{"title":"A Multiobjective Optimization Framework for Strategic Airport Capacity Planning Under Policy-Driven Demand Scenarios","authors":"Ibrahim M. Hezam","doi":"10.1155/cplx/6737547","DOIUrl":null,"url":null,"abstract":"<p>Rapid passenger-demand growth, budget constraints, and large-scale events create substantial challenges for long-term airport capacity planning. This study develops a scenario-based multiperiod multiobjective mixed-integer linear programming framework for strategic airport capacity planning under alternative policy-driven demand conditions. The model jointly determines continuous component-level expansion and discrete infrastructure projects while explicitly representing terminal, runway, and gate capacities. Investment strategies are evaluated in terms of present-value cost, unmet passenger demand, component-level congestion pressure, and reserve-capacity shortfall. The framework was implemented in YALMIP under MATLAB R2026a and applied to four major Saudi airports over the 2026–2034 planning horizon. Six scenarios represent moderate and high demand growth, constrained funding, reserve-oriented planning, pilgrimage demand pressure, and FIFA World Cup 2034 readiness. The scenarios are deterministic, independent, and nonprobabilistic. Lexicographic objective normalization, systematic weight analysis, and parameter-sensitivity experiments are used to evaluate the stability of the resulting plans. Under moderate growth, forecast demand can be accommodated with a present-value investment of 24.900 billion SAR and no unmet demand. Under sustained high growth, however, conventional project options and constrained budgets lead to substantial congestion and capacity shortfalls. Under the assumed World Cup demand multipliers, project catalogue, budget conditions, and 10% reserve requirement, the model identifies a feasible 2034 capacity plan requiring a present-value investment of 102.373 billion SAR. This value should be interpreted as a model-based planning estimate under the specified assumptions rather than as a forecast of actual national event-readiness expenditure. The framework provides a structured basis for comparing phased airport-capacity expansion strategies under alternative demand and policy conditions.</p>","PeriodicalId":50653,"journal":{"name":"Complexity","volume":"2026 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2026-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1155/cplx/6737547","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Complexity","FirstCategoryId":"5","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1155/cplx/6737547","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATHEMATICS, INTERDISCIPLINARY APPLICATIONS","Score":null,"Total":0}
引用次数: 0
Abstract
Rapid passenger-demand growth, budget constraints, and large-scale events create substantial challenges for long-term airport capacity planning. This study develops a scenario-based multiperiod multiobjective mixed-integer linear programming framework for strategic airport capacity planning under alternative policy-driven demand conditions. The model jointly determines continuous component-level expansion and discrete infrastructure projects while explicitly representing terminal, runway, and gate capacities. Investment strategies are evaluated in terms of present-value cost, unmet passenger demand, component-level congestion pressure, and reserve-capacity shortfall. The framework was implemented in YALMIP under MATLAB R2026a and applied to four major Saudi airports over the 2026–2034 planning horizon. Six scenarios represent moderate and high demand growth, constrained funding, reserve-oriented planning, pilgrimage demand pressure, and FIFA World Cup 2034 readiness. The scenarios are deterministic, independent, and nonprobabilistic. Lexicographic objective normalization, systematic weight analysis, and parameter-sensitivity experiments are used to evaluate the stability of the resulting plans. Under moderate growth, forecast demand can be accommodated with a present-value investment of 24.900 billion SAR and no unmet demand. Under sustained high growth, however, conventional project options and constrained budgets lead to substantial congestion and capacity shortfalls. Under the assumed World Cup demand multipliers, project catalogue, budget conditions, and 10% reserve requirement, the model identifies a feasible 2034 capacity plan requiring a present-value investment of 102.373 billion SAR. This value should be interpreted as a model-based planning estimate under the specified assumptions rather than as a forecast of actual national event-readiness expenditure. The framework provides a structured basis for comparing phased airport-capacity expansion strategies under alternative demand and policy conditions.
期刊介绍:
Complexity is a cross-disciplinary journal focusing on the rapidly expanding science of complex adaptive systems. The purpose of the journal is to advance the science of complexity. Articles may deal with such methodological themes as chaos, genetic algorithms, cellular automata, neural networks, and evolutionary game theory. Papers treating applications in any area of natural science or human endeavor are welcome, and especially encouraged are papers integrating conceptual themes and applications that cross traditional disciplinary boundaries. Complexity is not meant to serve as a forum for speculation and vague analogies between words like “chaos,” “self-organization,” and “emergence” that are often used in completely different ways in science and in daily life.