最佳价值采购比低价采购成本高吗?项目总成本视角

Q1 Social Sciences
Brian C. Lines, Raghu Kakarapalli, Phuong H. D. Nguyen
{"title":"最佳价值采购比低价采购成本高吗?项目总成本视角","authors":"Brian C. Lines, Raghu Kakarapalli, Phuong H. D. Nguyen","doi":"10.1080/15578771.2020.1777489","DOIUrl":null,"url":null,"abstract":"ABSTRACT Although construction owners have long utilized Best-Value (BV) procurement within alternative delivery, they have historically been less willing to do so when selecting contractor teams in traditional Design-Bid-Build (D-B-B). In D-B-B, the availability of 100% complete construction documents implies that the lowest bidder should be selected. As conventional wisdom suggests, why select a more expensive contractor only to receive an equivalent scope of work in return? In response to this question, this study investigated the full cost implications to owners who utilized BV procurement within 118 D-B-B projects. Because BV involves potentially selecting a contractor whose bid is more expensive than the lowest bidder, an attempt was made to measure the cost of the selected contractor relative to the low bid alternative. Results indicated that while BV-procured contractors do come at a premium on average, they still provide lower bids than the market rate. Further, employing BV-procured contractors can be beneficial to owners in terms of project cost and schedule performance. This study contributes to the body of knowledge by developing two new metrics–the BV Premium and Total BV Cost–to quantitatively measure the project cost implications for owners who employ BV procurement to buy construction services within D-B-B.","PeriodicalId":39782,"journal":{"name":"International Journal of Construction Education and Research","volume":"38 1","pages":"85 - 100"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Does Best Value Procurement Cost More than Low-Bid? A Total Project Cost Perspective\",\"authors\":\"Brian C. Lines, Raghu Kakarapalli, Phuong H. D. Nguyen\",\"doi\":\"10.1080/15578771.2020.1777489\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Although construction owners have long utilized Best-Value (BV) procurement within alternative delivery, they have historically been less willing to do so when selecting contractor teams in traditional Design-Bid-Build (D-B-B). In D-B-B, the availability of 100% complete construction documents implies that the lowest bidder should be selected. As conventional wisdom suggests, why select a more expensive contractor only to receive an equivalent scope of work in return? In response to this question, this study investigated the full cost implications to owners who utilized BV procurement within 118 D-B-B projects. Because BV involves potentially selecting a contractor whose bid is more expensive than the lowest bidder, an attempt was made to measure the cost of the selected contractor relative to the low bid alternative. Results indicated that while BV-procured contractors do come at a premium on average, they still provide lower bids than the market rate. Further, employing BV-procured contractors can be beneficial to owners in terms of project cost and schedule performance. This study contributes to the body of knowledge by developing two new metrics–the BV Premium and Total BV Cost–to quantitatively measure the project cost implications for owners who employ BV procurement to buy construction services within D-B-B.\",\"PeriodicalId\":39782,\"journal\":{\"name\":\"International Journal of Construction Education and Research\",\"volume\":\"38 1\",\"pages\":\"85 - 100\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Construction Education and Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/15578771.2020.1777489\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Construction Education and Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/15578771.2020.1777489","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 6

摘要

虽然建筑业主长期以来一直在替代交付中使用最佳价值(BV)采购,但在传统的设计-投标-建造(D-B-B)模式中选择承包商团队时,他们历来不太愿意这样做。在D-B-B中,100%完整的施工文件意味着应该选择最低的投标人。正如传统智慧所暗示的那样,为什么选择一个更昂贵的承包商,只是为了得到同等范围的工作作为回报呢?为了回答这个问题,本研究调查了118个D-B-B项目中使用BV采购的业主的全部成本影响。由于BV可能涉及选择一个出价比最低出价者更昂贵的承包商,因此我们试图衡量所选承包商相对于低出价备选方案的成本。结果表明,虽然bv采购的承包商的平均报价确实有溢价,但他们的报价仍然低于市场价格。此外,雇用bv采购的承包商在项目成本和进度绩效方面对业主有利。本研究通过开发两个新指标——BV溢价和总BV成本——来定量衡量采用BV采购在D-B-B范围内购买建筑服务的业主的项目成本影响,从而为知识体系做出贡献。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Does Best Value Procurement Cost More than Low-Bid? A Total Project Cost Perspective
ABSTRACT Although construction owners have long utilized Best-Value (BV) procurement within alternative delivery, they have historically been less willing to do so when selecting contractor teams in traditional Design-Bid-Build (D-B-B). In D-B-B, the availability of 100% complete construction documents implies that the lowest bidder should be selected. As conventional wisdom suggests, why select a more expensive contractor only to receive an equivalent scope of work in return? In response to this question, this study investigated the full cost implications to owners who utilized BV procurement within 118 D-B-B projects. Because BV involves potentially selecting a contractor whose bid is more expensive than the lowest bidder, an attempt was made to measure the cost of the selected contractor relative to the low bid alternative. Results indicated that while BV-procured contractors do come at a premium on average, they still provide lower bids than the market rate. Further, employing BV-procured contractors can be beneficial to owners in terms of project cost and schedule performance. This study contributes to the body of knowledge by developing two new metrics–the BV Premium and Total BV Cost–to quantitatively measure the project cost implications for owners who employ BV procurement to buy construction services within D-B-B.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.80
自引率
0.00%
发文量
19
期刊介绍: The International Journal of Construction Education and Research is a respected international refereed journal that publishes original works that address cutting edge issues related to construction around the globe. The Journal supports the mission of the Associated Schools of Construction (ASC), a professional association comprised of about 100 universities and colleges. The ASC encourages the sharing of ideas and knowledge and promotes excellence in curricula, teaching, research and service relating to the construction industry.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信