{"title":"700MW级全风冷水力发电机组的设计与运行","authors":"Yutian Sun, Qingfei Gao","doi":"10.1109/EURCON.2009.5167679","DOIUrl":null,"url":null,"abstract":"As a series of 700MW Class Totally Air-Cooled Hydroelectric generators has been put into operation in China, the development of hydroelectric generators has arrived at a new stage. To summarize the experience, taking the generator of Three Gorges Right Bank Power Station as an example, the design and operation features about 700MW Class Totally Air-Cooled Hydroelectric generators are presented and discussed.","PeriodicalId":256285,"journal":{"name":"IEEE EUROCON 2009","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"The design and operation of 700MW class Totally Air-Cooled Hydroelectric generators\",\"authors\":\"Yutian Sun, Qingfei Gao\",\"doi\":\"10.1109/EURCON.2009.5167679\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As a series of 700MW Class Totally Air-Cooled Hydroelectric generators has been put into operation in China, the development of hydroelectric generators has arrived at a new stage. To summarize the experience, taking the generator of Three Gorges Right Bank Power Station as an example, the design and operation features about 700MW Class Totally Air-Cooled Hydroelectric generators are presented and discussed.\",\"PeriodicalId\":256285,\"journal\":{\"name\":\"IEEE EUROCON 2009\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-05-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE EUROCON 2009\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EURCON.2009.5167679\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE EUROCON 2009","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EURCON.2009.5167679","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The design and operation of 700MW class Totally Air-Cooled Hydroelectric generators
As a series of 700MW Class Totally Air-Cooled Hydroelectric generators has been put into operation in China, the development of hydroelectric generators has arrived at a new stage. To summarize the experience, taking the generator of Three Gorges Right Bank Power Station as an example, the design and operation features about 700MW Class Totally Air-Cooled Hydroelectric generators are presented and discussed.