缩短了德州仪器(ti)一家大型晶圆厂的生产周期

K. Potti, M. Whitaker
{"title":"缩短了德州仪器(ti)一家大型晶圆厂的生产周期","authors":"K. Potti, M. Whitaker","doi":"10.1109/ASMC.2003.1194477","DOIUrl":null,"url":null,"abstract":"This paper highlights the strategic and tactical applications of simulation modeling and how it was used to reduce cycle time at a major Texas Instruments wafer fab.","PeriodicalId":178755,"journal":{"name":"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI","volume":"92 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Cycle time reduction at a major Texas Instruments wafer fab\",\"authors\":\"K. Potti, M. Whitaker\",\"doi\":\"10.1109/ASMC.2003.1194477\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper highlights the strategic and tactical applications of simulation modeling and how it was used to reduce cycle time at a major Texas Instruments wafer fab.\",\"PeriodicalId\":178755,\"journal\":{\"name\":\"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI\",\"volume\":\"92 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-04-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.2003.1194477\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2003.1194477","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

本文重点介绍了仿真建模的战略和战术应用,以及如何使用仿真建模来减少主要德州仪器晶圆厂的周期时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cycle time reduction at a major Texas Instruments wafer fab
This paper highlights the strategic and tactical applications of simulation modeling and how it was used to reduce cycle time at a major Texas Instruments wafer fab.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信