Z. Conroy, James J. Grealish, H. Miles, Anthony J. Suto, A. Crouch, S. Meyers
{"title":"电路板辅助- bist:测试点侵蚀的长期和短期解决方案-进入DFx工具箱","authors":"Z. Conroy, James J. Grealish, H. Miles, Anthony J. Suto, A. Crouch, S. Meyers","doi":"10.1109/TEST.2012.6401572","DOIUrl":null,"url":null,"abstract":"Testpoint erosion, the continuously increasing loss of physical net/node access at the In-Circuit Test process step is putting board test strategies at risk [1]. In response, the International Electronics Manufacturing Industry (iNEMI) [2] 2009 road map and gap analysis [3] efforts launched a Technology Integration Group (TIG) `Built-in Self-Test Project' or `BIST projecty' [4] to drive a new test strategy. Integrated Circuit (IC) BIST was identified as a solution and the electronics industry was surveyed to ratify the decision. After analysis of the survey, the TIG determined that a two-tier strategy was needed. This paper presents key survey findings and the two tier strategies for both the long and short term to identify standardization requirements for IC BIST usage at the board-level.","PeriodicalId":353290,"journal":{"name":"2012 IEEE International Test Conference","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Board assisted-BIST: Long and short term solutions for testpoint erosion — Reaching into the DFx toolbox\",\"authors\":\"Z. Conroy, James J. Grealish, H. Miles, Anthony J. Suto, A. Crouch, S. Meyers\",\"doi\":\"10.1109/TEST.2012.6401572\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Testpoint erosion, the continuously increasing loss of physical net/node access at the In-Circuit Test process step is putting board test strategies at risk [1]. In response, the International Electronics Manufacturing Industry (iNEMI) [2] 2009 road map and gap analysis [3] efforts launched a Technology Integration Group (TIG) `Built-in Self-Test Project' or `BIST projecty' [4] to drive a new test strategy. Integrated Circuit (IC) BIST was identified as a solution and the electronics industry was surveyed to ratify the decision. After analysis of the survey, the TIG determined that a two-tier strategy was needed. This paper presents key survey findings and the two tier strategies for both the long and short term to identify standardization requirements for IC BIST usage at the board-level.\",\"PeriodicalId\":353290,\"journal\":{\"name\":\"2012 IEEE International Test Conference\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE International Test Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TEST.2012.6401572\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Test Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TEST.2012.6401572","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Board assisted-BIST: Long and short term solutions for testpoint erosion — Reaching into the DFx toolbox
Testpoint erosion, the continuously increasing loss of physical net/node access at the In-Circuit Test process step is putting board test strategies at risk [1]. In response, the International Electronics Manufacturing Industry (iNEMI) [2] 2009 road map and gap analysis [3] efforts launched a Technology Integration Group (TIG) `Built-in Self-Test Project' or `BIST projecty' [4] to drive a new test strategy. Integrated Circuit (IC) BIST was identified as a solution and the electronics industry was surveyed to ratify the decision. After analysis of the survey, the TIG determined that a two-tier strategy was needed. This paper presents key survey findings and the two tier strategies for both the long and short term to identify standardization requirements for IC BIST usage at the board-level.