Experiences with pre-evaporators at Racecourse Mill

IF 0.2 4区 农林科学 Q4 FOOD SCIENCE & TECHNOLOGY
B. Lavarack, Blake Ripper, Robert Iturbe
{"title":"Experiences with pre-evaporators at Racecourse Mill","authors":"B. Lavarack, Blake Ripper, Robert Iturbe","doi":"10.36961/si29960","DOIUrl":null,"url":null,"abstract":"In the 2008 season, a new pre-evaporator vessel, called PE1A, was installed at the Racecourse Mill as a precursor to the introduction of cogeneration at the factory. PE1A and the existing pre-evaporator, called PE-north, were designed as steam-efficiency measures to provide vapour to the evaporating crystallizers, juice heaters, co-located sugar refinery and, potentially, to other value-adding operations. Both pre-evaporator vessels are Robert type evaporators, with the PE-north vessel an older standard design and the PE1A vessel incorporating new design features. PE1A is configured to take letdown steam from the cogeneration boiler (Racecourse no.4 boiler) and to return the condensate to the boiler. PE-north takes exhaust steam from the milling turbines and turbo-alternators supplied by Racecourse no.3 boiler. The specifications for condensate supplied as boiler feedwater to the cogeneration boiler, which operates at 8,000 kPa, are more stringent than the industry typical boilers, operating at 1,700 kPa. PE1A is operated as a juice-evaporator vessel during the crushing season and as a steam transformer during the non-crush season. The operation of both pre-evaporator vessels is described. Severe corrosion issues are noted for the PE1A vessel, which is not prevalent for the PE-north vessel despite the latter being considerably older and used in a similar role. The causes of the high corrosion levels for PE1A are discussed, and some measures to alleviate the operational conditions at Racecourse are described.","PeriodicalId":54362,"journal":{"name":"Sugar Industry-Zuckerindustrie","volume":"64 1","pages":""},"PeriodicalIF":0.2000,"publicationDate":"2023-06-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sugar Industry-Zuckerindustrie","FirstCategoryId":"97","ListUrlMain":"https://doi.org/10.36961/si29960","RegionNum":4,"RegionCategory":"农林科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"FOOD SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

Abstract

In the 2008 season, a new pre-evaporator vessel, called PE1A, was installed at the Racecourse Mill as a precursor to the introduction of cogeneration at the factory. PE1A and the existing pre-evaporator, called PE-north, were designed as steam-efficiency measures to provide vapour to the evaporating crystallizers, juice heaters, co-located sugar refinery and, potentially, to other value-adding operations. Both pre-evaporator vessels are Robert type evaporators, with the PE-north vessel an older standard design and the PE1A vessel incorporating new design features. PE1A is configured to take letdown steam from the cogeneration boiler (Racecourse no.4 boiler) and to return the condensate to the boiler. PE-north takes exhaust steam from the milling turbines and turbo-alternators supplied by Racecourse no.3 boiler. The specifications for condensate supplied as boiler feedwater to the cogeneration boiler, which operates at 8,000 kPa, are more stringent than the industry typical boilers, operating at 1,700 kPa. PE1A is operated as a juice-evaporator vessel during the crushing season and as a steam transformer during the non-crush season. The operation of both pre-evaporator vessels is described. Severe corrosion issues are noted for the PE1A vessel, which is not prevalent for the PE-north vessel despite the latter being considerably older and used in a similar role. The causes of the high corrosion levels for PE1A are discussed, and some measures to alleviate the operational conditions at Racecourse are described.
在马场工厂使用预蒸发器的经验
在2008赛季,一个新的预蒸发器容器,称为PE1A,被安装在赛马场工厂作为引进热电联产在工厂的先驱。PE1A和现有的预蒸发器,称为PE-north,被设计为蒸汽效率措施,为蒸发结晶器,果汁加热器,同址糖厂提供蒸汽,并可能为其他增值操作提供蒸汽。两种预蒸发器容器都是罗伯特型蒸发器,PE-north容器采用较旧的标准设计,PE1A容器采用新设计功能。PE1A被配置为从热电联产锅炉(赛马场号)排出蒸汽。4锅炉)并将冷凝水返回锅炉。PE-north从赛马场提供的磨铣涡轮机和涡轮发电机中提取废气。3锅炉。作为锅炉给水提供给热电联产锅炉的冷凝水的规格比工业典型锅炉的规格更严格,热电联产锅炉的运行压力为8000千帕。PE1A在破碎季节作为果汁蒸发器容器,在非破碎季节作为蒸汽变压器。介绍了两种预蒸发器容器的运行情况。PE1A容器存在严重的腐蚀问题,PE-north容器并不普遍,尽管后者相当老旧,并且在类似的角色中使用。讨论了PE1A高腐蚀的原因,并介绍了改善赛马场运行条件的措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Sugar Industry-Zuckerindustrie
Sugar Industry-Zuckerindustrie 工程技术-食品科技
CiteScore
0.50
自引率
50.00%
发文量
22
审稿时长
18-36 weeks
期刊介绍: Sugar Industry / Zuckerindustrie accepts original papers (research reports), review articles, and short communications on all the aspects implied by the journals title and subtitle.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信