{"title":"半导体和MEMS行业的调度和资源优化MES","authors":"J. Sieberg, R. Walter","doi":"10.1109/ASMC.2003.1194476","DOIUrl":null,"url":null,"abstract":"While the number of custom specific products is increasing, the order size often diminishes. This problem leads to difficulties in managing demand changes, promising accurate dates and ensuring optimal equipment utilization. A real-time information gap exists in the heart of most manufacturing enterprises, since there is a lack of visibility and predictability. The scheduling of manufacturing orders bears great optimization potential. Based on modern MES with maximum equipment integration, the use of automatic process control and optimization enables SME to be more competitive, efficient and customer-friendly.","PeriodicalId":178755,"journal":{"name":"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI","volume":"93 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"A scheduling and resource optimising MES for the semiconductor and MEMS industry\",\"authors\":\"J. Sieberg, R. Walter\",\"doi\":\"10.1109/ASMC.2003.1194476\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"While the number of custom specific products is increasing, the order size often diminishes. This problem leads to difficulties in managing demand changes, promising accurate dates and ensuring optimal equipment utilization. A real-time information gap exists in the heart of most manufacturing enterprises, since there is a lack of visibility and predictability. The scheduling of manufacturing orders bears great optimization potential. Based on modern MES with maximum equipment integration, the use of automatic process control and optimization enables SME to be more competitive, efficient and customer-friendly.\",\"PeriodicalId\":178755,\"journal\":{\"name\":\"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI\",\"volume\":\"93 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-04-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.2003.1194476\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advanced Semiconductor Manufacturing Conference and Workshop, 2003 IEEEI/SEMI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.2003.1194476","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A scheduling and resource optimising MES for the semiconductor and MEMS industry
While the number of custom specific products is increasing, the order size often diminishes. This problem leads to difficulties in managing demand changes, promising accurate dates and ensuring optimal equipment utilization. A real-time information gap exists in the heart of most manufacturing enterprises, since there is a lack of visibility and predictability. The scheduling of manufacturing orders bears great optimization potential. Based on modern MES with maximum equipment integration, the use of automatic process control and optimization enables SME to be more competitive, efficient and customer-friendly.