{"title":"Calculating the Current Limits to Use in Production Line Dielectric Withstand Tests","authors":"S. Richardson","doi":"10.1109/PSES.2007.4378481","DOIUrl":null,"url":null,"abstract":"This article includes the result of a survey as to what the term \"breakdown\" means, and provides a working definition of the term. Next, the article will investigate various methods for determining the impedance of a product to assist in setting the current limits.","PeriodicalId":264110,"journal":{"name":"2007 IEEE Symposium on Product Compliance Engineering","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-11-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Symposium on Product Compliance Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSES.2007.4378481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This article includes the result of a survey as to what the term "breakdown" means, and provides a working definition of the term. Next, the article will investigate various methods for determining the impedance of a product to assist in setting the current limits.