{"title":"利用拥塞的可能价值和运行制度的优化进行拥塞风险管理——罗马尼亚电力系统西部部分的案例研究","authors":"D. M. Pop, S. Kilyeni, P. Andea, C. Barbulescu","doi":"10.1109/EURCON.2009.5167701","DOIUrl":null,"url":null,"abstract":"The power systems, around the world, tend to be forced to operate close to their full capacities, due to the environmental and/or economic constraints to build new power plants and transmission lines. Therefore congestion management became a vital issue within the power system operation, under deregulated environment and can be a major hurdle to trade of electricity if not properly implemented. It ensures the non-violation of operating limits. The first part of the paper deals with the current congestion management mechanisms within the deregulated power market. A synthesis of the congestion management methods and mechanisms involved has been effectuated. Within the second part of the paper a case study for the Western and South Western part of the power system of Romania is presented. Several operating regimes that are leading to special situations are pointed-out, followed by appropriate conclusion.","PeriodicalId":256285,"journal":{"name":"IEEE EUROCON 2009","volume":"104 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Congestion risk management using the probable value of congestion and the optimization of the operating regimes Case study for Western part of Romanian Power System\",\"authors\":\"D. M. Pop, S. Kilyeni, P. Andea, C. Barbulescu\",\"doi\":\"10.1109/EURCON.2009.5167701\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The power systems, around the world, tend to be forced to operate close to their full capacities, due to the environmental and/or economic constraints to build new power plants and transmission lines. Therefore congestion management became a vital issue within the power system operation, under deregulated environment and can be a major hurdle to trade of electricity if not properly implemented. It ensures the non-violation of operating limits. The first part of the paper deals with the current congestion management mechanisms within the deregulated power market. A synthesis of the congestion management methods and mechanisms involved has been effectuated. Within the second part of the paper a case study for the Western and South Western part of the power system of Romania is presented. Several operating regimes that are leading to special situations are pointed-out, followed by appropriate conclusion.\",\"PeriodicalId\":256285,\"journal\":{\"name\":\"IEEE EUROCON 2009\",\"volume\":\"104 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-05-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE EUROCON 2009\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EURCON.2009.5167701\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE EUROCON 2009","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EURCON.2009.5167701","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

由于建设新的发电厂和输电线路的环境和/或经济限制,世界各地的电力系统往往被迫接近其满负荷运行。因此,在放松管制的环境下,拥塞管理成为电力系统运行中的一个重要问题,如果实施不当,可能成为电力交易的主要障碍。确保不违反操作限制。本文的第一部分讨论了在解除管制的电力市场中当前的拥塞管理机制。对所涉及的拥塞管理方法和机制进行了综合。在论文的第二部分,介绍了罗马尼亚西部和西南部电力系统的案例研究。指出了几种导致特殊情况的操作制度,然后作出适当的结论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Congestion risk management using the probable value of congestion and the optimization of the operating regimes Case study for Western part of Romanian Power System
The power systems, around the world, tend to be forced to operate close to their full capacities, due to the environmental and/or economic constraints to build new power plants and transmission lines. Therefore congestion management became a vital issue within the power system operation, under deregulated environment and can be a major hurdle to trade of electricity if not properly implemented. It ensures the non-violation of operating limits. The first part of the paper deals with the current congestion management mechanisms within the deregulated power market. A synthesis of the congestion management methods and mechanisms involved has been effectuated. Within the second part of the paper a case study for the Western and South Western part of the power system of Romania is presented. Several operating regimes that are leading to special situations are pointed-out, followed by appropriate conclusion.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信