{"title":"工作、工具、机器和两组不同的横向机器人的综合调度","authors":"Andy Ham;Myoung-Ju Park;John Fowler","doi":"10.1109/TSM.2023.3343633","DOIUrl":null,"url":null,"abstract":"This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem.","PeriodicalId":451,"journal":{"name":"IEEE Transactions on Semiconductor Manufacturing","volume":"37 1","pages":"27-37"},"PeriodicalIF":2.3000,"publicationDate":"2023-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Scheduling of Jobs, Tools, Machines, and Two Different Set of Transbots\",\"authors\":\"Andy Ham;Myoung-Ju Park;John Fowler\",\"doi\":\"10.1109/TSM.2023.3343633\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem.\",\"PeriodicalId\":451,\"journal\":{\"name\":\"IEEE Transactions on Semiconductor Manufacturing\",\"volume\":\"37 1\",\"pages\":\"27-37\"},\"PeriodicalIF\":2.3000,\"publicationDate\":\"2023-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Semiconductor Manufacturing\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10362968/\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, ELECTRICAL & ELECTRONIC\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Semiconductor Manufacturing","FirstCategoryId":"5","ListUrlMain":"https://ieeexplore.ieee.org/document/10362968/","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, ELECTRICAL & ELECTRONIC","Score":null,"Total":0}
引用次数: 0

摘要

本文研究半导体光刻领域中出现的生产和材料传输同步调度问题。特别是,正确的光栅和正确的作业必须同时出现才能完成作业。作业由一个由车队员工组成的材料处理系统传送。作为辅助资源的光罩也由不同的车辆从一个地方传送到另一个地方。本文首次探讨了这一错综复杂的调度难题,其中包括作业、视网膜、机器和两组不同的车辆。本文介绍了一种多阶段方法,包括松弛、建设性启发式、约束编程和热启动方法,以解决这一复杂问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated Scheduling of Jobs, Tools, Machines, and Two Different Set of Transbots
This paper studies simultaneous scheduling of production and material transfer that arises in the semiconductor photolithography area. In particular, the right reticle and right job both need to be present to process the job. Jobs are transferred by a material handling system that employees a fleet of vehicles. Reticles serving as an auxiliary resource are also transferred from one place to another by a different set of vehicles. This intricate scheduling challenge, encompassing jobs, reticles, machines, and two distinct sets of vehicles, is explored here for the first time. The paper introduces a multi-stage methodology that involves relaxation, a constructive heuristic, constraint programming, and a warm-start approach to address this complex problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IEEE Transactions on Semiconductor Manufacturing
IEEE Transactions on Semiconductor Manufacturing 工程技术-工程:电子与电气
CiteScore
5.20
自引率
11.10%
发文量
101
审稿时长
3.3 months
期刊介绍: The IEEE Transactions on Semiconductor Manufacturing addresses the challenging problems of manufacturing complex microelectronic components, especially very large scale integrated circuits (VLSI). Manufacturing these products requires precision micropatterning, precise control of materials properties, ultraclean work environments, and complex interactions of chemical, physical, electrical and mechanical processes.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信