{"title":"电力列车机架连接螺栓时变可靠性分析","authors":"Yonghua Li, P. Zhi, Yue Xu, Q. Gong","doi":"10.1680/jfoen.20.00006","DOIUrl":null,"url":null,"abstract":"Due to variables in design, manufacturing and working conditions, the working loads of connecting bolts for motor hangers in electric-multiple-unit trains are uncertain. To reduce this uncertainty ...","PeriodicalId":42902,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Time-variant reliability analysis of motor-hanger connecting bolts in electric trains\",\"authors\":\"Yonghua Li, P. Zhi, Yue Xu, Q. Gong\",\"doi\":\"10.1680/jfoen.20.00006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to variables in design, manufacturing and working conditions, the working loads of connecting bolts for motor hangers in electric-multiple-unit trains are uncertain. To reduce this uncertainty ...\",\"PeriodicalId\":42902,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Forensic Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2019-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Forensic Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jfoen.20.00006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Forensic Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jfoen.20.00006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Time-variant reliability analysis of motor-hanger connecting bolts in electric trains
Due to variables in design, manufacturing and working conditions, the working loads of connecting bolts for motor hangers in electric-multiple-unit trains are uncertain. To reduce this uncertainty ...