{"title":"插一次,测试一切","authors":"A. S. Yawelak, C. Viho","doi":"10.1109/ATS.2006.65","DOIUrl":null,"url":null,"abstract":"Configuration management presents several challenges to test suite execution in interoperability testing. Several nodes have to be rearranged from test to test in a reliable and efficient way. This work proposes a novel methodology based on the replacement of underlying networking technologies to transparently automate the process. The methodology is presented and initial results are exposed","PeriodicalId":242530,"journal":{"name":"2006 15th Asian Test Symposium","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Plug once, test everything\",\"authors\":\"A. S. Yawelak, C. Viho\",\"doi\":\"10.1109/ATS.2006.65\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Configuration management presents several challenges to test suite execution in interoperability testing. Several nodes have to be rearranged from test to test in a reliable and efficient way. This work proposes a novel methodology based on the replacement of underlying networking technologies to transparently automate the process. The methodology is presented and initial results are exposed\",\"PeriodicalId\":242530,\"journal\":{\"name\":\"2006 15th Asian Test Symposium\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-11-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 15th Asian Test Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ATS.2006.65\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 15th Asian Test Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ATS.2006.65","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Configuration management presents several challenges to test suite execution in interoperability testing. Several nodes have to be rearranged from test to test in a reliable and efficient way. This work proposes a novel methodology based on the replacement of underlying networking technologies to transparently automate the process. The methodology is presented and initial results are exposed