Minimisation of equipment cost for transfer lines with blocks of parallel tasks

A. Bratcu, L. Makdessian, A. Dolgui
{"title":"Minimisation of equipment cost for transfer lines with blocks of parallel tasks","authors":"A. Bratcu, L. Makdessian, A. Dolgui","doi":"10.1109/ISATP.2003.1217196","DOIUrl":null,"url":null,"abstract":"This paper deals with the design of single product lines without buffers (transfer lines), which dispose of several types of multifunctional tools (equipments) allowing the parallel execution of many different tasks by the same equipment (blocks of tasks). The production line design is stated as a multi-criteria optimisation problem: balancing the line and minimising the equipment cost. It is decomposed into two sub-problems: first, the blocks are obtained by assigning the tasks to equipments, subject to the precedence constraints; secondly, these blocks are assigned to workstations, subject to the cycle time constraint, which is just the ALB problem. To solve the first sub-problem, a branch-and-bound algorithm, enhanced by using two lower bounds and a dominance rule, is proposed.","PeriodicalId":101913,"journal":{"name":"Proceedings of the IEEE International Symposium onAssembly and Task Planning, 2003.","volume":"154 ","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the IEEE International Symposium onAssembly and Task Planning, 2003.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISATP.2003.1217196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper deals with the design of single product lines without buffers (transfer lines), which dispose of several types of multifunctional tools (equipments) allowing the parallel execution of many different tasks by the same equipment (blocks of tasks). The production line design is stated as a multi-criteria optimisation problem: balancing the line and minimising the equipment cost. It is decomposed into two sub-problems: first, the blocks are obtained by assigning the tasks to equipments, subject to the precedence constraints; secondly, these blocks are assigned to workstations, subject to the cycle time constraint, which is just the ALB problem. To solve the first sub-problem, a branch-and-bound algorithm, enhanced by using two lower bounds and a dominance rule, is proposed.
使具有并行任务块的传输线的设备成本最小化
本文讨论了不带缓冲区(传输线)的单一生产线的设计,该生产线可配置多种类型的多功能工具(设备),允许同一设备(任务块)并行执行许多不同的任务。生产线设计是一个多标准优化问题:平衡生产线和最小化设备成本。将其分解为两个子问题:首先,在优先级约束下,将任务分配给设备来获得分块;其次,将这些块分配给工作站,受周期时间约束,这就是ALB问题。针对第一个子问题,提出了一种利用两个下界和一个优势规则增强的分支定界算法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书