A National Facility- Challenges and Progress

D. Hirons
{"title":"A National Facility- Challenges and Progress","authors":"D. Hirons","doi":"10.1109/UGIM.2012.6247097","DOIUrl":null,"url":null,"abstract":"It is all well and good to set up a National Facility comprising 8 Nodes distributed throughout Australia but it is another to actually get the Nodes to interact, communicate, share resources, handle multi-nodal requests, and promote activities together. At the Australian National Fabrication Facility (ANFF) we have make significant steps to become a truly National Facility. Regular meetings of all the Facility Manager's have facilitated discussion on issues of a national perspective. Keywords - facilities, key performance indicators, management, strategy, national, fabrication.","PeriodicalId":347838,"journal":{"name":"2012 19th Biennial University/Government/Industry, Micro/Nano Symposium (UGIM)","volume":"36 18","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 19th Biennial University/Government/Industry, Micro/Nano Symposium (UGIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UGIM.2012.6247097","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It is all well and good to set up a National Facility comprising 8 Nodes distributed throughout Australia but it is another to actually get the Nodes to interact, communicate, share resources, handle multi-nodal requests, and promote activities together. At the Australian National Fabrication Facility (ANFF) we have make significant steps to become a truly National Facility. Regular meetings of all the Facility Manager's have facilitated discussion on issues of a national perspective. Keywords - facilities, key performance indicators, management, strategy, national, fabrication.
国家设施——挑战与进步
建立一个由分布在澳大利亚各地的8个节点组成的国家设施是很好的,但真正让这些节点进行交互、通信、共享资源、处理多节点请求并共同推动活动是另一回事。在澳大利亚国家制造设施(ANFF),我们已经迈出了重要的一步,成为一个真正的国家设施。所有设施经理的定期会议促进了对国家视角问题的讨论。关键词:设施,关键绩效指标,管理,战略,国家,制造。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信