs in a transmission-constrained unit commitment (TCUC) problem. We propose a novel robust TCUC (RTCUC) model considering the robust economic redispatch (RERD) problem (balancing problem). To this end, a tri-stage, five-level hierarchical framework is constructed with two successive <em>min-max-min</em> structures. A conventional RTCUC problem is formulated as a <em>min-max-min</em> problem where the first stage decides on commitment statuses, and the second stage determines the generation scheduling using an economic dispatch model. In this paper, we change this conventional model by revisiting the second stage and formulating it as another <em>min-max-min</em> problem whose first stage determines the optimal base generation. Its second stage identifies the optimal generation re-scheduling (GRS) solution using an economic redispatch model. Thus, the whole problem is established based on a tri-stage <em>min-max-min-max-min</em> structure. The proposed problem is solved using the nested primal Benders decomposition (PBD) algorithm. The numerical studies reveal the outperformance of the proposed RTCUC model over the conventional models.</div></div>\",\"PeriodicalId\":56142,\"journal\":{\"name\":\"Sustainable Energy Grids & Networks\",\"volume\":\"42 \",\"pages\":\"Article 101642\"},\"PeriodicalIF\":4.8000,\"publicationDate\":\"2025-02-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainable Energy Grids & Networks\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2352467725000244\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable Energy Grids & Networks","FirstCategoryId":"5","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2352467725000244","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

将可再生能源(RESs)整合到电力系统中增加了运行的不确定性,并威胁到其效率。因此,必须设计有效的技术来处理传输约束单元承诺(TCUC)问题中RESs的不确定性并减轻其可变性影响。考虑稳健经济再分配(rrd)问题(平衡问题),提出了一种新的稳健TCUC模型。为此,用两个连续的最小-最大-最小结构构造了一个三阶段、五层的分层框架。将传统的RTCUC问题表述为最小-最大-最小问题,其中第一阶段确定承诺状态,第二阶段采用经济调度模型确定发电计划。在本文中,我们改变了这一传统模型,重新审视了第二阶段,并将其表述为另一个最小-最大-最小问题,其第一阶段决定最优基生成。第二阶段利用经济再调度模型确定最优的发电再调度方案。因此,整个问题建立在三阶段最小-最大-最小-最大-最小结构的基础上。该问题采用嵌套原始Benders分解(PBD)算法求解。数值研究表明,所提出的RTCUC模型优于传统模型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Robust transmission-constrained unit commitment considering robust economic redispatch: A tri-stage five-level structure
Integrating renewable energy sources (RESs) into power systems increases operational uncertainty and threatens their efficiency. Hence, it is imperative to devise effective techniques to handle the uncertainty and mitigate the variability impacts of RESs in a transmission-constrained unit commitment (TCUC) problem. We propose a novel robust TCUC (RTCUC) model considering the robust economic redispatch (RERD) problem (balancing problem). To this end, a tri-stage, five-level hierarchical framework is constructed with two successive min-max-min structures. A conventional RTCUC problem is formulated as a min-max-min problem where the first stage decides on commitment statuses, and the second stage determines the generation scheduling using an economic dispatch model. In this paper, we change this conventional model by revisiting the second stage and formulating it as another min-max-min problem whose first stage determines the optimal base generation. Its second stage identifies the optimal generation re-scheduling (GRS) solution using an economic redispatch model. Thus, the whole problem is established based on a tri-stage min-max-min-max-min structure. The proposed problem is solved using the nested primal Benders decomposition (PBD) algorithm. The numerical studies reveal the outperformance of the proposed RTCUC model over the conventional models.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Sustainable Energy Grids & Networks
Sustainable Energy Grids & Networks Energy-Energy Engineering and Power Technology
CiteScore
7.90
自引率
13.00%
发文量
206
审稿时长
49 days
期刊介绍: Sustainable Energy, Grids and Networks (SEGAN)is an international peer-reviewed publication for theoretical and applied research dealing with energy, information grids and power networks, including smart grids from super to micro grid scales. SEGAN welcomes papers describing fundamental advances in mathematical, statistical or computational methods with application to power and energy systems, as well as papers on applications, computation and modeling in the areas of electrical and energy systems with coupled information and communication technologies.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.