软件项目中增量交付的财务度量——寻找一个可以回答以下问题的模型:将一个项目分成几个迭代值多少钱?

Sandro Magalhães Manteiga, André Gomes Lamas Otero, A. Cunha, L. Dias
{"title":"软件项目中增量交付的财务度量——寻找一个可以回答以下问题的模型:将一个项目分成几个迭代值多少钱?","authors":"Sandro Magalhães Manteiga, André Gomes Lamas Otero, A. Cunha, L. Dias","doi":"10.1109/ITNG.2015.11","DOIUrl":null,"url":null,"abstract":"In this article, it is presented a mathematical model for the additional financial value generated in software projects, as a function of the number of incremental deliveries during the project. Based on this model, it was presented the theoretical asymptotic limit, for infinite deliveries during the project. This practice is called Continuous Deployment (CD), already used by many companies such as Google and Facebook. As financial evaluation measuring, it was used the Net Present Value (NPV). It was also measured how the use of incremental deliveries can create additional NPV for software projects which have short duration (maximum of six months), median duration (one year) and long duration (two years). At the end, it is argued that this additional value can be strategic for maintaining a sustainable portfolio of innovation projects.","PeriodicalId":89615,"journal":{"name":"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations","volume":"60 24","pages":"33-37"},"PeriodicalIF":0.0000,"publicationDate":"2015-04-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Financial Measuring of Incremental Deliveries in Software Projects - Finding a Model That Can Answer: How Much is Worth to Split a Project into Iterations?\",\"authors\":\"Sandro Magalhães Manteiga, André Gomes Lamas Otero, A. Cunha, L. Dias\",\"doi\":\"10.1109/ITNG.2015.11\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this article, it is presented a mathematical model for the additional financial value generated in software projects, as a function of the number of incremental deliveries during the project. Based on this model, it was presented the theoretical asymptotic limit, for infinite deliveries during the project. This practice is called Continuous Deployment (CD), already used by many companies such as Google and Facebook. As financial evaluation measuring, it was used the Net Present Value (NPV). It was also measured how the use of incremental deliveries can create additional NPV for software projects which have short duration (maximum of six months), median duration (one year) and long duration (two years). At the end, it is argued that this additional value can be strategic for maintaining a sustainable portfolio of innovation projects.\",\"PeriodicalId\":89615,\"journal\":{\"name\":\"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations\",\"volume\":\"60 24\",\"pages\":\"33-37\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-04-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITNG.2015.11\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the ... International Conference on Information Technology: New Generations. International Conference on Information Technology: New Generations","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITNG.2015.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在这篇文章中,它提出了软件项目中产生的额外财务价值的数学模型,作为项目期间增量交付数量的函数。在此模型的基础上,给出了工程无穷次交付的理论渐近极限。这种做法被称为持续部署(Continuous Deployment, CD),已经被Google和Facebook等许多公司采用。作为财务评价指标,采用净现值(NPV)。它还测量了增量交付的使用如何为具有短持续时间(最多六个月)、中持续时间(一年)和长持续时间(两年)的软件项目创造额外的NPV。最后,本文认为这种附加价值对于维持可持续的创新项目组合具有战略意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Financial Measuring of Incremental Deliveries in Software Projects - Finding a Model That Can Answer: How Much is Worth to Split a Project into Iterations?
In this article, it is presented a mathematical model for the additional financial value generated in software projects, as a function of the number of incremental deliveries during the project. Based on this model, it was presented the theoretical asymptotic limit, for infinite deliveries during the project. This practice is called Continuous Deployment (CD), already used by many companies such as Google and Facebook. As financial evaluation measuring, it was used the Net Present Value (NPV). It was also measured how the use of incremental deliveries can create additional NPV for software projects which have short duration (maximum of six months), median duration (one year) and long duration (two years). At the end, it is argued that this additional value can be strategic for maintaining a sustainable portfolio of innovation projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信