准备一个老化的设施,以满足扩大实验室的需求:斯坦福纳米制造设施的改造

J. Shott, J. Bumgarner, M. X. Tang
{"title":"准备一个老化的设施,以满足扩大实验室的需求:斯坦福纳米制造设施的改造","authors":"J. Shott, J. Bumgarner, M. X. Tang","doi":"10.1109/UGIM.2012.6247095","DOIUrl":null,"url":null,"abstract":"The Stanford Nanofabrication Facility at Stanford University is housed in a building approaching 30 years in age. The ability of the program to meet research needs is increasingly hampered by the capacity and age of the physical structure. In late 2010, the Stanford Nanofabrication Facility was awarded funding from the National Science Foundation, and matched by contributions from the University, to begin a renovation program that addresses these infrastructure shortcomings. This paper describes the key tasks undertaken and the challenges of executing a construction project of this nature with minimal impact to ongoing research. We conclude with lessons learned.","PeriodicalId":347838,"journal":{"name":"2012 19th Biennial University/Government/Industry, Micro/Nano Symposium (UGIM)","volume":"190 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Preparing an Aging Facility to Meet Expanding Lab Demands: Renovation of the Stanford Nanofabrication Facility\",\"authors\":\"J. Shott, J. Bumgarner, M. X. Tang\",\"doi\":\"10.1109/UGIM.2012.6247095\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Stanford Nanofabrication Facility at Stanford University is housed in a building approaching 30 years in age. The ability of the program to meet research needs is increasingly hampered by the capacity and age of the physical structure. In late 2010, the Stanford Nanofabrication Facility was awarded funding from the National Science Foundation, and matched by contributions from the University, to begin a renovation program that addresses these infrastructure shortcomings. This paper describes the key tasks undertaken and the challenges of executing a construction project of this nature with minimal impact to ongoing research. We conclude with lessons learned.\",\"PeriodicalId\":347838,\"journal\":{\"name\":\"2012 19th Biennial University/Government/Industry, Micro/Nano Symposium (UGIM)\",\"volume\":\"190 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-07-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 19th Biennial University/Government/Industry, Micro/Nano Symposium (UGIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UGIM.2012.6247095\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 19th Biennial University/Government/Industry, Micro/Nano Symposium (UGIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UGIM.2012.6247095","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

斯坦福大学的斯坦福纳米制造设施位于一栋已有近30年历史的建筑中。该计划满足研究需求的能力日益受到物理结构的容量和年龄的阻碍。2010年底,斯坦福纳米制造设施获得了美国国家科学基金会的资助,并得到了斯坦福大学的资助,开始了一项改造计划,以解决这些基础设施的缺陷。本文描述了所承担的关键任务和执行这种性质的建设项目对正在进行的研究影响最小的挑战。最后,我们总结了一些经验教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Preparing an Aging Facility to Meet Expanding Lab Demands: Renovation of the Stanford Nanofabrication Facility
The Stanford Nanofabrication Facility at Stanford University is housed in a building approaching 30 years in age. The ability of the program to meet research needs is increasingly hampered by the capacity and age of the physical structure. In late 2010, the Stanford Nanofabrication Facility was awarded funding from the National Science Foundation, and matched by contributions from the University, to begin a renovation program that addresses these infrastructure shortcomings. This paper describes the key tasks undertaken and the challenges of executing a construction project of this nature with minimal impact to ongoing research. We conclude with lessons learned.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信